ML20215M567

From kanterella
Jump to navigation Jump to search
Discusses Similarity of Units 1 & 2 Re Pump & Valve Operability & Seismic Qualification.All Items Identical W/Exception of Unit 1 Electrical Penetration Assemblies Mfg by Conax Corp & Unit 2 Assemblies Mfg by Bunker Ramo
ML20215M567
Person / Time
Site: Byron  
Issue date: 10/29/1986
From: Olshan L
Office of Nuclear Reactor Regulation
To: Bagchi G
Office of Nuclear Reactor Regulation
References
NUDOCS 8611030030
Download: ML20215M567 (1)


Text

October 29,.1986

,,. DISTRIBUTION-iDocket File;,,2 NOTE T0:

G. Bagchi, Section Leader

~NRC PDR~~~

Engineering Branch Local PDR PD#3 Rdg.

FROM:

L. Olshan, Project Manager L. Olshan Project Directorate #3 C. Vogan S. Varga

SUBJECT:

SIMILARITY OF BYRON 1 AND BYRON 2 REGARDING PUMP AND VALVE OPERABILITY AND SEISMIC QUALIFICATION As you requested, Comonwealth Edison confirmed in a telephone call on October 28, 1986 that all the safety-related pumps and valve, and the safety-related electrical and mechanical equipment that requires seismic and dynamic qualification, are identical for Byron 1 and Byron 2, with one exception. The Electrical Penetration Assemblies for Unit 1 are made by Conax Corporation, while those for Unit 2 are made by Bunker Remo. This difference was given to our audit team during its September 13 - September 17, 1982 audit of Byron.

Thus, I conclude that the Section 3.10 of Supplement No. 5 applies to both Byron Units.

t)riginal signe *. ty*

Leonard 01shan, Project Manager Project Directorate #3 PD#3 h PD#3 b#./