Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20215J6116 May 1987Notification of 870513 Meeting W/Util in Bethesda,Md to Discuss Cooling Tower Performance Tests
ML20215M56729 October 1986Discusses Similarity of Units 1 & 2 Re Pump & Valve Operability & Seismic Qualification.All Items Identical W/Exception of Unit 1 Electrical Penetration Assemblies Mfg by Conax Corp & Unit 2 Assemblies Mfg by Bunker Ramo
ML20216C60823 June 1987Notification of 870629 Meeting W/Util to Discuss Transfer of Ownership of Facilities
ML20216H34017 March 1998Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal
ML20216H69717 March 1998Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF
ML20217B39023 September 1997Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1
ML20217D42630 September 1997Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation EnclStroke time
Enforcement Discretion
Operability Determination
Liquid penetrant
ML20217D47631 July 1996Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate FutureSafe Shutdown
Boric Acid
Shutdown Margin
Packing leak
High Radiation Area
Half scram
Fire Barrier
Stroke time
Internal Flooding
Probabilistic Risk Assessment
Zebra Mussel
Emergency Lighting
Foreign Material Exclusion
Scram Discharge Volume
Operability Determination
Fire Protection Program
Power change
Siren
ML20217D5329 November 1995Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be AddressedBoric Acid
Shutdown Margin
Emergency Lighting
Operability Determination
Fire Protection Program
Hourly Fire Watch
Scaffolding
Operability Assessment
ML20217D54227 November 1996Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman JacksonSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Foreign Material Exclusion
ML20217D54618 April 1997Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & CommissionSafe Shutdown
Fitness for Duty
Packing leak
High Radiation Area
Ultimate heat sink
Fire Barrier
Contraband
Emergency Lighting
Battery sizing
Deep Dose Equivalent
Fire Protection Program
Fire Watch
Scaffolding
ML20217E15926 September 1997Notification of 971001 Meeting W/Ceco in Rockville,Maryland to Discuss Licensee Plans for SG Replacement Program at Byron,Unit 1
ML20217E38823 April 1998Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion
ML20217H54231 March 1998Discusses Completion of SG Replacement Proj at Plant,Unit 1. Plant Resumed Power Operation on 980308
ML20217K82716 October 1997Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators
ML20217Q95328 August 1997Notification of 970904 Meeting W/Util in Rockville,Md to Discuss CE Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Msb
ML20235K32513 July 1987Discusses OL Review Costs.Total Review Costs Recalculated. Util Will Not Be Billed for Addl Review Costs.Breakdown of Addl Review Costs by Program Ofc Encl
ML20235R5415 October 1987Responds to Request for Review of safety-related Instrument Power Supply Mod & Determination If Unresolved Safety Question Involved.Nrc Believes 7.5 Kv Replacement Inverter Adequate & Mod Meets Capacity Requirements of GDC 17
ML20236E01616 October 1987Forwards C Rich Request for Hearing on Util Request for Amend to License DPR-67,for Appropriate Action.Served on 871020
ML20236K29729 April 1986Comments on Review of Draft AO Rept Provided by 860407 Memo. Failure of Lifting Rig Attachment While Lifting Upper Guide Structure at Facility Addressed
ML20236N51122 October 1997Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST AcceptableBoric Acid
ML20236Y6308 August 1998Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld
ML20237A0017 August 1998Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl
ML20237B26811 December 1987Requests That Encl 10CFR50.App I Evaluations,For Listed Facilities Not Already Covered by Repts in Dcs,Be Entered Into DCS Sys on Microfiche
ML20237D43321 August 1998Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs
ML20238E60415 September 1978Forwards Ltrs to Utils Documenting NRC Position Presented at 780802 Meeting & Requesting That STS Allowing Limited Reactor Protection Sys Channel Bypass Be Proposed
ML20244A54610 April 1989Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS
ML20244A55710 April 1989Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports
ML20244D32312 March 1985Forwards 850219 Meeting Rept Re Util Concerns About Offsite/ Emergency Classifications.Guidance Requested
ML20244D63315 January 1986Forwards SER Providing Risk Perspective of Util Proposal to Increase Allotted Outage Time from 3 to 7 Days for safety- Related Sys,Per Review of Util PRA (WCAP-10526).Review Results Listed
ML20245A74515 June 1989NRC Official Hours.* Advises of Appeal Board Hours in Connection W/Pending Adjudicatory Proceedings.W/Certificate of Svc.Served on 890615
ML20245D26615 April 1988Requests That Project Managers for Listed Plants Notify Respective Utils of Potential for Unqualified Penetrations. Licensee Should Verify Qualification & Rept Results by 880422
ML20246P05315 May 1989Forwards Corrected Page 41 to ASLB 890509 Initial Decision. W/Certificate of Svc.Served on 890517
ML20247A76224 March 1989Forwards Corrected Pages 15,24,25 & 26 to NRC 890317 Findings of Fact,Per Stated Clarifications & Corrections
ML20247B75419 July 1989Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete
ML20248L8629 June 1998Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld
ML20249A22312 June 1998Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion
NUREG-0843, Informs of Potential Deficiency Re 860702 Application for Amend to License NPF-16.Applicability of GDC 5 Discussed in SER (NUREG-0843) Section 9.1.2 May Need Evaluation & Analysis.Served on 8612129 December 1986Informs of Potential Deficiency Re 860702 Application for Amend to License NPF-16.Applicability of GDC 5 Discussed in SER (NUREG-0843) Section 9.1.2 May Need Evaluation & Analysis.Served on 861212
NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl29 June 1994Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl
NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13532 May 1989Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353High Radiation Area
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Design basis earthquake
Earthquake
Control of Heavy Loads
Chernobyl
Turbine Missile
Fuel cladding
Backfit
Fatality
NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants14 February 1989Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power PlantsSafe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Finite Element Analysis
Design basis earthquake
Earthquake
Control of Heavy Loads