IR 05000354/1996004
| ML20134F744 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 01/30/1997 |
| From: | Larry Nicholson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Storz L Public Service Enterprise Group |
| References | |
| NUDOCS 9702100127 | |
| Download: ML20134F744 (3) | |
Text
January 30, 1997
SUBJECT:
NRC INSPECTION NO. 50-354/96-04 l
t
Dear Mr. Storz:
-
i This letter refers to your December 30,1996 correspondence, regarding the status of your
tagging program corrective actions,
,
j i
Thank you for informing us of the revised corrective action schedule documented in your letter. These actions will be examined during a future inspection of you licensed program,
,
i
,
Your cooperation with us is appreciated.
i i
i
Sincerely,
-
'
ORIGINAL SIGNED BY:
j Larry E. Nicholson, Chief Projects Branch 3
Division of Reactor Projects
,
l Docket No.
50 354 i
!
t i
i J
i 9702100127 970130 PDR ADOCK 05000354 G
.
!
,
.-
_
..
.
.-.
. _
_
__
_ _ _
.
.
.
-
-. -
.
,
-
i
!
cc:
L. R. Eliason, Chief Nuclear Officer and President E. Simpson, Senior Vice President, Nuclear Engineering M. Bezilla, General Manager - Hope Creek Operations D. Powell, Manager, Licensing and Regulation
J. Benjamin, Director - Quality Assurance and Nuclear Safety Review R. Kankus, Joint Owner Aff airs A. Tapert, Program Administrator
E. Salowitz, Director - Nuclear Business Support I
cc w/cy of Licensee's Letter:
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
R. E. Selover, Esquire M. Wetterhahn, Esquire
!
P. MacFarland Goelz, Manager, Joint Generation Department,
Atlantic Electric Company
Consumer Advocate, Office of Consumer Advocate W. Conklin, Public Safety Consultant, Lower Alloways Creek Township State of New Jersey
'
State of Delaware
,
-
-
-
-
-
.
_. _ _ _ _
.
-
.
.
-..
_... -
._-
-
.....
-
.__
. - -.
-.
_
.
-
.
'
.
.
Distribution w/cy of Licensee's Response Letter:
Region 1 Docket Room (with concurrences)
.
D. Jaffe, NRR
.;
W. Dean, OEDO J. Stolz, PDI-2, NRR J. Zimmerman, NRR L. Nicholson, DRP
S. Barber, DRP R. DePriest, DRP
i D. Screnci, PAO R. Summers, SRI
,
Kay Gallagher, DRP
Inspection Program Branch, NRR
Nuclear Safety Information Center (NISC)
~
PUBLIC i
i
l
!
!
i
l
4
,
i
4 DOCUMENT NAME: a: reply.hc To receive a copy of this document, Indicate in the bos: "C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
"N* = No copy OFFICE Rl:DRFf l
l NAME LNicM I\\
DATE 17f97 OFFICIAL RECORD COPY
. _ _
a *..
o d
Public Service Electric and Gas Company Louis Pubhc Service Electnc and Gas Company P O. Box 236. Hancocks Bridge, NJ 08038 609-339-5700 Senor Vice President. Nuclear Operatons DEC 3 0 EG6 LR-N96430 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Gentlemen:
,
UPDATE ON THE STATUS OF TAGGING PROGRAM CORRECTIVE ACTIONS NRC INSPECTION REPORT NO. 50-354/96-04 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NO. NPF-57 DOCKET NO. 50-354 On June 7, 1996, the NRC issued Integrated Inspection Report 50-354/96-04 for the Hope Creek Generating Station.
In that Inspection Report, the NRC requested that Public Service Electric
and Gas Company (PSE&G) provide information relative to the i
planned corrective actions regarding the Safety Tagging Program.
On August 6, 1996, via letter LR-N96208, PSE&G described the key corrective actions taken and/or planned to improve the implementation of the Safety Tagging Program.
On October 31, 1996, via letter LR-N96345, PSE&G provided an update on the status of one of those corrective actions, specifically the revision to Safety Tagging Program procedure NC.NA-AP. ZZ-0015 (Q).
That letter stated that the procedure has been revised and approved by the Station Operations Review Committee at Salem and Hope Creek, but that revision of additional subordinate procedures and personnel training must occur prior to implementing that procedure.
Implementation of the revised Safety Tagging Program was then rescheduled to occur i
by December 31, 1996.
Because of required resolution of issues raised during the Safety Tagging Program r. raining (concerning tagging responsibilities and worker safety issues), PSE&G must reschedule implementation of the revised Safety Tagging Program.
The revised Safety Tagging Program will now be implemented by January 15, 1997.
This revised schedule will also require the extension of a commitment to evaluate the effectiveness of the corrective actions implemented to improve the Safety Tagging Program.
This evaluation will now be implemented by March 1, 1997 instead of January, 1997.
i n~ P,..m,,,
W fleryckd Popo, bI )
O
'
w
. - - -..
-.-
__- -. - - -
.. _.
..
.o..
.
,
l DEC 3 01996
'
Document Control Desk-2-LR-N96430 Should you have any questions or comments on this transmittal, do not hesitate to contact us.
Sincerely,
!
.)
/ & vs
C Mr. H. Miller, Administrator - Region I U.
S. Nuclear Regulatory Commission 475 Allendale Road
.
'
King of Prussia, PA 19406
.
Mr. D.
Jaffe, Licensing Project Manager - Hope Creek l
U. S. Nuclear Regulatory Commission One White Flint North l
11555 Rockville Pike Mail Stop 14E21
,
Rockville, MD 20852 Mr.
R.
Summers USNRC Senior Resident Inspector (X24)
Mr.
K. Tosch, Manager IV Bureau of Nuclear Engineering 33 Arctic Parkway CN 415 Trenton, NJ 08625
(b)
95-4933