Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-98-323, First Final Response to FOIA Request for Records.Records in App a Available in Pdr.Records in App B Partially Withheld (Ref FOIA Exemption 3)9 October 1998First Final Response to FOIA Request for Records.Records in App a Available in Pdr.Records in App B Partially Withheld (Ref FOIA Exemption 3)
IR 05000272/199200915 October 1993Discusses Insp Repts 50-272/92-09,50-311/92-09 & 50-354/92-09 on 920614-0725 to Review Util Actions to Determine Potential for Record Falsification at Facilities & Forwards Nov.Nrc Concerned Re Misconduct of PersonnelFire Watch
IR 05000272/19930239 March 1994Discusses Insp Repts 50-272/93-23,50-311/93-23 & 50-354/93-25 on 931017-1127 & Forwards NOV & Proposed Imposition of Civil Penalty - $50,000
IR 05000272/19960051 July 1996Notifies NRC That Util Will Be Revising Commitment to Fill Vacant off-site Safety Review Engineer Position by 960630, Per Insp Repts 50-272/96-05 & 50-311/96-05
IR 05000272/199601411 December 1996Forwards NOV & Proposed Imposition of Civil Penalties in Amount of $100,000 for Violations Noted in Insp Repts 50-272/96-14,50-311/96-14 & 50-354/96-08.Predecisional Enforcement Conference Held on 961114
IR 05000311/19920819 November 1993Submits Addl Info Re Operator Actions Associated W/Loss of Overhead Annunciators That Occurred in Salem Unit 2 CR on 921213,w/respect to Insp Rept 50-311/92-81.Rev 1 to Procedure NC.NA-AP.ZZ-0061(Q) Encl
IR 05000352/198404810 June 1985Forwards Insp Rept 50-352/84-48 on 840827-30 at Bechtel Corp in San Francisco,Ca Re Allegations Concerning Structural & Piping Design Activities at Hope Creek,Limerick & Susquehanna.No Allegations Re Hope Creek SubstantiatedEarthquake
IR 05000354/19820047 June 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-354/82-04 & 50-355/82-03
IR 05000354/19820052 August 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-354/82-05. Initial Corrective Actions Did Not Resolve Underlying Cause of QC Problems
IR 05000354/198402110 July 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/84-21
IR 05000354/198500328 October 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/85-03.Confirms That PSSUG-GTP-2 Revised (Rev 5) to Clarify Situations Which Require Capping of Instrument Tubing
IR 05000354/198501012 June 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/85-10
IR 05000354/198501719 August 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/85-17
IR 05000354/198504323 September 1985Forwards Meeting Rept 50-354/85-43 on 850801 Re Cold Operator Licensing Exams Conducted in Jul 1985.All Issues Resolved.Second Set of Exams Will Be Conducted During Wks of 851014 & 21.W/o Encl
IR 05000354/198506429 January 1986Forwards Insp 50-354/85-64, Review of Hope Creek Tech Specs. Review of Draft Tech Specs & FSAR Performed by Parameter,Inc on 851202-13 to Determine Compliance W/Plant as-built Condition.No Violations Noted
IR 05000354/19850655 March 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/85-65
IR 05000354/198602717 September 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/86-27
IR 05000354/198603528 October 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Identified in Insp Rept 50-354/86-35
IR 05000354/198604330 September 1986Forwards Safety Insp Rept 50-354/86-43 on 860902-05.No Violations Noted
IR 05000354/198701718 December 1987Discusses Safety Insp 50-354/87-17 on 870714-0817 & Enforcement Conference on 871019 & Forwards Notice of Violation.Concerns Expressed Re Possibilities That Degradation May Have Existed Since 870410
IR 05000354/198800322 June 1988Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/88-03
IR 05000354/19880193 August 1988Forwards Insp Rept 50-354/88-19 on 880613-17.No Violations Noted
IR 05000354/198820011 November 1988Forwards Emergency Operating Procedures Insp Rept 50-354/88-200 on 880906-16.No Violations Noted.Weaknesses Involving Development & Implementation of Emergency Operating Procedures Identified
IR 05000354/198901419 September 1989Forwards Safety Insp Rept 50-354/89-14 on 890620-0814.No Violations Noted.Inspectors Noted Addl Attention to Detail Errors by Facility Personnel Similar to Ones Described in Most Recent SALP Rept 50-354/88-99
IR 05000354/199108020 October 1993Discusses Insp Rept 50-354/91-80 on 910715-19 & Forwards Synopsis of NRC Rept of Investigation Case 1-91-012
IR 05000354/199200821 January 1993Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/92-08
IR 05000354/199201115 December 1992Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/92-11.Also Ack Increased Mgt Attention & Program Upgrades to Area
IR 05000354/199600310 April 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-354/96-03 & 50-354/96-06
IR 05000354/199600430 January 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/96-04
IR 05000354/19960078 January 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/96-07Safe Shutdown
Temporary Modification
IR 05000354/19960114 April 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/96-11
IR 05000354/199608021 April 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/96-80
IR 05000354/199609931 December 1996Forwards Hope Creek SALP Rept 50-354/96-99,which Was Inadvertently Omitted from Original Rept
IR 05000354/19970015 December 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/97-01-04
IR 05000354/199700231 July 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/97-02 on 970523
IR 05000354/199700315 August 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/97-03 on 970612Condition Adverse to Quality
IR 05000354/19970041 October 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/97-04 on 970811Temporary Modification
Operability Determination
IR 05000354/199700724 February 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/97-07 on 971113Reactor Vessel Water Level
IR 05000354/199700920 March 1998Discusses Insp Repts 50-354/97-09,50-354/97-80 & 50-354/97-81 on 970224-28,970825-29 & 971005-1115 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $55,000Shutdown Margin
IR 05000354/199701016 April 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/97-10
LD-98-017, Forwards Proprietary Topical Rept CENPD-389-P, 10x20 Svea Fuel Critical Power Experiments & CPR Correlations:SVEA-96+ for Review & Approval.W/Affidavit.Proprietary Encl Withheld9 June 1998Forwards Proprietary Topical Rept CENPD-389-P, 10x20 Svea Fuel Critical Power Experiments & CPR Correlations:SVEA-96+ for Review & Approval.W/Affidavit.Proprietary Encl Withheld
LR-N899025, Responds to NRC Bulletin 88-007,Suppl 1.GE Interim Stability Recommendations Revised to Provide Manual Scram Initiation Under All Operating Conditions When Two Recirculation Pumps Trip W/Reactor in Run Mode28 February 1989Responds to NRC Bulletin 88-007,Suppl 1.GE Interim Stability Recommendations Revised to Provide Manual Scram Initiation Under All Operating Conditions When Two Recirculation Pumps Trip W/Reactor in Run Mode
LR-N970092, Provides Addl Info Re Proposed Resolution Approach for NRC Bulletin 96-003, Potential Plugging of ECCS Suction Strainers by Debris20 May 1997Provides Addl Info Re Proposed Resolution Approach for NRC Bulletin 96-003, Potential Plugging of ECCS Suction Strainers by Debris
LR-N970093, Forwards Response to Request for Info,Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info for Hope Creek Generating Station11 February 1997Forwards Response to Request for Info,Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info for Hope Creek Generating StationSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Slow transfer
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Battery sizing
Fire Protection Program
LR-N970126, Forwards Rev 9 to Security Plan.Safeguards Justification for Proposed Changes to Plan Included as Attachment 1 to Ltr. Encl Withheld,Per 10CFR73.55(d)(5)11 March 1997Forwards Rev 9 to Security Plan.Safeguards Justification for Proposed Changes to Plan Included as Attachment 1 to Ltr. Encl Withheld,Per 10CFR73.55(d)(5)
LR-N970182, Forwards MOR for Feb 1997 & Summary of Changes,Tests & Experiments That Were Implemented During Jan 1997, Per Requirements of 10CFR50.59(b)14 March 1997Forwards MOR for Feb 1997 & Summary of Changes,Tests & Experiments That Were Implemented During Jan 1997, Per Requirements of 10CFR50.59(b)
LR-N970188, Submits Suppl to Response to NRC Re Violations Noted in Insp Repts 50-354/96-03 & 50-354/96-06 Cas:Design & Licensing Basis Overview Training Course Being Developed & Will Be Available to Engineering Support Personnel24 March 1997Submits Suppl to Response to NRC Re Violations Noted in Insp Repts 50-354/96-03 & 50-354/96-06 Cas:Design & Licensing Basis Overview Training Course Being Developed & Will Be Available to Engineering Support Personnel
LR-N970191, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-354/96-07.Corrective Actions:Review of Hope Creek & Salem MORs for 1991 & 1993 Have Been Completed & Subsequent Revs for Each Missing Document Was Reviewed31 March 1997Responds to NRC Ltr Re Violations Noted in Insp Rept 50-354/96-07.Corrective Actions:Review of Hope Creek & Salem MORs for 1991 & 1993 Have Been Completed & Subsequent Revs for Each Missing Document Was Reviewed
LR-N970218, Submits 1996 Summary of Revised Regulatory Commitments22 April 1997Submits 1996 Summary of Revised Regulatory Commitments
LR-N970251, Forwards Operating Statistics for Mar 1997 W/Summary of Changes,Tests & Experiments That Were Implemented During Feb 1997,per Requirements of 10CFR50.59(b)14 April 1997Forwards Operating Statistics for Mar 1997 W/Summary of Changes,Tests & Experiments That Were Implemented During Feb 1997,per Requirements of 10CFR50.59(b)