Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML03111019015 April 2003Unsigned Memo from W. Beckner to J. Holonich Regarding INES Level Point Beach Event
ML03111057118 April 2003Memo 04/18/03 Prairie Island Re DRS Input to DRP IR 03-04 MWM2
ML03112051325 April 2003Draft RAI and Phone Call Summary Regarding Two New Emergency Action Levels
ML0312701027 May 2003Report on the Status of Open TIAs Assigned to NRRBackfit
ML03140064919 May 2003NRR Peer Review of Preliminary ASP Analysis of November 2001 Operational Condition at Point Beach, Units 1 & 2Safe Shutdown Earthquake
Design basis earthquake
Earthquake
Fire Watch
ML03147068827 May 2003Memorandum, Phone Call Held on May 22, 2003, Regarding Measurement Uncertainty Recapture Power Uprate
ML0314800726 June 2003Memorandum, Facsimile Transmission Issues Discussed in Phone Conversation
ML0314801556 June 2003Memorandum, Facsimile Transmission Issues Discussed in Phone Conversation. TAC Nos MB7926 and MB7927
ML03156045317 June 2003Safety Evaluation Regarding Unit Staff Qualification Requirements for Prairie Island Nuclear Generating Plant
ML03177007626 June 2003Report on the Status of Open TIAs Assigned to NRRBackfit
ML0320404124 September 2003Response to TIA 2001-10, Design Basis Assumptions for Ability of Emergency Diesel Generators to Meet Single Failure Criteria for External EventsEarthquake
ML03209006321 July 2003Schedule and Inspection Plan for 95003 Supplemental Inspection at Point Beach
ML03209021516 September 2003Advisory Committee on Reactor Safety Review of Stretch Power Uprate Amendment
ML0321701531 August 2003Transmittal of Final ASP AnalysesSafe Shutdown
Fire Barrier
Significance Determination Process
ML03219000615 August 2003Transmittal of Draft Request for Additional Information on Proposed Amendment to Change Pressure-Temperature Limit Curves
ML03224007215 August 2003Facsimile Transmission for Issues Discussed in Telephone ConferenceShutdown Margin
ML03226072821 August 2003Facsimile Transmission for Issues Discussed in Telephone Conference
ML03227019726 August 2003Transmittal of Electronic Mail on Proprietary Withholding Request Regarding Pressure-Temperature Limit Curves
ML03238063628 August 2003Safety Evaluation Regarding Unit Staff Qualification Requirements for Kewaunee Nuclear Power Plant; Palisades Nuclear Plant; Point Beach Nuclear Plant, Units 1 and 2
ML03239040227 August 2003Results of the Monticello Nuclear Generating Plant Phase 2 Notebook Benchmarking VisitInternal Flooding
Significance Determination Process
ML03241027828 August 2003Results of Kewaunee SDP Phase 2 Notebook Benchmarking VisitBoric Acid
Internal Flooding
Probabilistic Risk Assessment
Significance Determination Process
ML03317041813 November 2003Public Meeting, Palisades Discuss Current Palisades Plant Performance
ML03317041913 November 2003(9:00 A.M. CST) Regulatory Conference, Palisades Preliminary Safety Significance of a 3/25/03, Loss of Offsite Power Event Which Occurre When a Signpost Was Driven Into a Conduit and Damaged a Cable in the Plant Parking Lot
ML0333902465 December 2003Notice of Meeting with Nuclear Management Company, LLC, Re Pressurized Thermal Shock Plans for Extended Plant Life at Palisades Plant
ML04005023516 January 2004Facsimile Transmission for Issues Discussed in Telephone Conference
ML04005036816 January 2004Facsimile Transmission for Issues Discussed in Telephone Conference
ML0406201439 October 2003Advisory Committee on Reactor Safety Review of Stretch Power Uprate Amendment
ML04070044018 April 2004Technical Specification 3.4b, Auxiliary Feedwater System, Interpretation
ML04070045716 March 2004Facsimile Transmission for Issues Discussed in Telephone Conference
ML04070048516 March 2004Facsimile Transmission for Issues Discussed in Telephone Conference
ML04091004930 March 2004Monthly Region Report - Region III - March 2004
ML04118029926 April 2004Notice of Public Meeting, Monticello, to Present Licensee Results of NRC End-of-Cycle Assessment
ML04174008621 June 2004All Region III Facility Training Managers Revised NRC Form 398 - Personal Qualification Statement Licensee
ML04188032429 June 2004Audit and Review Plan for Plant Aging Management Reviews and Programs at Point Beach Nuclear Power Plant, Units 1 and 2Aging Management
ML0419604627 July 2004Wpdes Permit ReissuanceGrab sample
Zebra Mussel
Incorporated by reference
ML04204043022 July 2004Notice of Meeting Between the U.S. Nuclear Regulatory Commission (NRC) Staff and Nuclear Management Company, LLC (NMC) on Recent Decisions Involving Unit 2 Reactor Vessel Pressurized Thermal Shock
ML04210033230 June 2004Close-out of Tacs Relating to the Review of 35-day Letters Submitted in Response to the April 29, 2003, Orders Revising the Design Basis and Security Guard Force Training Enhancements and Physical Fitness Requirements
ML0421500685 August 2004Notice of Meeting with Nuclear Management Company, LLC (NMC) Regarding Applying Alternative Source Term Methodology at Monticello
ML04322058219 November 2004Forthcoming Meeting with Nuclear Management Company, LLC (NMC) Regarding the Independent Spend Fuel Storage Installation (ISFSI) at Monticello
ML04327058716 November 2004Summary of Telephone Conference Held on October 26, 2004, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Point Beach Nuclear Plant,Aging Management
ML04327065217 November 2004Summary of Telephone Conference Heldon November 17, 2004, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, Llc. Concerning Draft Requests for Additional Information Pertaining to the Point Beach Nuclear Plan, U
ML04351033616 December 2004Use of the University of Maryland'S Letter Report, Thermal-hydraulic Uncertainty Analysis in Pressurized Thermal Shock Risk Assessment, as a Reference in Our NUREG/CR-6859, PRA Procedures and Uncertainty for PTS Analysis
ML05027004619 January 2005Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Point Beach NuclearNon-Destructive Examination
Aging Management
License Renewal
Control of Heavy Loads
ML05075054518 March 20053/18/05, Kewaunee, Summary of Telephone Conference Steam Generator Water Chemistry Excursion (TAC No. M40695)
ML0508303296 May 2004Memo A. Lund, NRR, to L. Raghavan, NRR, Request for Additional Information Re Point Beach Unit 2 Steam Generator Eddy Current Examinations for 2003 Outage
ML0508304222 June 2004Memo T.Chan, NRR, to L. Raghavan, NRR, Safety Evaluation for Point Beach Unit 1 First Revised OrderNondestructive Examination
Finite Element Analysis
ML05087014826 May 2004NRC Verbal Authorization of Relief Requests Pertaining to the Unit 1 Reactor Vessel Head
ML05088016414 April 2004Memorandum from K. Lambert, Riii, to K. Riemer, Riii, Subj: Review of Licensee Identified Wrongdoing Issues Allegation No. RIII-04-A-0047 (Point Beach)
ML05088016630 April 2004Memo from K. Lambert, Riii, to K. Riemer, Riii, Subj: Receipt of New Allegation: RIII-2004-A-0047 (Point Beach). Attachment Allegation Action Plan AMS No. RIII-2004-A-0047High Radiation Area
ML05088016730 April 2004Memorandum from K. Riemer, Riii, to J. Heller, Riii, Subj: Review of Licensee Identified Wrongdoing Issues Allegation No. RIII-04-A-0047 (Point Beach) (Aits No. S04-01701)High Radiation Area