ML040050368

From kanterella
Jump to navigation Jump to search

Facsimile Transmission for Issues Discussed in Telephone Conference
ML040050368
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/16/2004
From: Spaulding D
NRC/NRR/DLPM/LPD3
To:
NRC/NRR/DLPM/LPD3
References
TAC MC0873, TAC MC0874
Download: ML040050368 (3)


Text

January 16, 2004 MEMORANDUM TO: File FROM: Deirdre W. Spaulding, Project Manager, Section 1 /RA/

Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - FACSIMILE TRANSMISSION FOR ISSUES DISCUSSED IN TELEPHONE CONFERENCE (TAC NOS. MC0873 AND MC0874)

The attachment was transmitted by fax to Mr. Jack Gadzala, the Nuclear Management Company, LLC, in preparation for a telephone conference. This memorandum and the attachment do not convey a formal request for information or represent an Nuclear Regulatory Commission staff position.

Docket Nos. 50-266 and 50-301

Attachment:

Discussion Points

ML040050368 Point Beach Nuclear Plant, Units 1 and 2 Submittal Dated September 26, 2003 TAC MC0873 and MC0874 Discussion Points Point Beach would like to adopt TSTF 419 R0. TSTF 419 R0 has an insert which states:

"Identify the Topical Reports by number and title or identify the NRC Safety Evaluation for a plant specific methodology by NRC letter and date. The PTLR will contain the complete identification for each of the TS referenced Topical Reports used to prepare the PTLR (i.e.,

report number, title, revision, date, and any supplements."

Point Beach is proposing just to add the NRC letters and the corresponding dates. The staff believes that the last sentence of TSTF 419 R0 should also be added to TS 5.6.5.

Also, it appears from letter dated 10/6/2000 that the actual methodology was approved by letter dated March 20, 1996. However, this letter is not listed in TS 5.6.5. Please explain.

ATTACHMENT