Grand Gulf Nuclear Station - NRC Integrated Inspection Report 05000416/2017004 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2017001
ML18040A639
Person / Time
Site: Grand Gulf  
Issue date: 02/09/2018
From: Kozal J W
NRC/RGN-IV/DRP
To: Emily Larson
Entergy Operations
Jason Kozal
References
IR 2017001, IR 2017004
Download: ML18040A639 (35)


Text

February 9, 2018

Mr. Eric Larson Site Vice President Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION

- NRC INTEGRATED INSPECTION REPORT 05000416/2017004 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION REPORT 0 72000 50/2017001

Dear Mr. Larson:

On December 31, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Grand Gulf Nuclear Station. On January 10, 2018, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading

-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Sincerely,/RA G.Miller for/ Jason Kozal, Branch Chief Project Branch C Division of Reactor Projects UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011

-4511 E.Larson2 Docket No. 50-416 and 72-050 License No. NPF-29

Enclosure:

Inspection Report 05000416/2017004 and 07200050/2017001 w/

Attachment:

Supplemental Information

x SUNSI Review: ADAMS: Non-Publicly Availablex Non-Sensitive Keyword: By: x Yes No x Publicly AvailableSensitive NRC-002 OFFICE SRI:DRP/C RI:DRP/C BC:DRS/EB1 BC:DRS/EB2 BC:DRS/OB BC:DRS/PSB2 NAME MYoung NDay TFarnholtz GWerner VGaddy HGepford SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 01/24/2018 01/29/2018 01/25/2018 01/25/2018 01/24/2018 01/24/2018 OFFICE TL:DRS/IPAT RIV:DNMS SPE:DRP/C BC:DRP/C NAME THipschman ESimpson CYoung JKozal SIGNATURE /RA/HAF for /RA/ /RA/ /RA/GMiller for DATE 2/8/2018 1/26/2018 01/2 5/2018 2/9/18 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket: 0500 0 416 and 0 72 000 50 License: NPF-29 Report: 05000 416/20 17 0 04 and 0 72 00050/2017001 Licensee: Entergy Operations, Inc.

Facility: Grand Gulf Nuclear Station, Unit 1 Location: 7003 Baldhill Road Port Gibson, MS 39150 Dates: October 1 through December 3 1, 20 17 Inspectors:

M. Young, Senior Resident Inspector N. Day, Resident Inspector B. Correll, Reactor Inspector S. Hedger, Emergency Preparedness Inspector E. Love, Senior Inspector, DSFM NMSS N. Okonkwo, Reactor Inspector E. Simpson, ISFSI Inspector, FCDB C. Speer, Resident Inspector C. Stott, Reactor Inspector F. Thomas, Resident Inspector Approved By: Jason Kozal Chief, Project Branch C Division of Reactor Projects

2

SUMMARY

IR 05000 416/20 17 0 04 and 0 72 000 50/2017 001; 10/01/20 17 - 12/31/20 17; Grand Gulf Nuclear Station; Integrated Inspection Report.

The inspection activities described in this report were performed between October 1 and December 31, 2017, by the resident inspectors at Grand Gulf Nuclear Station

, inspectors from the NRC's Region IV office, and other NRC offices. The significance of inspection findings is indicated by their color (i.e., Green, greater than Green, White, Yellow, or Red), determined using Inspection Manual Chapter 0609, "Significance Determination Process," dated April 29, 2015. Their cross-cutting aspects are determined using Inspection Manual Chapter 0310, "Aspects within the Cross-Cutting Areas," dated December 4, 2014. Violations of NRC requirements are dispositioned in accordance with the NRC Enforcement Policy.

The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG

-1649, "Reactor Oversight Process," dated July 2016. No findings were identified.

3

PLANT STATUS

On October 1, 2017, operations personnel were commencing a restart from a forced outage. On October 18, 2017, operations personnel increased power to 100 percent following the forced outage. On November 1 6 , 2017, operations personnel performed a plant shutdown to repair a degrading reactor recirculation pump B seal assembly, and entered Mode 4 on November 17, 2017. On November 24, 2017, operations personnel performed a start up; however , due to an issue with neutron monitoring instrumentation, operations personnel transitioned to perform a plant shutdown , and entered M ode 4 on November 25, 2017. On December 1 , 2017, operations personnel performed a startup from a forced outage

however , due to drywell cooler issues , operations personnel transitioned to perform a plant shutdown and entered M ode 4 on December 6, 2017. On December 1 0 , 2017, operations personnel commenced a restart from a forced outage. On Decemb er 16, 2017 , at approximately 68 percent power, operations personnel reduced power to approximately 50 percent power due to a reduction in plant service water system capability.

On December 18, 2017, operations personnel further reduced power to 23 percent , due to vibrational concerns in the reactor re circulation system.

On December 21, 2017, operations personnel commenced power ascension after restoration of the plant service water system capability.

On December 31, 2017, Grand Gulf Nuclear Station was at approximately 90 percent power.

REPORT DETAILS

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity 1 R 01 Adverse Weather Protection (71111.01)

Readiness for Seasonal Extreme Weather Conditions

a. Inspection Scope

On December 13, 2017, the inspectors completed an inspection of the station's readiness for seasonal extreme weather conditions. The inspectors reviewed the licensee's adverse weather procedures for cold weather protection and evaluated the licensee's implementation of these procedures. The inspectors verified that prior to cold weather, the licensee had corrected weather

-related equipment deficiencies identified during the implementation of the cold weather protection procedure

.

The inspectors selected four risk-significant systems that were required to be protected from cold weat h er: Standby service water pumphouse A and B and standby service water valve nest Room A and B Firewater pumphouse Condensate storage tank area Water treatment building (contains plant air compressors) The inspectors reviewed the licensee's procedures and design information to ensure the systems would remain functional when challenged by cold weather The inspectors verified that operator actions described in the licensee's procedures were adequate to maintain readiness of these systems. The inspectors walked down portions of these systems to verify the physical condition of these systems were prepared for seasonal cold weather.

These activities constituted one sample of readiness for seasonal adverse weather, as defined in Inspection Procedure 71111.01.

b. Findings

No findings were identified.

1 R 04 Equipment Alignment (71111.04)

Partial Walk

-Down

a. Inspection Scope

The inspectors performed partial system walk

-downs of the following risk-significant systems: November 2, 2017, standby diesel generator B starting air system, due to recent inspections to determine extent of condition (cracks on intake air system)

November 7, 2017, residual heat removal (RHR) subsystem A and B, following RHR pump A replacement The inspectors reviewed the licensee's procedures and system design information to determine the correct lineup for the systems. They visually verified that critical portions of the systems were correctly aligned for the existing plant configuration.

These activities constituted two partial system walk

-down sample s , as defined in Inspection Procedure 71111.04.

b. Findings

No findings were identified.

1 R 05 Fire Protection (71111.05)

Quarterly Inspection

a. Inspection Scope

The inspectors evaluated the licensee's fire protection program for operational status and material condition. The inspectors focused their inspection on six plant areas important to safety:

October 23, 2017, Areas 1T307 and 1T309, main feedwater pump roo ms November 7, 2017, Areas 1A103 and 1A203, RHR A pump room and pipe penetration room November 7, 2017, Areas 1A105, 1A106, and 1A205 , RHR B pump room, RHR B heat exchanger room, and RHR B pipe penetration room November 7, 2017, Area WTB-02, water treatment building November 7, 2017, Area CWPH-01, circulating pump house November 7, 2017, Area FWPH-01, firewater pump house For each area, the inspectors evaluated the fire plan against defined hazards and defense-in-depth features in the licensee's fire protection program. The inspectors evaluated control of transient combustibles and ignition sources, fire detection and suppression systems, manual firefighting equipment and capability, passive fire protection features, and compensatory measures for degraded conditions.

These activities constituted six quarterly inspection samples, as defined in Inspection Procedure 71111.05.

b. Findings

No findings were identified.

1 R 06 Flood Protection Measures (71111.06)

a. Inspection Scope

On November 30, 2017 , the inspectors completed an inspection of the station's ability to mitigate flooding due to internal causes. After reviewing the licensee's flooding analysis, the inspectors chose two plant areas containing risk

-significant structures, systems, and components that were susceptible to flooding:

RHR A pump room Reactor core isolation cooling pump room The inspectors reviewed plant design features and licensee procedures for coping with internal flooding. The inspectors walked down the selected areas to inspect the design features, including the material condition of seals, drains, and flood barriers. The inspectors evaluated whether operator actions credited for flood mitigation could be successfully accomplished.

These activities constituted completion of two flood protection measures sample s, as defined in Inspection Procedure 71111.06.

b. Findings

No findings were identified.

1 R 11 Licensed Operator Requalification Program and Licensed Operator Performance (71111.11)

.1 Review of Licensed Operator Requalification

a. Inspection Scope

On November 30, 2 017, the inspectors observed simulator training for an operating crew. The inspectors assessed the performance of the operators and the evaluators' critique of their performance. The inspectors also assessed the modeling and performance of the simulator during the requalification activities

. These activities constituted completion of one quarterly licensed operator requalification program sample, as defined in Inspection Procedure 71111.11.

b. Findings

No findings were identified.

.2 Review of Licensed Operator Performance

a. Inspection Scope

The inspectors observed the performance of on

-shift licensed operators in the plant's main control room. The inspectors observed the operators' performance of the following activities:

October 19, 2017, Division 1 standby diesel generator fast start surveillance activities November 15 and November 16, 2017, shutdown activi ties due to a leak on the recirculation pump B seal November 23, 2017, reactor startup activities November 24, 2017, reactor startup activities In addition, the inspectors assessed the operators' adherence to plant procedures, including the conduct of operations procedure

, and other operations department policies.

These activities constituted completion of four quarterly licensed operator performance samples, as defined in Inspection Procedure 71111.11.

b. Findings

No findings were identified.

1 R 12 Maintenance Effectiveness (71111.12)

.1 Routine Maintenance Effectiveness

a. Inspection Scope

The inspectors reviewed two instances of degraded performance or condition of safety

-significant structures, systems, and components (SSCs):

November 2, 2017, Division 1 standby diesel generator, with emphasis on an identified crack on the intake pl enum November 25, 2017, reactor protection system

- instantaneous spike on intermediate range monitor (IRM) Channels A, C, and D, resulting in half SCRAM condition The inspectors reviewed the extent of condition of possible common cause SSC failures and evaluated the adequacy of the licensee's corrective actions. The inspectors reviewed the licensee's work practices to evaluate whether these may have played a role in the degradation of the SSCs. The inspectors assessed the licensee's characterization of the degradation in accordance with 10 CFR 50.65 (the Maintenance Rule), and verified that the licensee was appropriately tracking degraded performance and conditions in accordance with the Maintenance Rule.

These activities constituted completion of two maintenance effectiveness sample s, as defined in Inspection Procedure 71111.12.

b. Findings

No findings were identified.

.2 Quality Control

a. Inspection Scope

On November 21, 2017, the inspectors reviewed the licensee's quality control activities through a review of whether quality control verifications were proper ly specified in accordance with the licensee's Quality Assurance Program, and were implemented as specified, during work associated with the replacement of safety related equipment area temperature (NUS) switches

. These activities constituted completion of one quality control sample, as defined in Inspection Procedure 71111.12.

b. Findings

No findings were identified.

1 R 13 Maintenance Risk Assessments and Emergent Work Control (71111.13)

a. Inspection Scope

The inspectors reviewed one risk assessment performed by the licensee prior to changes in plant configuration and the risk management actions taken by the licensee in response to elevated risk:

November 17, 2017, risk assessment for maintenance on the recirculation system pump B which was an operation with potential to drain the vessel The inspectors verified that this risk assessment was performed timely and in accordance with the requirements of 10 CFR 50.65 (the Maintenance Rule) and plant procedures. The inspectors reviewed the accuracy and completeness of the licensee's risk assessment and verified that the licensee implemented appropriate risk management actions based on the result s of the assessment.

The inspectors also observed portions of one emergent work activity that had the potential to cause an initiating event or to affect the functional capability of mitigating systems.

October 27, 2017 , the loss of the 115 kV (Port Gibson to Engineered Safety Feature transformer 12) offsite supply line The inspectors verified that the licensee appropriately developed and followed a work plan for these activities. The inspectors verified that the licensee took precautions to minimize the impact of the work activities on unaffected SSC s. These activities constituted completion of two maintenance risk assessments and emergent work control inspection sample s, as defined in Inspection Procedure 71111.13.

b. Findings

No findings were identified.

1 R 15 Operability Determinations and Functionality Assessments (71111.15)

a. Inspection Scope

The inspectors reviewed three operability determinations that the licensee performed for degraded or nonconforming SSCs:

October 3, 2017 , operability of the high pressure core spray jockey pump due to indication of high vibrations as identified in Grand Gulf Nuclear Station Condition Report CR-GGN-2017-09935 November 9, 2017, operability of the Division 1 standby diesel generator due to issue identified in Grand Gulf Nuclear Station Condition Report CR-GGN-2017-10566 December 21, 2017, operability of the Division 3 GE Magnablast breakers due to issue identified in Grand Gulf Nuclear Station Condition Report CR-GGN-2017-10963 The inspectors reviewed the timeliness and technical adequacy of the licensee's evaluations. Where the licensee determined the degraded SSC to be operable, the inspectors verified that the licensee's compensatory measures were appropriate to provide reasonable assurance of operability. The inspectors verified that the licensee had considered the effect of other degraded conditions on the operability of the degraded SSC.

These activities constituted completion of three operability review sample s , as defined in Inspection Procedure 71111.15.

b. Findings

No findings were identified.

1 R 19 Post-Maintenance Testing (71111.19)

a. Inspection Scope

The inspectors reviewed two post-maintenance testing activities that affected risk

-significant SSCs:

November 7, 2017, the high pressure core spray jockey pump following pump replacement November 7, 2017, the Division 3 emergency diesel generator following a scheduled maintenance outage The inspectors reviewed licensing

- and design

-basis documents for the SSCs and the maintenance and post-maintenance test procedures. The inspectors observed the performance of the post

-maintenance tests to verify that the licensee performed the tests in accordance with approved procedures, satisfied the established acceptance criteria, and restored the operability of the affected SSCs.

These activities constituted completion of two post-maintenance testing inspection sample s , as defined in Inspection Procedure 71111.19.

b. Findings

No findings were identified.

1 R 20 Refueling and Other Outage Activities (71111.20)

a. Inspection Scope

During the station's forced outages , that occurred from:

November 1 6 to November 24 , 2017; November 25 to December 1 , 2017; December 6 to December 10, 2017; the inspectors evaluated the licensee's outage activities. The inspectors verified that the licensee considered risk in developing and implementing the outage plan, appropriately managed personnel fatigue, and developed mitigation strategies for losses of key safety functions. This verification included the following: Review and verification of the licensee's fatigue management activities Monitoring of shut

-down and cool

-down activities Verification that the licensee maintained defense

-in-depth during outage activities Observation and review of operations with a potential for draining the reactor vessel (BWR)

Monitoring of heat

-up and startup activities These activities constituted completion of three outage activities samples, as defined in Inspection Procedure 71111.20.

b. Findings

No findings were identified.

1 R 22 Surveillance Testing (71111.22)

a. Inspection Scope

The inspectors observed one ris k-significant surveillance test and reviewed test results to verify that this test adequately demonstrated that the SSCs were capable of performing their safety functions:

Reactor coolant system leak detection test

November 15, 2017, drywell unidentified and identified leakage detection surv eillance The inspectors verified that this test met technical specification requirements, that the licensee performed the test in accordance with its procedure, and that the results of the test satisfied appropriate acceptance criteria.

These activities constituted completion of one surveillance testing inspection sample, as defined in Inspection Procedure 71111.22.

b. Findings

No findings were identified.

Cornerstone:

Emergency Preparedness 1 EP 6 Drill Evaluation (71114.06)

.1 Emergency Preparedness Drill Observation

a. Inspection Scope

The inspectors observed an emergency preparedness drill on October 25, 2017, to verify the adequacy and capability of the licensee's assessment of drill performance. The inspectors reviewed the drill scenario, observed the drill from the technical support center, operations support center and simulator, and attended the post

-drill critique. The inspectors verified that the licensee's emergency classifications, off

-site notifications, and protective action recommendations were appropriate and timely. The inspectors verified that any emergency preparedness weaknesses were appropriately identified by the licensee in the post

-drill critique and entered into the corrective action program for resolution.

These activities constituted completion of one emergency preparedness drill observation sample, as defined in Inspection Procedure 71114.06.

b. Findings

No findings were identified.

.2 Training Evolution Observation

a. Inspection Scope

On November 30, 2 017, the inspectors observed simulator

-based licensed operator requalification training that included implementation of the licensee's emergency plan. The inspectors verified that the licensee's emergency classifications, off

-site notifications, and protective action recommendations were appropriate and timely. The inspectors verified that any emergency preparedness weaknesses were appropriately identified by the evaluators and entered into the corrective action program for resolution.

These activities constituted completion of one training observation sample, as defined in Inspection Procedure 71114.06.

b. Findings

No findings were identified.

OTHER ACTIVITIES

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, Emergency Preparedness, Public Radiation Safety, Occupational Radiation Safety, and Security 4OA 1 Performance Indicator Verification (71151)

.1 Reactor Coolant System Specific Activity (BI01)

a. Inspection Scope

The inspectors reviewed the licensee's reactor coolant system chemistry sample analyses for the period of October 1, 2016 , through September 30, 2017 , to verify the accuracy and completeness of the reported data. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, to determine the accuracy of the reported data.

These activities constituted verification of the reactor coolant system specific activity performance indicator, as defined in Inspection Procedure 71151.

b. Findings

No findings were identified.

.2 Reactor Coolant System Identified Leakage (BI02)

a. Inspection Scope

The inspectors reviewed the licensee's records of reactor coolant system total leakage for the period October 1, 2016, through September 30, 2017 , to verify the accuracy and completeness of the reported data. The inspectors observed the performance of Procedure 06-OP-1000-D-0001, "Daily Operating Logs," Revision 149 , on November 15, 2017. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, to determine the accuracy of the reported data.

These activities constituted verification of the reactor coolant system leakage performance indicator, as defined in Inspection Procedure 71151.

b. Findings

No findings were identified.

.3 Drill/Exercise Performance (EP01)

a. Inspection Scope

The inspector reviewed the licensee's evaluated exercises, emergency plan implementations, and selected drill and training evolutions that occurred between October 2016, and September 2017, to verify the accuracy of the licensee's data for classification, notification, and protective action recommendation (PAR) opportunities. The inspector reviewed a sample of the licensee's completed classifications, notifications, and PARs to verify their timeliness and accuracy. The inspector used Nuclear Energy Institute Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, to determine the accuracy of the reported data. The specific documents reviewed are described in the attachment to this report.

These activities constituted verification of the drill/exercise performance indicator, as defined in Inspection Procedure 71151.

b. Findings

No findings were identified.

.4 Emergency Response Organization Drill Participation (EP02)

a. Inspection Scope

The inspector reviewed the licensee's records for participation in drill and training evolutions between October 2016, and September 2017, to verify the accuracy of the licensee's data for drill participation opportunities. The inspector verified that all members of the licensee's emergency response organization (ERO) in the identified key positions had been counted in the reported performance indicator data. The inspector reviewed the licensee's basis for reporting the percentage of ERO members who participated in a drill. The inspector reviewed drill attendance records and verified a sample of those reported as participating. The inspector used Nuclear Energy Institute Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7 , to determine the accuracy of the reported data. The specific documents reviewed are described in the attachment to this report.

These activities constituted verification of the emergency response organization drill participation performance indicator

, as defined in Inspection Procedure 71151.

b. Findings

No findings were identified.

.5 Alert and Notification System Reliability (EP03)

a. Inspection Scope

The inspector reviewed the licensee's records of alert and notification system tests conducted betwe en October 2016, and September 2017, to verify the accuracy of the licensee's data for siren system testing opportunities. The inspector reviewed procedural guidance on assessing alert and notification system opportunities and the results of periodic alert and notification system operability tests. The inspector used Nuclear Energy Institute Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, to determine the accuracy of the reported data. The specific documents reviewed are described in the attachment to this report

. These activities constituted verification of the alert and notification system reliability performance indicator, as defined in Inspection Procedure 71151.

b. Findings

No findings were identified.

4OA2 Problem Identification and Resolution

.1 Routine Review

a. Inspection Scope

Throughout the inspection period, the inspectors performed daily reviews of items entered into the licensee's corrective action program and periodically attended the licensee's condition report screening meetings. The inspectors verified that licensee personnel were identifying problems at an appropriate threshold and entering these problems into the corrective action program for resolution. The inspectors verified that the licensee developed and implemented corrective actions commensurate with the significance of the problems identified. The inspectors also reviewed the licensee's problem identification and resolution activities during the performance of the other inspection activities documented in this report.

b. Findings

No findings were identified.

.2 Semiannual Trend Review

a. Inspection Scope

The inspectors reviewed the licensee's corrective action program, performance indicators, system health reports, planned technical specification required surveillance s , backlog list (included in the plan of the day report) of near late surveillance requirements, and other documentation to identify trends that might indicate the existence of a more significant safety issue. The inspectors verified that the licensee was taking corrective actions to address identified adverse trends.

These activities constituted completion of one semiannual trend review sample, as defined in Inspection Procedure 71152. b. Observations and Assessments The in spectors noted the Grand Gulf Nuclear Station has had a rise in the backlog of surveillance activities required for technical specification equipment. As of December 11, 2017, Grand Gulf Nuclear Station had 126 past due surveillance s (past due, in grace), whereas the other eight Entergy operating sites have a combined total of 189. The in spectors focused on the missed surveillance s relating to:

T u rbine bypass stop and control valve (went late October 2 , 2017 , CR-GGN-2017-10234) Average power range monitor, Channel 3 , functional test (went late October 7 , 2017, CR-GGN-2017-10105)

Reactor core isolation cooling (RCIC)tur bine exhaust diaphram high pressure calibration Channel F (Did not perform on Channel F due to procedure change, CR-GGN-2017-0 7232) Division 2 drywell purge supply initial vacuum relief valve (failed testing during Division 1 week, CR

-GGN-2017-10756) The inspectors noted that there were examples involving the performance of multidivision al work at the same time, which ultimately required the station to declare multiple divisions of equipment out of service in accordance with Technical Specifications when equipment failed testing. The in spectors noted that the planned schedule of activities was not rigorously followed due to a variety of issues. These issues includ e d unplanned equipment failures, competing priorities

, and changes in procedures compounded with human performance errors. The inspectors discussed the examples with the station surveillance coordinat or and production manager , including planned corrective actions. The station does have corrective actions in place to improve the scheduling of future surveillance s based on using a n electronic database and program (PRIMAVERA) and creating a more descriptive performance indicator for past due surveillance test procedures for tracking, trending, and scheduling purposes

. However , the inspectors noted that the surveillance requirement frequency grace period for the RCIC quarterly pump surveillance was exceeded on December 12, 2017, before performing the surveillance requirement, which is indicative of Grand Gulf Nuclear Station still having issues in this area

. An issue involving generator seal oil trouble, CR-GGN-2017-12266, was prioritized over the completion of the RCIC surveillance on or before the late date.

c. Findings

No findings were identified.

.3 Annual Follow

-up of Selected Issues

a. Inspection Scope

The inspectors selected one issue for an in

-depth follow

-up: On August 27, 2017, Grand Gulf Nuclear Station declared residual heat removal (RHR) pump A (1E12C002A) inoperable due to a failure to meet the applicable technical specification surveillance test requirement. RHR pump A did not develop the required differential pressure at the flow rate as described in the licensee's procedures. As a result, RHR pump A was declared inoperable to perform its safety

-related function to provide low pressure core injection during an accident scenario. The safety

-related function for the plant was not lost since RHR pumps B and C were both still operable during this time. This failure follow ed a previous September 26, 2016 , failure of the RHR pump A to develop sufficient differential pressure during a technical specification surveillance test.

On November 8, 2017, the inspectors completed a focused baseline inspection review of the events as documented in the licensee's critical decision document dat ed September 29, 2017, and an equipment apparent c ause evaluation dated Janua ry 9, 2017. These documents assessed the condition of the RHR pump A after each respective failure to meet the technical specification surveillance test requirement.

The inspectors assessed the licensee's problem identification threshold, the proposed apparent causes for the failures of RHR pump A, and the resolution of the identified problems. The inspectors verified that the actions proposed by the licensee have been implemented and that RHR pump A is operable after pump replacement.

These activities constituted completion of one annual follow-up sample , as defined in Inspection Procedure 71152.

b. Findings

No findings were identified.

4OA 5 Other Activities Operation of an Independent Spent Fuel Storage Facility at Operating Plants (60855.1)

a. Inspection Scope

A routine independent spent fuel storage installation (ISFSI) inspection was conducted at the Grand Gulf Nuclear Station (GGNS) ISFSI on November 27-30, 2017, by an NRC Region IV Division of Nuclear Material Safety inspector and a Division of Spent Fuel Management inspector from NRC Headquarters. The inspector s observed spent fuel assemblies being processed for dry cask storage in the Holtec International (Holtec) Model MPC-68M multi-purpose canister (MPC) and reviewed the licensee's fuel loading and heavy load procedures associated with their current dry cask loading campaign. The inspectors performed a review of the spent fuel assembly characteristics that had been selected for placement into dry cask storage in the MPC s for the current campaign, to verify that the licensee was loading fuel in accordance with the Holtec Certificate of Compliance (CoC)1014 technical specification (TS) approved contents.

The inspectors reviewed documents which included completed copies of Entergy Procedur e EN-DC-215, "Fuel Selection for Holtec Dry Cask Storage," Revision 8 , for each MPC being loaded. The procedure included MPC-68M loading maps and other key spent fuel assembly qualification information, including decay heat (kW), cooling time (years), average initial U-235 enrichment (%), and nuclear fuel utilization data (MWd/MTU) on a per assembly basis.

During the NRC inspection, dry cask storage operations at GGNS were proceeding smoothly. GGNS had not experienced any problems loading fuel into the newer Holtec MPC-68M canister design. All of the fuel loading operations and MPC processing equipment were observed to be operating well. The processing equipment included the automated welding machine and forced helium dehydration equipment. NRC inspectors were on hand to observe the welding of the initial, root, and intermediate pass of the MPC-68M lid to shell weld for canister number four of the six canister loading campaign s. The NRC inspectors also observed the liquid dye penetrant testing (PT) of those welds. Following the final weld pass and the hydro pressure testing of the MPC, the final PT of the lid to shell weld was performed. All of the PT tests passed satisfactorily before the licensee continued welding or further processing of the MPC.

Prior to final drying of the fuel contents, excess water in the MPC was removed and returned to the spent fuel pool. Forced helium dehydration (FHD), a proprietary Holtec method of drying the spent fuel contents of an MPC, ensured that the spent fuel assemblies were sufficiently dry for long term storage. After FHD operations were completed, the MPC was backfilled with ultra

-pure helium to provide an inert environment with acceptable heat transfer characteristics to allow for the spent fuel to cool while in long-term storage. The drying and helium backfill provide an inert environment that inhibits corrosion of the spent fuel and associated components. The NRC inspectors observed the successful helium leak test of MPC number four and the welding and PT exam of the MPC final closure rings.

The MPC was downloaded into the Holtec HI

-STORM over

-pack on the fourth day of the NRC inspection. A vertical cask transporter moved the loaded HI

-STORM onto the GGNS ISFSI pad, presumably on day

-five. The NRC ISFSI inspectors were not present for that evolution. There were two NRC resident inspectors at the site who were available if a problem had occurred.

The GGNS ISFSI is located approximately 9 00 feet northeast of the GGNS reactor building. The ISFSI pad is a 1 96 foot by 61 foot concrete pad designed to hold a 4 by 12

(48) array of Holtec HI

-STORM 100 storage casks. However, GGNS administratively limits the pad to 44 storage casks. The last space in each row is being left empty for temporary storage during cask movement operation s. The NRC inspector s verified the radiological conditions of the GGNS ISFSI through a review of recent site radiological survey s and a walk-down of the ISFSI pad with radiation survey instrumentation. The ISFSI pad was clear of vegetative growth and there were no unexpected combustible or flammable items present on the pad. Some operational items were stored in a metal container on one corner of the ISFSI pad. None of those items presented a fire hazard. The ISFSI was appropriately posted as a radioactive materials area (RMA) with an exclusion area boundary established with stanchions and a yellow and magenta chain around the loaded casks. The ISFSI pad contained 31 loaded HI

-STORM 100 casks. The HI-STORM casks were observed to be in good condition. The concrete of the ISFSI pad was also observed to be in good physical condition. ISFSI fence line, pad boundary, and selected HI

-STORM inlet vent radiation levels were verified by an NRC inspector using a sodium

-iodide (NaI) scintillation type radiation detector calibrated to estimate gamma exposure rates in micro-roentgens per hour (µR/h). The NRC inspector used a Ludlum Model

-19 (NRC #015546, calibration due October 2018) detector. The measurements taken by the NRC inspector confirmed the measurements recorded on the most recent ISFSI survey. General ISFSI area radiation levels were 100 - 480 µR/h outside of the posted exclusion area boundary. As expected, the highest radiation levels were found in close proximity to the HI

-STORM inlet vents. A group of randomly selected HI

-STORM inlet screens measured from 1 to 2.2 mR/h

. The licensee provided the NRC inspectors with area monitoring program r ecords for thermoluminescent dosimeters (TLDs) placed along the northern side of the outer fence surrounding the ISFSI pad. Those monitoring results show that for 201 6 and 201 7 an individual situated at or near the ISFSI north exclusion fence would experience a maximum occupational dose of about 70 mrem per year. This was below the 10 CF R 20.1502(a)(1) regulatory limit of 500 mrem per year for unmonitored workers.

As a result, site workers need not be monitored for occupational dose for work activities performed near to, but outside of the ISFSI exclusion fence

. The radiation protection program requires that all persons accessing the ISFSI to make an official radiologically controlled area entry, which requires personnel dosimetry and an electronic dosimeter for real-time dose monitoring

. The GGNS radiological environmental monitoring program (REMP) perform s onsite and offsite monitoring for radioactive effluents (gaseous and liquid), airborne particulates, and direct radiation impacts to the local onsite and offsite environment s due to operations at the reactor site. GGNS' REMP has 29 fixed TLD monitoring locations to measure direct radiation impacts. The site boundary TLD monitoring station located in closest proximity to the ISFSI was station M100

, located in the northeastern monitoring sector of the reactor site. As required by 10 CFR 72.104(a)(2)

, the direct radiation from the ISFSI must not exceed 25 mrem per year to any real individual located beyond the owner controlled area. The NRC inspectors reviewed the annual REMP reports for 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16109A273)and 2016 (ADAMS Accession No.

ML17117A685). The results for TLD monitoring station M100 were only slightly elevated when compared to the offsite control location, M14. The monitoring results from station M100 for 2015 and 2016 averaged 1.1 mrem per year more than the control location. The 1.1 mrem elevation is likely more due to random fluctuations in background than actual direct influence from the ISFSI at the M100 location. The monitoring results show that the ISFSI had a negligible radiological impact at the site boundary. The requirements of 1 0 CFR 72.104 are being met at GGNS.

The NRC inspector s reviewed the daily temperature monitoring surveillance records for the randomly selected weeks of January 3, 201 5; September 11, 2016; and February 25, 2017 , to ensure that the Holtec HI-STORM 100 System CoC 101 4 TS 3.1.2 requiring daily temperature surveillance measurements were being achieved by the licensee. The inspectors requested documents and records related to the maintenance of the spent fuel cask handling crane (CHC) and the annual maintenance of the licensee's special lifting devices. The inspectors reviewed licensee documents that demonstrated the cask handling crane was inspected within the past year in accordance with the requirements of the American Society of Mechanical Engineers (ASME)

B 30.2, "Overhead and Gantry Cranes," standards , prior to the current dry fuel loading campaign. Records reviewed by NRC included periodic and frequent preventive maintenance testing and electrical testing records for the CHC in use at GGNS. The testing and preventive maintenance records were satisfactory and included functional inspections of the trolley, hoist, sheaves, wire rope, main hook, oil levels, specific electrical parameters, et al.

The annual maintenance required by American National Standards Institute (ANS I) N14.6, "Radioactive Materials

- Special Lifting Devices for Shipping Containers Weighing 10,000 Pounds or More,"

was completed for the following special lifting devices: Holtec HI-TRAC Transfer Cask; HI

-TRAC Lift Yoke; and HI

-STORM Lift Brackets. The licensee performed specific visual, dimensional, and nondestructive testing on the HI

-TRAC Lift Yoke lift pins, strong backs, and lift arms; HI

-TRAC Transfer Cask lift trunnion blocks; and HI

-STORM Lift Bracket s and strong backs. The HI-TRAC is a shielded temporary over

-pack used to facilitate the movement of a loaded MPC between the spent fuel pool and final storage within the HI

-STORM over

-pack on the ISFSI Pad. The HI

-TRAC Lift Yoke is an interfacing device that goes between the cask handling crane main hook and HI

-TRAC for lifting an empty or loaded MPC into or out of the spent fuel pool. The HI

-STORM Lift Brackets are interfacing devices that are used to connect the vertical cask transporter (VCT) to the HI

-STORM over

-pack for transportation to the ISFSI. The VCT lifts and transports the loaded HI

-STORM from outside the fuel building to the ISFSI pad. All of the aforementioned items had bee n subjected to visual, dimensional, and nondestructive examination by magnetic particle or liquid dye penetrant in critical areas prior to use in the current loading campaign at GGNS. An on-site review of the quality assurance (QA) audit and QA surveillance reports related to dry cask storage activities at GGNS was performed by the NRC inspectors. The licensee's QA department issued Quality Assurance Audit Report QA-20-2016-GG NS-1, "Independent Spent Fuel Storage Installation Program," dated September 15, 2016. The audit assessed GGNS' dry cask storage performance in eight areas which included

(1) Licensing Compliance;
(2) Design Control;
(3) Fuel Selection;
(4) Fuel Campaign Activities;
(5) Operational Surveillances;
(6) Corrective Action;
(7) Networking, Benchmarking, and Self

-Assessment; and

(8) Leadership and Management. The QA audit found GGNS' ISFSI program areas to be "effective with areas of concern.

" Many of the condition reports (CRs) reviewed by the NRC inspectors were generated as a result of this audit. Notably, the audit resulted in two quality assurance findings (QAFs). In the design control program element, a longstanding issue with the cask handling crane

's north load brake resulted in a QAF. That QAF and associated CRs resulted in the north load brake being repaired by site maintenance after several years of "use as is" status. The other QAF was related to the leadership and management program element. Within this program element, the audit identified a number of issues, including missed ISFSI inspections and surveillances, untimely ISFSI record s transmittals, 10 CFR 72.212 Evaluation Report discrepancies, et al. The problems that were identified by the audit team were indicative of an overall trend that was characterized "

i f not arrested, [would challenge

] the site's ability to perform inspections in accordance with [its] licensing basis.

" After careful review of many of the CRs related to the ISFSI audit, NRC inspectors agree with the site's QA findings.

There were no a dverse QAFs identified during the 2016 audit of ISFSI programs.

The licensee provided the inspectors with a list of cask handling crane (CHC) and ISFSI related CRs that were initiated since the last NRC inspection of November 2015. If problems were identified during routine ISFSI operations, the licensee documented the problems in the form of a CR which was placed in the licensee's corrective action program (CAP) for disposition. Of the list of CRs provided to NRC, 18 were selected by the NRC inspectors for further review. Many of the CHC and ISFSI related CRs were the result of a 2016 audit of the ISFSI program by GGNS QA staff (see preceding paragraphs). The CHC CRs were primarily related to longstanding problems with the cask handing crane's north load brake. Those issues were all dispositioned prior to the current dry fuel storage campaign. Lack of procedure adherence was a recurring theme of the CRs issued related to ISFSI operations. The CRs reviewed were well documented and properly categorized based on the safety significance of the identified issues. The specified corrective actions were assigned to the licensee's appropriate program office. Based on the types of conditions identified, the licensee's QA program demonstrated excellent insight into the processes, procedures, and equipment used by the GGNS ISFSI program. No NRC safety concerns were identified related to the CRs selected for additional review during th e inspection.

Even though no safety concerns were identified, it is important that GGNS look closely at the CRs generated by its internal 2016 QA audit and improve the performance of its ISFSI program before performance degrades further.

The licensee's most current 10 CFR 72.212 Evaluation Report was reviewed to verify that any changes implemented by the site were described and evaluated against the current Holtec HI

-STORM 100 Amendment requirements. The licensee was using Revision 11 for the GGNS 1 0 CFR 72.212 Evaluation Report at the time of the inspection, dated September 3, 2017. The current revision updated the site's 10 CFR 72.212 Evaluation Report for the adoption of the Holtec HI

-STORM CoC Amendment 9, Revision 1 , and Final Safety Analysis Report (FSAR), Rev i sion 13 , in order to use the Holtec MPC

-68M version of the multi

-purpose canister during its current dry fuel storage campaign. The associated 10 CFR 72.48 screenings for the 10 CFR 72.212 Evaluation Report update were reviewed. The screenings were determined to have been adequate and the changes to the 10 CFR 72.212 Evaluation Report were found to be still bounded by the applicable design bases.

The licensee's 10 CFR 72.48 screenings and evaluations for ISFSI program changes since the last NRC ISFSI inspection were reviewed to determine compliance with regulatory requirements. The majority of the 10 CFR 72.48 screenings were associated with ISFSI procedure updates. GGNS had performed approximately six procedure changes in support of its dry fuel storage program since the last NRC inspection. Those changes were evaluated using Entergy Fleet Procedures EN-LI-100, "Process Applicability Determination

," Revision 21 , and Procedure EN-LI-112, "10 CFR 72.48 Evaluations

," Revision 12. However, no full 10 CFR 72.48 safety evaluations were required for any of the changes that had been performed

. The licensee had not performed any 10 CFR 50.59 screenings or safety evaluations for the fuel building cask handling crane since the last inspection. The 10 CFR 72.48 screenings that were reviewed by the NRC inspectors were determined to have been adequately evaluated.

The inspector s observed that the licensee had met the licensing requirements for all of the documents and activities reviewed associated with the dry cask storage activities at GGNS.

b. Findings

No findings were identified.

4OA 6 Meetings, Including Exit

Exit Meeting Summary

On November 29, 2017, the inspector discussed the results of the onsite inspection of the licensee's emergency preparedness program to Mr. J. Seiter , Emergency Preparedness Manager, and other members of the licensee staff. On December 21, 2017, the final results were communicated to Mr.

E. Larson, Site Vice President, and other members of the licensee staff. The licensee acknowledged the issues presented. The licensee confirmed that any proprietary information reviewed by the inspectors had been returned or destroyed.

On November 30, 2017, the NRC presented the results of the ISFSI inspection to Mr. E. Larson, Site Vice President, and other members of the licensee staff.

Licensee personnel acknowledged the information presented. The inspector s asked the licensee whether any materials examined during the inspection should be considered propriety. No propriety information was identified. On January 10, 2018, the inspectors presented the inspection results to Mr. E. Larso n , Site Vice President, and other members of the licensee staff. The licensee acknowledged the issues presented. The licensee confirmed that any proprietary information reviewed by the inspectors had been returned or destroyed.

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTAC

T

Licensee Personnel

M. Campbell, Senior Manager, Entergy (River Bend) Dry Fuel Storage
J. Clements, Radiation Protection
D. Ellis, Specialist, Regulatory Assurance
E. Larson, Site Vice President
D. Neve, Manager, Regulatory Assurance
E. Riggs, Senior Project Manager, Dry Fuel Storage
J. Seiter, Manager, Emergency Preparedness

Other Contacts

G. Mclemore, Site Specialist, Technological Hazards Branch, FEMA Region IV
N. Williams, Chairperson, Radiological Assistance Committee, FEMA Region VI

LIST OF DOCUMENTS REVIEWED

Section 1R01: Adverse Weather Protection

Procedures

Number Title Revision 03-1-03-A30-1 Cold Weather Protection

23 Work Order

s 52746352 Section 1R04: Equipment Alignment

Drawings Number Title Revision M-1070B Standby Diesel Generator System

039 M-1085B Residual Heat Removal System

063 Procedures

Number Title Revision 04-1-01-E12-1 SU Residual Heat Removal System

147 04-1-01-P75-1 Standby Diesel Generator System

106

A - 2 Section 1R05: Fire Protection

Miscellaneous Documents

Number Title Revision A-02 Fire Preplan RHR A Pump Room 1A103, Heat Exch Room 1A102, Heat Exch Room 1A202, Pipe Penetration Room 1A203 00 2 A-04 Fire Preplan RHR B Pump Room 1A105, Heat Exch Room 1A106, Heat Exch Room 1A206, Pipe Penetration Room 1A205 00 2 CWPH-01 Fire Preplan for Circ Water Pump House, 133' Elevation 00 0 FWPH-01 Fire Preplan for Fire Water Pump House and Storage Tank, 133' Elevation

1 MC-QSP64-86058 Fire Calculation for Fire Loads

64 TB1-03 Fire Preplan for 133' Elevation of the Turbine Building

2 WTB-02 Fire Preplan for Water Treatment Building, 133' Elevation and Mezzanine

00 Procedures

Number Title Revision 05-S-02-V-1 Response to Fires Off

-Normal Event Procedure

005 Condition Reports (CR

-GGN-) 2017-05148 2017-05150 2017-09110 2017-10466 Section 1R06: Flood Protection Measures

Calculations

Number Title Revision M195.0-01 Compartment Flooding Calculations

2 M195.0-41 Auxiliary Building Compartment Flood Levels

0 Miscellaneous Documents

Title Date UFSAR Secti

on 3C.4.2 2016-00

A - 3 Section 1R11: Licensed Operator Requalification Program and Licensed Operator Performance

Procedures

Number Title Revision 02-S-01-27 Operations Philosophy

075 03-1-01-2 Power Operations

170 03-1-01-3 Plant Shutdown

130 06-OP-1P75-R-0003 Standby Diesel Generator 11: Functional Test

29 EN-OP-115 Conduct of Operations

2 EN-OP-200 Plant Transient Response Rules

004 GSMS-LOR-00247 Bypass Valve Inop / 6A Feedwater Heater Tube Leak / Loss of Feedwater Heating / LOCA / EP

-2A Loss of Level Indication

4 GSMS-LOR-00295 Reactor Pressure Control Malfunctions ONEP 0 00 Section 1R12: Maintenance Effectiveness

Drawings Number Title Revision 851E905 Wide Range Monitor (Mean Square Voltage)

E-1171-009 C51 Start-Up Range Neutron Mon [Monitoring] System IRM [Intermediate Range Monitor] Channel A&E

8 E-1171-015 C51 Start-Up Range Neutron Mon [Monitoring] System Remote Indicators, Channel A, B, E, F, Unit

1 E-1173-015 C71 Reactor Protection System Channel "A" Sensor Relays

21 J-1270-002 RCIC Isolation Logic

1 E-1137-005 Leak Detection System Valve Logic

007 E-1185-034 RCIC Logic System A and B

11 Miscellaneous Documents

Number Title Revision/Date

DCP 85/4060

Stiffening of Division I and II Standby

Diesel Engine

Intercooler Adapters

00 EC 75015 Neutron Monitoring System Trip Inputs to RPS 0 00

A - 4 Miscellaneous Documents

Number Title Revision/Date

ER-GG-2003-0126-000 Diesel Generator Turbocharger Intercooler Inlet Adapter Turning Vane Cracking

00 ER-GG-2004-0230-00-01-02 RCIC Leak Deterection Temperature Switch

July 18, 2007

Procedures

Number Title Revision EN-DC-203 Maintenance Rule

Program 004 EN-DC-204 Maintenance Rule Scope and Basis

004 EN-DC-205 Maintenance Rule Monitoring

006 EN-DC-206 Maintenance Rule (A)(1) Process

003 02-S-01-28 Standby Diesel Generator 11 Functional Test

005 06-OP-1E22-Q-0005 HPCS Quarterly Survillance Test

25 Condition Reports (CR

-GGN-) 2009-02089 2016-00387 2016-01067 2016-02254 2016-04820 2016-05551 2016-05604 2016-05623 2016-05639 2016-07443 2016-08633 2017-00186 2017-00938 2017-01194 2017-03371 2017-03576 2017-03585 2017-03648 2017-03667 2017-03785 2017-05660 2017-07448 2017-08534 2017-08782 2017-08843 2017-09116 2017-10118 2017-10524 2017-10527 2017-10566 2017-10567 2017-10568 2017-10571 2017-10573 2017-10575 2017-10576 2017-10583 2017-10590 2017-10612 2017-10659 2017-10670 2017-10711 2017-10779 2017-10788 2017-10799 2017-10826 2017-10844 2017-10869 2017-10903 2017-10929 2017-11513 2017-11526 2017-11582 2017-11717 2017-11733 2017-11753 2017-11755 2017-12227 2017-12305 2017-12308 2017-12314 2017-12322 2017-12328 2017-12383 Work Order

s 487852 50309925 52428355 52486724 52612980

A - 5 Work Order

s 52622650 52743253 52759062 52773919 Section 1R13: Maintenance Risk Assessments and Emergent Work Control

Miscellaneous Documents

Number Title Revision PC-Q1111-05001 Calculation of the Handwheel Shaft Torque for Motor Operated Valves 1B33F023A/B, 1B33F067A/B, and 1G33F106 00 1 Procedures

Number Title Revision 01-S-18-6 Risk Assessment of Maintenance Activities

19 03-1-01-5 Refueling, Attachment III

- Associated with Potential

for Draining Vessel

137 EN-OU-108 Shutdown Safety Management Program (SSMP)

8 Condition Reports (CR

-GGN-) 2017-11550 2017-11587 2017-11597 Work Order

s 00318755 Section 1R15: Operability Determinations and Functionality Assessments

Procedures

Number Title Revision EN-OP-104 Operability Determination Process

013 EN-OP-104 Operability Determination Process

014 EN-OP-111 Operational Decion

-Making Issue (ODMI) Process

014 EN-OP-111 Operational Decion

-Making Issue (ODMI) Process

015 EN-OP-112 Night and Standing Orders

2 EN-OP-115 Conduct of Operations

2 EN-OP-115 Conduct of Operations

23

A - 6 Condition Reports (CR

-GGN-) 2017-09935 Work Order

s 52657593 Section 1R19: Post

-Maintenance Testing

Drawings Number Title Revision 1090318 Pump 3196STi Size 1x1

-1/2-6 (Sheets 1 and 2)

2 Miscellaneous Documents

Number Title Date EC 74762 Evaluate Goulds Pump Replacement for HPCS Jockey Pump November 7, 2017 GEXI 2017-00008 Transmittal of HPCS Jockey Pump Impeller

O-Ring Recommendations

November 7, 2017 Procedures

Number Title Revision 06-OP-1E22-Q-0005 HPCS Quarterly Functional Test

25 06-OP-1P81-M-0002 HPCS Diesel Generator Functional Test

101 Section 1R20: Refueling and Other Outage Activities

Procedures

Number Title Revision EN-OU-108 Shutdown Safety Management Program (SSMP)

8 SOPP Grand Gulf Nuclear Station Shutdown Operations Protection Plan 021 Condition Reports (CR

-GGN-) 2017-09058 2017-09089 2017-11098 2017-11513 2017-11516 2017-11553 2017-11602 2017-11603

A - 7 Work Order

s 482352 Section 1EP6: Drill Evaluation

Miscellaneous Documents

Title Date Green Teram Drill Report

November 25, 2017 Section 4OA1: Performance Indicator Verification

Miscellaneous Documents

Number Title Date REP-10 Design Review Report, Entergy Grand Gulf Nuclear Station, Port Gibson, Mississippi

May 2013 010-0022D CompuLert CSC

-960 Encoder and Software Operation Manual August 9, 2004 EN-LI-114, Attachment 9.1

Reactor Coolant System Specific Activity

- NRC Performance Indicator Technique/Data Sheet

st Qtr 2017 EN-LI-114, Attachment 9.1

Reactor Coolant System Specific Activity

- NRC Performance Indicator Technique/Data Sheet

nd Qtr 2017 EN-LI-114, Attachment 9.1

Reactor Coolant System Specific Activity - NRC Performance Indicator Technique/Data Sheet

rd Qtr 2017 EN-LI-114, Attachment 9.1

Reactor Coolant System Specific Activity

- NRC Performance Indicator Technique/Data Sheet

th Qtr 2016 EN-LI-114, Attachment 9.1

Reactor Coolant System Leakage

- NRC Performance Indicator Technique/Data Sheet

st Qtr 2017 EN-LI-114, Attachment 9.1

Reactor Coolant System Leakage

- NRC Performance Indicator Technique/Data Sheet

nd Qtr 2017 EN-LI-114, Attachment 9.1

Reactor Coolant System Leakage

- NRC Performance Indicator Technique/Data Sheet

rd Qtr 2017 EN-LI-114, Attachment 9.1

Reactor Coolant System Leakage

- NRC Performance Indicator Technique/Data Sheet

th Qtr 2016 Procedures

Number Title Revision 01-S-10-3 Emergency Planning Department Responsibilities

23 EN-LI-114 Regulatory Performance Indicator Process

7

A - 8 Procedures

Number Title Revision E N-OP-109 Drywell Leakage

2 Condition Reports (CR

-GGN-) 2017-04177 2017-11531 2017-11827 2017-11843 Section 4OA2: Problem Identification and Resolution

Miscellaneous Documents Title Date Critical Decision Document

- Residual Heat Removal Pump

September 29, 2017 Procedures

Number Title Revision 06-OP-1E12-Q-0023 LPCI/RHR Subsystem A Quarterly Functional Test

135 EN-LI-102 Corrective Action Program

30 EN-LI-118 Cause Evaluation Process

24 Condition Reports (CR

-GGN-) 2009-01729 2012-08225 2016-06798 2017-00569 2017-02676 2017-09061 2017-09241 2017-09322 2017-10234 2017-10271 2017-12446 Work Order

s 483308-01 50287431 52716255-01 52754845 52784351-01 Section 4OA3: Follow

-up of Events and Notices of Enforcement Discretion

Work Order

s 491184

A - 9 Section 4OA5: Other Activities

Miscellaneouse Documents

Number Title Revision/Date 10 CFR 72.212 Report HI-STORM 100 System

10 , 0 11 BOP-MT-17-007 Magnetic Particle Examination

May 13 , 2017 BOP-MT-17-009 Magnetic Particle Examination

May 13, 2017 BOP-MT-17-021 Magnetic Particle Examination

June 15 , 2017 BOP-PT-17-004 Liquid Penetrant Examination

May 9 , 2017 BOP-PT-17-009 Liquid Penetrant Examination

June 15 , 2017 CC-N1111-04011 GGNS ISFSI Soil Structure Interaction Analysis

1 CCR-1021-535 Component Completion Record

- MPC-68M July 14 , 2017 CCR-1021-536 Component Completion Record

- MPC-68M July 14, 2017

CCR-1021-537 Component Completion Record

- MPC-68M July 14, 2017

CCR-1021-538 Component Completion Record

- MPC-68M July 14, 2017

CCR-1021-539 Component Completion Record

- MPC-68M July 14, 2017

CCR-1021-540 Component Completion Record

- MPC-68M July 14, 2017

CCR-1024-991 Component Completion Record

- HI-STORM 100S

August 11 , 2017 CCR-1024-992 Component Completion Record

- HI-STORM 100S

August 11, 2017 CCR-1024-993 Component Completion Record

- HI-STORM 100S

August 11, 2017 CCR-1024-994 Component Completion Record

- HI-STORM 100S

August 11, 2017 CCR-1024-995 Component Completion Record

- HI-STORM 100S

August 11, 2017 CCR-1024-996 Component Completion Record

- HI-STORM 100S

August 11, 2017 NUPIC Audit

235 Holtec Manufacturing Division

January 9, 2017 PAD2015-20-S-01-002 Process Applicability Determination Form

August 20, 2015

A - 10 Miscellaneouse Documents

Number Title Revision/Date PAD2015-20-S-01-003 Process Applicability Determination Form

October 13, 2015 PAD2015-20-S-01-140 Process Applicability Determination Form

August 20, 2015 PAD2015-20-S-03-201 Process Applicability Determination Form

October 14, 2015 PAD2016-20-S-02-001 Process Applicability Determination Form

June 1, 2016 PAD2017-20-S-01-020 Process Applicability Determination Form

May 31, 2017 QA-20-2016-GGNS-1 QUALITY ASSURANCE AUDIT REPORT September 15, 2016 QS-2017-GGNS-001 Quality Assurance Surveillance Report

January 3, 2017 QS-2017-GGNS-002 Quality Assurance Surveillance Report

January 3, 2017 QS-201 7-GGNS-012 Quality Assurance Surveillance Report

May 31, 2017 QS-201 7-GGNS-013 Quality Assurance Surveillance Report

May 31, 2017

WT-WTHQN-2015-00085 Entergy Source Activity Report

May 31, 2017

WT-WTHQN-2015-00275 Entergy Source Activity Report

April 12, 2015 WT-WTHQN-2015-00277 Entergy Source Activity Report

April 12, 2015 WT-WTHQN-2015-00605 Entergy Source Activity Report

August 28, 2015 WT-WTH QN-2015-00646 Entergy Source Activity Report

August 28, 2015 WT-WTHQN-2015-00678 Entergy Source Activity Report

October 14, 2015 WT-WTHQN-2016-00201 Entergy Source Activity Report

April 7, 2016 WT-WTHQN-2016-00774 Entergy Source Activity Report

November 18, 2016

A - 11 Miscellaneouse Documents

Number Title Revision/Date WT-WTHQN-2016-00775 Entergy Source Activity Report

November 20, 2016 WT-WTHQN-2016-00776 Entergy Source Activity Report

February 20, 2017 WT-WTHQN-2016-00777 Programmatic Surveillance Report

January 17, 2017 Procedures

Number Title Revision 01-S-06-50 Control of Fuel Services Operations

9 04-1-01-F1103 Fuel Handling Platform

52 06-OP-1000-D-0001 Daily Operating Logs Data Sheet (multiple)

146 20-S-01-002 DFS Cask Loading

8 20-S-01-003 DFS HI-STORM/HI-TRAC Transport

9 20-S-03-201 PCI/Westinghouse Dry Fuel Cask Welding and NDE Procedures

2 EN-DC-215 Fuel Selection for Holtec Dry Cask Storage (multiple)

6 , 00 8 EN-FAP-OU-108 Fuel Handling Process

5 EN-LI-102 Corrective Ac

tion Program

29 EN-LI-112 10 CFR 72.48 Evaluations

12 Condition Reports (CR

-GGN-) 2016-03672 2016-03674 2016-03734 2016-06448 2016-06560 2016-06579 2016-06593 2016-06596 2016-06597 2016-06601 2016-06699 2016-06991 2017-00264 2017-02507 2017-06085 2017-06263 2017-07473 Work Order