05000304/LER-1986-005, Forwards Errata to LER 86-005-00,correcting Rept Number to LER 86-010-00 | 22 April 1986 | Forwards Errata to LER 86-005-00,correcting Rept Number to LER 86-010-00 | |
05000304/LER-1988-009, Corrects Typo in Transmittal Ltr for LER 88-009-00.Correct Docket Is 50-304 Not 50-204 | 23 November 1988 | Corrects Typo in Transmittal Ltr for LER 88-009-00.Correct Docket Is 50-304 Not 50-204 | |
05000304/LER-1996-004, Forwards LER 96-004-01 Re Results of Investigation Into Failure of Unit Containment Inner Air Lock Door.Addl Corrective Action Listed in Attachment a | 5 September 1997 | Forwards LER 96-004-01 Re Results of Investigation Into Failure of Unit Containment Inner Air Lock Door.Addl Corrective Action Listed in Attachment a | |
05000304/LER-1997-001, Forwards LER 97-001-00 Per 10CFR50.73(a)(2)(iv) Which Requires Written Rept Using NRC Form 366, License Event Rept, within 90 Days of Discovery of Event.Attachment a Contains Commitments Associated W/Ltr | 1 October 1997 | Forwards LER 97-001-00 Per 10CFR50.73(a)(2)(iv) Which Requires Written Rept Using NRC Form 366, License Event Rept, within 90 Days of Discovery of Event.Attachment a Contains Commitments Associated W/Ltr | |
05000304/LER-1997-002, Forwards LER 97-002-00,per 10CFR50.73(a)(2)(v)(B),which Requires 30 Day Written Rept.Commitments Associated W/Correspondence,Encl | 11 November 1997 | Forwards LER 97-002-00,per 10CFR50.73(a)(2)(v)(B),which Requires 30 Day Written Rept.Commitments Associated W/Correspondence,Encl | |
05000304/LER-1997-003, Forwards LER 97-003-00 Re Unit 2 RHR Sys Declared Inoperable,Per 10CFR50.73(a)(2)(v)(B) | 13 November 1997 | Forwards LER 97-003-00 Re Unit 2 RHR Sys Declared Inoperable,Per 10CFR50.73(a)(2)(v)(B) | |
05000304/LER-1997-004, Forwards LER 97-004-00,per 10CFR50.73(a)(2)(i).Commitments Associated W/Correspondence,Encl | 14 November 1997 | Forwards LER 97-004-00,per 10CFR50.73(a)(2)(i).Commitments Associated W/Correspondence,Encl | Unanalyzed Condition |
05000304/LER-1997-005, Forwards LER 97-005-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 2.Commitment Made within Ltr,Encl | 21 November 1997 | Forwards LER 97-005-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 2.Commitment Made within Ltr,Encl | |
05000304/LER-1997-006, Forwards LER 97-006-00 Per 10CFR50.73(a)92)(ii)(B) Which Requires 30 Day Written Rept When Any Event or Condition Occurs That Resulted in Condition of Nuclear Power Plant. Regulatory Commitments Encl | 24 November 1997 | Forwards LER 97-006-00 Per 10CFR50.73(a)92)(ii)(B) Which Requires 30 Day Written Rept When Any Event or Condition Occurs That Resulted in Condition of Nuclear Power Plant. Regulatory Commitments Encl | |
05000304/LER-1997-007, Forwards LER 97-007-00 Per 10CFR50.73(a)(2)(v)(B) Which Requires Written Rept for Any Event or Condition That Could Prevent Fulfillment of Safety Function of Structures or Sys Needed to Remove Residual Heat.W/Commitments Attach | 1 December 1997 | Forwards LER 97-007-00 Per 10CFR50.73(a)(2)(v)(B) Which Requires Written Rept for Any Event or Condition That Could Prevent Fulfillment of Safety Function of Structures or Sys Needed to Remove Residual Heat.W/Commitments Attached | |
05000304/LER-1997-008, Forwards LER 97-008-00 Per 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Written Rept.Attachment a Provides Commitments Associated W/Correspondence | 22 December 1997 | Forwards LER 97-008-00 Per 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Written Rept.Attachment a Provides Commitments Associated W/Correspondence | |
05000304/LER-1997-009, Forwards LER 97-009-00,re Event Which Occurred at Zion Nuclear Power Station,Unit 2.Commitments Made within Ltr Also Encl | 22 December 1997 | Forwards LER 97-009-00,re Event Which Occurred at Zion Nuclear Power Station,Unit 2.Commitments Made within Ltr Also Encl | |
05000304/LER-1998-001, Forwards LER 98-001-00,per 10CFR50.73(a)(2)(iv) Which Requires 30 Written Rept Following Event That Resulted in Manual or Automatic Actuation of Any Esf,Including Rps. Commitments Also Encl | 25 March 1998 | Forwards LER 98-001-00,per 10CFR50.73(a)(2)(iv) Which Requires 30 Written Rept Following Event That Resulted in Manual or Automatic Actuation of Any Esf,Including Rps. Commitments Also Encl | |
05000304/LER-1998-002, Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Encl | 8 May 1998 | Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Encl | |
A97001, Responds to NRC Re Violations Noted in Insp Repts 50-295/96-14,50-304/96-14,50-295/96-17 & 50-304/96-17. Corrective Actions:Equipment Attendant Removed from Assigned Duties | 6 March 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-295/96-14,50-304/96-14,50-295/96-17 & 50-304/96-17. Corrective Actions:Equipment Attendant Removed from Assigned Duties | Stroke time Condition Adverse to Quality Missed surveillance Scaffolding Grace period |
A97002, Responds to NRC Re Violations Noted in Insp Repts 50-295/96-11 & 50-304/96-11.Corrective Actions:Clarifed Mgt Expectations to Workforce,Revised Procedures & Conducted Enhanced Safety Evaluation Training.Payment Encl.W/O Encl | 11 April 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-295/96-11 & 50-304/96-11.Corrective Actions:Clarifed Mgt Expectations to Workforce,Revised Procedures & Conducted Enhanced Safety Evaluation Training.Payment Encl.W/O Encl | Condition Adverse to Quality Maintenance Rule Program Scaffolding |
A97003, Responds to NRC Re Violations Noted in Insp Repts 50-295/96-20 & 50-304/96-20.Corrective Actions:Training Dept Will Include Discussion of Event in Licensed & non-licensed Operator Training Programs | 30 April 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-295/96-20 & 50-304/96-20.Corrective Actions:Training Dept Will Include Discussion of Event in Licensed & non-licensed Operator Training Programs | Condition Adverse to Quality |
A97004, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-08 & 50-304/97-08.Corrective Actions:Will Develop Standard Method of Verification for Audits Prior to Next Performance of Each Audit | 29 May 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-295/97-08 & 50-304/97-08.Corrective Actions:Will Develop Standard Method of Verification for Audits Prior to Next Performance of Each Audit | |
A97005, Forwards Response to Violations Noted in Insp Repts 50-295/97-09 & 50-304/97-09.Corrective Actions:Unsecured Hoses & Cords of Concern Secured According to Station Procedures | 5 June 1997 | Forwards Response to Violations Noted in Insp Repts 50-295/97-09 & 50-304/97-09.Corrective Actions:Unsecured Hoses & Cords of Concern Secured According to Station Procedures | |
A97006, Provides Copy of Addendum to Renewal of NPDES Permit IL0002763 | 27 May 1997 | Provides Copy of Addendum to Renewal of NPDES Permit IL0002763 | Boric Acid Coatings |
A97010, Requests Authorization for Alternative to One Time Augmented Insp of RPV Shell Welds Set Forth in 10CFR50.55a(g)(6)(ii) (A)(2) Per 10CFR50.55a(g)(6)(ii)(A)(5).Authorization to Use Partial Insp Coverage Requested | 13 August 1997 | Requests Authorization for Alternative to One Time Augmented Insp of RPV Shell Welds Set Forth in 10CFR50.55a(g)(6)(ii) (A)(2) Per 10CFR50.55a(g)(6)(ii)(A)(5).Authorization to Use Partial Insp Coverage Requested | VT-2 |
A97012, Requests Authorization to Use Alternative to Repair & Replacement Requirements Specified in 10CFR50.55a(g)(4)(v) for Class Mc & CC Pressure Retaining Components & Integral Attachments | 3 September 1997 | Requests Authorization to Use Alternative to Repair & Replacement Requirements Specified in 10CFR50.55a(g)(4)(v) for Class Mc & CC Pressure Retaining Components & Integral Attachments | Coatings |
A97013, Transmits Request for Authorization to Use Alternative Requirements of Article IWA-5242(a) for Insp of Rv Flanges During Current Unit 1 & 2 Outages Z1R15 & Z2R14 | 13 August 1997 | Transmits Request for Authorization to Use Alternative Requirements of Article IWA-5242(a) for Insp of Rv Flanges During Current Unit 1 & 2 Outages Z1R15 & Z2R14 | Boric Acid VT-2 |
A97014, Responds to RAI Re Third Interval ISI Relief Request CR-13 & New Relief Request CR-23 | 13 August 1997 | Responds to RAI Re Third Interval ISI Relief Request CR-13 & New Relief Request CR-23 | Boric Acid VT-2 Scaffolding |
A97016, Provides Response to 970107 RAI Concerning Containment Coatings at Plant | 5 September 1997 | Provides Response to 970107 RAI Concerning Containment Coatings at Plant | Coatings Foreign Material Exclusion Scaffolding |
A97018, Provides Current Status of Outstanding NUREG-0737,Item II.D.1 Issues.Calculations Associated W/Unit 2 Porvs,Encl | 29 August 1997 | Provides Current Status of Outstanding NUREG-0737,Item II.D.1 Issues.Calculations Associated W/Unit 2 Porvs,Encl | |
A97019, Updates Record Copy of Current TS Markup,Accompanying Discussion of Differences,Nureg Mark Ups & No Significant Hazards Evaluation Changes to Reflect Recent Review & Comments by Both Util & NRC Personnel | 6 June 1997 | Updates Record Copy of Current TS Markup,Accompanying Discussion of Differences,Nureg Mark Ups & No Significant Hazards Evaluation Changes to Reflect Recent Review & Comments by Both Util & NRC Personnel | |
A97020, Informs That Pf Cantwell,Jk Duff & J Powers No Longer Need to Maintain Operator Licenses at Plant | 27 May 1997 | Informs That Pf Cantwell,Jk Duff & J Powers No Longer Need to Maintain Operator Licenses at Plant | |
A97023, Provides Response to NRC RAI for Addl Info Re Mod Necessary to Address Issues Identified in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions | 9 December 1997 | Provides Response to NRC RAI for Addl Info Re Mod Necessary to Address Issues Identified in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions | |
A97025, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-21 & 50-304/97-21.Corrective Actions:Two Operating Personnel Received Remedial Training & Passed Radioactive Matl Shipping Level 1 Training Course & Revised Procedures | 17 July 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-295/97-21 & 50-304/97-21.Corrective Actions:Two Operating Personnel Received Remedial Training & Passed Radioactive Matl Shipping Level 1 Training Course & Revised Procedures | |
A97028, Submits Withdrawal of 10CFR50,App R Exemption Requests. Listing of Util Commitments Made in Submittal,Encl | 18 August 1997 | Submits Withdrawal of 10CFR50,App R Exemption Requests. Listing of Util Commitments Made in Submittal,Encl | Fire Barrier Exemption Request |
A97031, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-03 & 50-304/97-03.Corrective Actions:Revised Procedure PT-19,installed Mod to Isolate Vpc from Fhb When Wall Is Down & Enhanced 10CFR50.59 SE Process | 8 August 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-295/97-03 & 50-304/97-03.Corrective Actions:Revised Procedure PT-19,installed Mod to Isolate Vpc from Fhb When Wall Is Down & Enhanced 10CFR50.59 SE Process | |
A97032, Provides Clarification of Uncertainties of RHR Operation During Nitrogen Gas Accumulation Event on 970307 | 6 August 1997 | Provides Clarification of Uncertainties of RHR Operation During Nitrogen Gas Accumulation Event on 970307 | |
A97037, Responds to NRC Re Violations Noted in Insp Rept 50-295/97-12.Corrective Actions:Revised Station Procedures Which Required Enhancements & Completed Preventive Maint on Sequence Timers Using Electrical Maint Procedure E023-1 | 18 August 1997 | Responds to NRC Re Violations Noted in Insp Rept 50-295/97-12.Corrective Actions:Revised Station Procedures Which Required Enhancements & Completed Preventive Maint on Sequence Timers Using Electrical Maint Procedure E023-1 | Safe Shutdown Condition Adverse to Quality |
A97038, Forwards Corrections for Mar & Apr 1996 & Jul 1997 Operating Status Repts for Zion Generating Station | 14 August 1997 | Forwards Corrections for Mar & Apr 1996 & Jul 1997 Operating Status Repts for Zion Generating Station | |
A97040, Forwards Response to NRC Re Violations Noted in Insp Repts 50-295/97-13 & 50-304/97-13.Corrective Actions: Operations Manager Met W/Each Shift Manager & Other Key Supervisors to Point Out Accountability Re Overtime | 15 September 1997 | Forwards Response to NRC Re Violations Noted in Insp Repts 50-295/97-13 & 50-304/97-13.Corrective Actions: Operations Manager Met W/Each Shift Manager & Other Key Supervisors to Point Out Accountability Re Overtime | |
A97047, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-20 & 50-304/97-20.Corrective Actions:Will Develop, Document & Issue Written Expectations Which Enhance Surveying & Posting Contaminated Areas by 971124 | 25 September 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-295/97-20 & 50-304/97-20.Corrective Actions:Will Develop, Document & Issue Written Expectations Which Enhance Surveying & Posting Contaminated Areas by 971124 | Grab sample |
A97050, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-13 & 50-304/97-13.Corrective Actions:Issued Nuclear Operations Notification to Other Comed Nuclear Facilities & Will Review & Evaluate Training Re Procedures | 29 September 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-295/97-13 & 50-304/97-13.Corrective Actions:Issued Nuclear Operations Notification to Other Comed Nuclear Facilities & Will Review & Evaluate Training Re Procedures | Foreign Material Exclusion |
A97051, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-17 & 50-304/97-17.CAs:unescorted Access Was Placed on Temporary Hold for Director of Fire Protection,Fire Marshal & 2 Firewatch Supervisors Pending Investigation | 13 February 1998 | Responds to NRC Re Violations Noted in Insp Repts 50-295/97-17 & 50-304/97-17.CAs:unescorted Access Was Placed on Temporary Hold for Director of Fire Protection,Fire Marshal & 2 Firewatch Supervisors Pending Investigation | |
A97052, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-02,50-304/97-02,50-295/97-07 & 50-304/97-07, Respectively.Corrective Actions:Placed Both Units in Cold Shutdown & Removed Operators Involved in Event | 1 October 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-295/97-02,50-304/97-02,50-295/97-07 & 50-304/97-07, Respectively.Corrective Actions:Placed Both Units in Cold Shutdown & Removed Operators Involved in Event | Reactor Vessel Water Level Condition Adverse to Quality |
A97055, Forwards Supplemental Info to Annual 10CFR50.46 Rept Re Changes to or Errors Discovered in Acceptable ECCS Cooling Performance Evaluation Model | 11 November 1997 | Forwards Supplemental Info to Annual 10CFR50.46 Rept Re Changes to or Errors Discovered in Acceptable ECCS Cooling Performance Evaluation Model | |
A97061, Informs NRC of Rev to NOV Commitment Made in Responding to Violations Noted in Insp Repts 50-295/96-06 & 50-304/96-06.Test Requirements Are Now Assigned from post- Maint Testing Matrix During Work Planning Effort | 26 November 1997 | Informs NRC of Rev to NOV Commitment Made in Responding to Violations Noted in Insp Repts 50-295/96-06 & 50-304/96-06.Test Requirements Are Now Assigned from post- Maint Testing Matrix During Work Planning Effort | |
A97062, Suppls Previous Submittals W/Proposed Change to LCO 3.3.1 & 3.3.2,adding Info to Bases to Specifically Identify Refs Used in Determining Allowable Values | 10 November 1997 | Suppls Previous Submittals W/Proposed Change to LCO 3.3.1 & 3.3.2,adding Info to Bases to Specifically Identify Refs Used in Determining Allowable Values | |
A97067, Provides Detailed Response as Committed to in Util Ltrs to NRC & 1103 Re Violations Noted in Insp Repts 50-295/97-19 & 50-304/97-19.Corrective Actions:Sys Engineering Personnel Briefed on Need to Ensure Offsite Svc | 21 November 1997 | Provides Detailed Response as Committed to in Util Ltrs to NRC & 1103 Re Violations Noted in Insp Repts 50-295/97-19 & 50-304/97-19.Corrective Actions:Sys Engineering Personnel Briefed on Need to Ensure Offsite Svc | Safe Shutdown |
A97068, Forwards Independent Investigation Rept Assessing Safety Conscious Work Environ at Zion Station.Rept Details Team Investigation,Conclusions & Basis for Conclusions,As Requested in | 5 December 1997 | Forwards Independent Investigation Rept Assessing Safety Conscious Work Environ at Zion Station.Rept Details Team Investigation,Conclusions & Basis for Conclusions,As Requested in | Open House |
A97071, Provides Response to Request for Addl Info for Evaluation of Third 10-yr Interval Insp Program Plan Request for Relief CR-25,per NRC | 21 November 1997 | Provides Response to Request for Addl Info for Evaluation of Third 10-yr Interval Insp Program Plan Request for Relief CR-25,per NRC | Boric Acid Liquid penetrant |
A97073, Forwards Zion Station Unit 2 SG ISI Results,Fall 1996 Refueling Outage 14 (Z2R14). List of Commitments Made in Submittal,Attached | 26 November 1997 | Forwards Zion Station Unit 2 SG ISI Results,Fall 1996 Refueling Outage 14 (Z2R14). List of Commitments Made in Submittal,Attached | |
A97075, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-22 & 50-304/97-22.Corrective Actions:Configuration Control Root Cause Investigation Was Completed in Nov 1997 | 23 December 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-295/97-22 & 50-304/97-22.Corrective Actions:Configuration Control Root Cause Investigation Was Completed in Nov 1997 | Boric Acid Foreign Material Exclusion |
A97079, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-26 & 50-304/97-26.Corrective Actions:All Other R-key Doors in Building Were Verified Closed & Locked | 22 December 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-295/97-26 & 50-304/97-26.Corrective Actions:All Other R-key Doors in Building Were Verified Closed & Locked | High Radiation Area |
A98001, Withdraws Three Applications to Amend App a (TS) to Licenses DPR-39 & DPR-48.Requested Amends Proposed Changes to Ts. Determined That Amends Are No Longer Needed | 12 February 1998 | Withdraws Three Applications to Amend App a (TS) to Licenses DPR-39 & DPR-48.Requested Amends Proposed Changes to Ts. Determined That Amends Are No Longer Needed | |