Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] Category:Licensee Response to Notice of Violation
[Table view] |
Text
,.Entergy GNRO-2008/00073 November 13,2008 U.S.Nuclear Regulatory Commission Washington, D.C.20555-0001 Entergy Operations, Inc.7003 Bald Hill Fjoad PO.Box 756 Port Git)SOIl, MS 39150 Tel 601 A37 669A Michael A.Krupa Director Nuclear Safety Assurance Attention:
Subject:
Reference:
Document Control Desk Reply to Notice of Violation EA-98-295 Grand Gulf Nuclear Station, Unit 1 Docket No.50-416 License No.NPF-29 GNRI-2008/00092, NRC Integrated Inspection Report Dated 10/17/08
Dear Sir or Madam:
Entergy Operations, Inc.(EOI)hereby submits the Reply to Notice of Violation295 for Grand Gulf Nuclear Station.This Notice of Violation was issued in NRC I nspection Report 05000416/2008004.
The inspection was conducted during the period of June 22 through September 20, 2008.EOI concurs that the overall findings of the inspection are valid in that the specific example identified is indicative of failure to follow established station procedures.
Should you have any questions or require clarification of our response, please contact this office at 601-437-6219.
Yours truly, MAKlJEO:jeo attachment:
Response to Notice of Violation; EA-08-295 GNRO-2008/00073 Page 2 cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 u.S.Nuclear Regulatory Commission ATTN: Mr.Elmo E.Collins, Jr.(w/2)Regional Administrator, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 u.S.Nuclear Regulatory Commission ATTN: Mr.Carl F.Lyon, NRRlADRO/DORL (w/2)ATTN: ADDRESSEE ONLY ATTN: U.S.Postal Delivery Address Only Mail Stop OWFN/8 81 Washington, D.C.20555-0001 ATIACHMENT1 RESPONSE TO NOTICE OF VIOLATION EA-OS-295 GNRO-2008/00073 Attachment to GNRO-2008/00073 Page 1 of 2 RESPONSE TO NOTICE OF VIOLATION I.Cited Violation During an NRC inspection conducted on June 22 through September 20, 2008, a violation of NRC requirements was identified.
In accordance with the NRC Enforcement Policy, the violation is listed below: 10 CFR 50, Appendix B, Criterion V,"Instructions, Procedures and Drawings," states in part, that activities affecting quality shall be accomplished in accordance with prescribed procedures.
Contrary to this requirement, from March 16 through July 9, 2008, the licensee failed to accomplish an activity affecting quality in accordance with prescribed procedures.
Specifically, the licensee failed to perform an adequate inspection of probable maximum precipitation door seals protecting safety-related equipment as prescribed in Procedure07-S-14-310,"Inspection of Mechanical Seals on Doors," revision 5.This violation is associated with a Green SDP finding.II.The Reason for the Violation Entergy admits to the violation as described in the inspection report.Specifically,"the licensee failed to accomplish an activity affecting quality in accordance with prescribed procedures." This violation was the result of personnel failure to follow plant procedure 07-S-14-310,"Inspection of Mechanical Seals on Doors".III.Corrective Steps Which Have Been Taken and Results Achieved Appropriate actions were taken to address the inadequate performance of the inspection for the individual involved.Additionally, during a shop brief, expectations for properly following procedures, with particular emphasis on inspection of PMP door seals, was covered with all personnel who may perform this work.Compensatory measures for deficient PMP door seals specified in plant procedureS-14-310,"Inspection of Mechanical Seals on Doors," were implemented.
Implementation of the compensatory actions brought GGNS back into procedural compliance on July 09, 2008.As a result of this violation seal inspection frequency was evaluated and determined to be a possible contributing factor.To address this possible contributing factor the inspection frequency was changed from yearly to quarterly.
This change was recently implemented and therefore sufficient data is not yet available to validate the acceptability of this change.
Attachment to GNRO-2008/00073 Page 2 of 2 IV.Corrective Steps to be Taken to Preclude Further Violations As stated previously, the inspection frequency was changed therefore going forward PMP door seals will be inspected on a quarterly basis rather than yearly.V.Date When Full Compliance Will be Achieved Entergy returned to full compliance with the procedure by reestablishing the compensatory actions on July 9, 2008.