I April 10, 1997

>

Mr. Leon Chief Nudear Officer and President Nuclear Business Unit Public Service Electric & Gas Company Post Office Box 236  :

Hancocks Bridge, New Jersey 08038 SUBJECT: INSPECTION REPORT NO. 50-354/96-03 AND 50-354/96-06  ;

Dear Mr. Eliason:

P

This refers to a March 24,1997 letter to us, signed by Mr. E. C. Simpson that updated and '

i revised commitments that your organization made for design and licensing basis training, !

as described in a letter to us, dated November 22,1996. I

'

l We have reviewed your revised commitments and find them acceptable. i

!  ;

! We appreciate your cooperation.

l i

Sincerely,

'

ORIGINAL SIGNED BY:

!

. James C. Linville, Chief Projects Branch No. 3 l- Division of Reactor Projects Docket No. 50-354 I l

f

\

-

ggot t I- 9704170143 970410 PDR ADOCK 05000354 .

'

O PDR 170032 s.upuppppp!B i

- - . _ - . ,_ .. _ __.

_-. - . .. .

!

-

.

l *

!

l Mr. Leon ! cc w/ encl:

!

L. Storz, Senior Vice President - Nuclear Operations l E. Simpson, Senior Vice President - Nuclear Engineering E. Salowitz, Director - Nuclear Business Support A. F. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.

l J. A. Isabella, Manager, Joint Generation l Atlantic Electric l M. Bezilla, General Manager - Hope Creek Operations J. Benjamin, Director - Quality Assurance & Nuclear Safety Review j i D. Powell, Manager - Licensing and Regulation j l

'

R. Kankus, Joint Owner Affairs A. C. Tapert, Program Administrator 1 Jeffrey J. Keenan, Esquire '

M. J. Wetterhahn, Esquire Consumer Advocate, Office of Consumer Advocate William Conklin, Public Safety Consultant, Lower Alloways Creek Township State of New Jersey State of Delaware l

!

!

l l

l

i

!

I

\

l

. _ _ _ _ _ . _ _ _ _ . . _ . . . _ . . . _ _ . _ _ _ . ._ _ _ __. . -

.

-

u

!

.

! Mr. Leon l

! Distribution w/ encl:

Region i Docket Room (with concurrences)

J. Wiggins, DRS i

K. Gallagher, DRP ,

l D. Screnci, PAO '

i J. Linville, DRP i S. Barber, DRP R. DePriest, DRP Nuclear Safety Information Center (NSIC)

NRC Resident inspector l PUBLIC W. Dean, OEDO

!- D. Jaffe, Project Manager, NRR J. Stolz, PDI-2, NRR l Inspection Program Branch, NRR (IPAS)

'

R. Correia, NRR

D. Taylor, NRR D. Holody, EO DRS File (1)

i

!

l DOCUMENT NAME: A: HC960306. REP I Ta rective a copy of this document. Indicate in the bot: "C" = Copy without attachment' enclosure 'E" = Copy with attachment / enclosure 'N" = No copy

_

OFFICE Rl/DRP /) l NAME JLinville (fs

! DATE. 04/10/97p V OFFICIAL RECORD COPY

,

b

m_...__.____ _ . . _ _ . _ m _m.,___. _ _ . . _ _ . _ _ . . _ . . _ _ _ _ , _ _ . . . _ -

- _ _ . - _ . . _ _ _ . . _ _ .

. .

,

"

, ,

.

Put>lic Service Electric and Gas company E.C. Simpson Public Service Electric and Gas ^m P.o. Box 236. Hancocks Bridge NJ 08038 009-339 1700

'

ser*r vce Preeldst . Nuch Engnewing MAR 241997 LR-N970186 i

Mr. James Lieberman Director, Office of Enforcement l U. S. Nuclear Regulatory Commission  ;

One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738  !

!

!

Gentlemen- .

SUPPLEMENT TO REPLY TO NOTICES OF VIOLATION l LETTER WITH PAYMENT OF CIVIL PENALTY  !

INSPECTION REPORT NOS. 50-354/96-03 AND 354/96-06 }

HOPE CREEK GENERATING STATION '

FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 -

<

in letter dated November 22,1996, (LR-N96379) Public Service Electric and Gas (PSE&G) committed to provide design and licensing basis training to engineering personnel. Specifically, PSE&G committed to the following long term corrective actions:

!

1. Corrective Action ll.E.1 and Corrective Action Ill.E.1 of Attachmerit 2:

A Design and Licensing Basis Overview Training Course is being developed and will be available to Engineering Support Personnel by l l

March 31,1997. The training will emphasize the importance of the design  !

and licensing basis, and the role each individual has in the safe  !

conservative operation of the plants.

2. Corrective Action ll.E.2 and Corrective Action Ill.E.3 of Attachment 2: .

System specific design basis training covering the contents, use of, and j L '

i importance of design bases and licensing bases will be established and L conducted for System Managers and Design Engineers by March 31,

1998.

I

't

? !"

. _ _ - ._

_ . _ - _ . ~. _ __ _ _ _ _ .. _ - _ _ _ _ . _

. MAR 241997

- Mr. Jim:0 Lisb;rmin -2-LR-N970188 By this letter, the completion date for corrective actions ll.E.1 and Ill.E.1 in 1 Attachment 2, regar, ding design and licensing basis training of Engineering <

Support Personnel, is being extended from March 31,1997 to April 30,1997. By March 31,1997, approximately 75% of the approximately 350 Engineering

'

Support Personnel will have been trained. The remaining personnel have been scheduled for training during the month of April.

In addition, corrective actions ll.E.2 and Ill.E.3 in Attachment 2, regarding system specific design basis training of System Managers and Design l'

Engineers, are being deleted. The deletion of these commitments is appropriate given the actions and commitments discussed in Attachment 2 of PSE&G's .

response, dated February 11,1997, to the NRC's " Request for Information  !

Pursuant to 10CFR50.54(f) Regarding Adequacy and Availability of Design  ;

Bases information". These actions and commitments are expected to result in  :

!

improvements in the understanding of the design bases similar to the original commitment. ,

These commitment changes were evaluated in accordance with the " Guideline i for Managing NRC Commitments", Revision 1, issued by the Nuclear Energy Institute on June 9,1995. The guideline recommends timely notification of j revised commitments to the NRC when the origina! commitments were identified i as a long term corrective action in response to an NRC Notice of Violation.

PSE&G is hereby notifying the NRC that PSE&G is modifying the above commitments.

I Should you have any questions or comments on this transmittal, do not hesitate j to contact us.

Sincerely,

.

l l

,

t n

,

@

on.4on j

- . -

. . - --- - _ _ --

_ _ _ _ _. _ _ _ - . . . . _ . . _ _ - - - - . - _ _ _ _ - _ - . _ - _ _ _ . . . _ . _. __ _ -

.

,.

.

.

Mr.Jrmes LI b2rm2n -3-LR-N970188 C United States Nuclear Regulatory Commission Document Control Desk

'

Washington, D.C. 20555 Mr. H. J. Miller, Administrator - Region i U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

Mr. D. Jaffe, Licensing Project Manager - Hope Creek U. S. Nuclear Regulatory Commission One White Flint North

'

11555 Rockville Pike

Mail Stop 14E21 Rockville, MD 20852 ,

'

,

Mr. R. Summers ( USNRC Senior Resident inspector (X24)

!

Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering 33 Arctic Parkway

CN 415 ,

l . Trenton, NJ 08625 l

l u

.. _ . . _- . . . _. __ . _ _ _ . - - _. . - _ _ _ _ . _ . . _ -- _ _ . _ . - _ - - - _ _ _ _ _

-

,

. .

,

,.

!

,

REF: LR-N970188 l

l l

STATE OF NEW JERSEY )

) SS.  !

COUNTY OF SALEM )

E. C. Simpson, being duly sworn according to law deposes and says:

I am Senior Vice President - Nuclear Engineering of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced l letter, conceming the Hope Creek Generating Station, are true to the best of my knowledge, information and belief. [

+

.

~ ,

t

. / l

'

/

.

!

'

l Subscribed and Swo(to before me

'

thisAN

'

da of / rid .1997 1

.

I l Inku) '

DVH%

I4dtary Publichf Ne/Je/sey l l KIMBERLY Jo BROWN l NOTARY PUBLIC 0F NEW JERSEY  ;

IAy Conunission Expires April 21,1998 l My Commission expires on l

4 l