ML20125B382

From kanterella
Jump to navigation Jump to search
Requests Display Advertising for Notice of Consideration of Issuance of full-term Operating License for Monticello Nuclear Generating Plant,Unit 1
ML20125B382
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/18/1972
From: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
To: Miller R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 9212090337
Download: ML20125B382 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _

P3

  1. fM!t, UNITED STATES

/ ".

< 4.y <

ATOMIC ENERGY COMMISSION W AtHINGTON. D.C. 20 Set

[k TJihd' AUG 1 R 1972 Docket No. 50-263 R. A. Miller, Office of Administration, Regulation DISPLAY ALVEFff1SIJD FM IK/IICE OF CONSIDERATION OF ISSUANCE OF WLL-TEFM OPERATING LICE'ISE FOR THE FD."TICELU) NUCLEAR GENERATwo PLA'!T, UNIT 1 Plence mquest dicplay advertising of the encloced notice in connection with the Northern States Power Comisny's application for a full-term.

operating licence for the subject facility. Tre notice should be for- .,

warded to the following four newspapers with a requent for publication on or before August 25, 1972, inasmuch as a similar notice has been foraarded to the Office of the Federal Register for publication by not later than August 25, 1972:

Minneapolis Star and rdaneapolis Tribune Mineapolis Star and Tribune Company 5th and Portland Avenues Minneapolis, Fdnnesota 55415

. St. Paul Pmss and St. Paul Dispatch Northwest Publication, Inc.

55 East 4th Stmet St. Paul, Minnesota 55101 .

/

/l ;'q ///h' o h-Icnald J/Shovholt Accistant Director for Operating Reactoro Directorate of Licensing

- Fnclosum:

Notice for Display Ad (6 cys) cc: J. Gallo, 000 C. Flles, OIS D. Skovholt, L:0R R. Wade, L:EP F. Yaras 9212090337.720018 yDR ADOCK 05000263 PDR

i

. 3,  !

t liCf!' ICE OF OPPOIGWITY FOR IUBLIC PMif1CIPATIO:1 E AEC LICic!3I?JG PROCEEDI: JUS FOR IO:ITICEIIO IJUCLEAR P1/diT IEL 'IEd LICiCCE i

Tre U. S. Atcele Ener(y Conrlssion (AEC) is giving public notice that it '

ic considering converting the provisional operating license (DPH-22) held .

by the 11orthern States Power Cognny ( EP) of ..inneapolis, !ilrmsota, for -  !

operation of Unit 1 of the Ponticello I!uclear Generating Plant located in  !

Sherbume and Wricht Counties, Minnesota, to a full-tem operating license.  !

Conversion of the provisicnal license to a full-tem license would author-  !

ice !JSP to continue to operate the nuclear facility at its presently 11-: 1  !

censed operating power level of 1670 regawatta (the:ml) for a period of M years from June 19,1967-the date the AEC issued Construction Permit '

I;o. CPPR-31 authorizing the facility's constraction. ,

Tne notice provides that within thirty (30) days after its publication in i the EDERAL REGISTER on Auguct 2f,i,1972, any ratter of the public whose ,

interest ray be affected by this proceeding ray file a petition for leave to intervene (1) with respect to whether the provisional operating license '

should be continued, modified, teminated or appropriately ' conditioned to protect envimrcental values, and (2) with respect to whether the full-- -

tem operating license should be issued. '!

Tetitions for leave to intervene should be submitted to the Office of the >

Secmtary of the U. S. Atoado Energy Comission, Washington, D. C. 20545, Attention: Cnier, Public Proceedings Branch by Septerber 25, 1972. If tirely petitions are received, the Conrlssion will issue a notice of hearing o'r an appropriate order. Petitions that am not tdrnly filed will be dis-.

missed unless the petitioner shows good cause for failum to file it on tire.

A petition should state the persan's interest, how it ray.be affected by .

the proposed licensing action, and his specific cententions in :sasonably specific detail.-- Fetitions stating contentions relating only- to matters

  • outside the AEC's jurisdiction will be denied. A person.pemitted to.

i

$ntervene becomes a pa"ty to the proceeding and has a right to participate fully in- the conduct of the hearing. - For exa:mle, he ray present evidence and exardne and cross-examine witnesses.

The Comission has arranced for copies of docu ents and correspondence relating to this facility to be kept on file for public inspection at the Envirorcental Resource Center, Minneapolis Public Library,1222 S.E. 4th - ,

Street, Minneapolis, Minnesota, i

1 l-L lt  ;

, . .. .. - - - . - - . - ._ . . - . - - - _ -