Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20125A53026 September 1975Discusses Review of GE Technical Justification of Hydrodynamic Loads for Mark I Containments.No Sufficient Info to Indicate That Functional Operability of Piping Required for Emergency Core Cooling Will Not Be Impaired
ML20125A53326 February 1973Forwards Util Transmitting Amend 3 to OL for Plant.W/O Encl
ML20125A53626 February 1973Forwards Util Requesting Authorization for Operation of Plant W/Reload Fuel in Core.W/O Encl
ML20125A54326 February 1973Forwards Util ,Transmitting Amend 2 to License DPR-22 to Increase Quantity of U-235 Contained in Fission Chambers from 1 G to 50 G for Plant.W/O Encl
ML20125A5462 March 1973Discusses Proposed Changes That Do Not Present Significant Hazards Considerations Not Described or Implicit in Monticello Safety Analysis Rept
ML20125A5496 October 1975Discusses Preliminary Notification of Event or Unusual Occurrence Re Feedwater Spargers
ML20125A55121 February 1973Forwards Util Transmitting Rept Evaluating Application for Full Term OL for Plant.W/O Encl
ML20125A5588 February 1973Forwards Util Reporting PCIV Leakage Greater than TS Limit.W/O Encl
ML20125A5638 February 1973Forwards Util ,Furnishing Info Re Rod Drop Accident Analysis.W/O Encl
ML20125A56614 November 1969Discusses Second Review of Instrumentation Schematics for Monticello Nuclear Generating Plant
ML20125A57322 May 1970Informs That Licensee Will Replace All Sensitized Stainless Steel safe-ends Except for Recirculation Outlet Nozzles
ML20125A57620 February 1973Concludes That Proposed Amend Does Not Involve Significant Hazard Considerations Not Previously Evaluated & That There Is Reasonable Assurance That Health & Safety of Public Will Not Be Endangered by Proposed ActivitiesShutdown Margin
ML20125A5817 May 1970Forwards Request Made During Proceedings Before ASLB Re Application for License to Begin Operation at Plant
ML20125A58618 May 1970Forwards Draft Copy of Problems Discussed in Insp Rept 50-263/70-04 & Status of Resolutions.W/O Encls
ML20125A59611 May 1971Requests Review of Util 710401 Application for Amend to License Re Gaseous Radwaste Sys Mods
ML20125A5997 May 1970Informs That Program for Replacement or Mod of Furnace Sensitized Stainless Steel Safe Ends at Facility Has Been Started
ML20125A6024 February 1971Advises That Following Issuance of Operating License,Addl Matters & Changes to Monticello License Would Be Handled by BWR Reactor Project Group
ML20125A60729 August 1973Forwards Order of Mod of License W/App I & SE of Fuel Densification Effects on Facility
ML20125A61017 July 1970Confirms Telcon Re Monticello Safe Ends & Possible Relationship Between Safe End & Thermal Sleeve Incident at Indian Point
ML20125A61428 August 1973Forwards Order for Mod of License DPR-22,w/encl App I,Issued by Commission on 730824.W/o Encl
ML20125A6164 January 1973Advises That Evaluation & Finding Re Financial Qualifications Necessary Re Ftol
ML20125A61729 August 1973Forwards Order for Mod of License DPR-22,w/App I & SE of Fuel Densification Effects on Facility
ML20125B23012 March 1973Forwards Util Transmitting 6-month Operating Rept 4 for Jul-Dec 1972.W/o Encl
ML20125B25726 May 1970Forwards Draft Ltr Re Insp Repts That Have Been Prepared in Connection W/Construction of Plant
ML20125B2605 July 1974Forwards Notices of Request for Extension in Submitting Evaluations (ECCS Criteria) for Listed Plants.W/O Encls
ML20125B27618 December 1972Forwards Response to Technical Assistance Request Re 721120 Application for Amend to License
ML20125B2788 July 1976Forwards Requests for Addl Info Awaiting Response to Round 2 Questions Re Proposed Interim Offsite Fuel Shipment Program
ML20125B28127 December 1972Forwards Financial Info Requested in Connection W/Issuance of full-term Ol.W/O Encl
ML20125B28613 February 1970Forwards Jp Badalich Citing Pending Litigation Between Util & Minnesota Pollution Control Agency as Basis for AEC Deferring Action Affecting Plant.Regulatory Info Meeting Scheduled for 700216
ML20125B2921 June 1976Informs That NRC Has Reviewed Two Listed Items & Agreed That TS 6.7.A.2.h(2) non-specific & Nonenforceable as Written
ML20125B2984 December 1972Requests Listed Addl Info Re Monticello Nuclear Generating Plant,Including Financial Info,In Support of License Extension
ML20125B30319 May 1971Discusses Util Request to Modify off-gas Sys by Adding Recombiner,Compressors & Pressurized Holdup Tanks to Provide Min of 50 Hours.Aec Cannot Conclude That Releases from Plant AlapEarthquake
ML20125B30724 August 1970Informs That Listed man-days Have Been Expended in Monticello Hearing & Hearings Scheduled for Operating Licenses by End of Year
ML20125B3104 December 1972Requests Review of Financial Qualifications of Util for Issuance of full-term OL
ML20125B31513 April 1967Discusses ACRS 82nd Meeting on 670208-11 & 84th Meeting on 670406-08 Re Review of NSP Proposal to Construct Monticello Nuclear Generating Plant,Unit 1 on Site Near Monticello,Mn
ML20125B31925 May 1976Forwards Pertaining to Insp Rept 50-263/76-05 & Request That Licensee Provide Info Re Meteorological Data Per TS 6.7.A.2.h(2)
ML20125B32317 April 1967Forwards Public Announcement of Scheduling of Public Hearing on 670525 at Buffalo,Mn,To Consider NSP Application for Permit to Construct Nuclear Power Plant Near Monticello
ML20125B3258 September 1970Informs That Items Contained in Memo to Boyd Have Been Completed Satisfactorily & Details Will Be Forwarded
ML20125B32718 April 1967Informs of Intent to Have Notice of Hearing on NSP Application for Provisional Construction Permit for Monticello Nuclear Generating Plant,Published in Fr No Later than 670425
ML20125B33117 July 1970Discusses Telcon W/J Hamill,Press Secretary to Representative J Karth Re Monticello Safe Ends & Possible Relationship Between These & Thermal Sleeve Incident at Indian Point
ML20125B3388 July 1970Discusses Telcon W/Cbs News Re Info on Nature & Extent of Emergency Plans for Fermi 1,Indian Point 1 & Monticello
ML20125B34425 October 1972Forwards Proposed Full Term Operating License for Monticello Unit 1,for Review & Comments
ML20125B34628 April 1976Forwards Minor Inconsistencies Noted in Proposed Program Content Re Review of Licensees Changes to Radiological Environ Monitoring Program
ML20125B35612 January 1973Lists Requests for Addl Info from Intervenors in Monticello Operating License Application.Pertinent Info Requested
ML20125B36522 August 1972Forwards Submittal & Subsequent Reply to Questions,Per
ML20125B36913 February 1973Forwards Copy of Safety Evaluation for full-term License Review for NSP Monticello Nuclear Generating Plant Unit 1. W/O Encl
ML20125B37925 November 1969Discusses Telcon Re Meeting Between Util,Mn Water Control Agency & Dr Tsivoglou
ML20125B38218 August 1972Requests Display Advertising for Notice of Consideration of Issuance of full-term Operating License for Monticello Nuclear Generating Plant,Unit 1
ML20125B3832 February 1973Responds to Technical Assistance Request for Review of 721120 Application for Amend to License DPR-22
ML20125B38826 April 1970Forwards Chronology of Request for Div of Compliance Insp Repts,List of Immediate Problems Associated W/Public Disclosure of Compliance Insp Repts & List of Effects Such Precedent Would Have on Future Operations of Program