Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML110730138 | 21 April 2011 | February 22, 2011, Summary of Pre-application Meeting with Carolina Power & Light and Representatives Regarding Upcoming BWR Boraflew License Amendment Request W/ Public Meeting Slides | |
ML111100026 | 20 April 2011 | Meeting Summary - Shearon Harris - Slide Presentation | |
ML111370408 | 9 May 2011 | Meeting Slides Regarding Human Performance Improvement | Safe Shutdown |
ML11279A251 | 6 October 2011 | Slides for Forthcoming Meeting with Oconee Nuclear Station, Units 1 ,2 and 3 Regarding Proposed Tornado Mitigation Strategy | Shutdown Margin Tornado Missile TORMIS |
ML11354A291 | 13 December 2011 | Meeting Slides - Meeting with Carolina Power and Light Discussion of ANP-3011 | |
ML12017A092 | 17 January 2012 | Slides for Meeting with Duke Energy Carolinas to Discuss Oconee Nuclear Station, Units 1, 2, and 3 Regarding Major Project Plans | Fire Barrier Probabilistic Risk Assessment |
ML12076A165 | 11 January 2012 | Meeting Slides - Harris Realistic LBLOCA Question Response Meeting | |
ML12103A053 | 12 April 2012 | Annual Assessment Meeting Slides for April 9, 2012 | License Renewal |
ML12145A705 | 14 June 2012 | Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Installation of Main Steam Isolation Valves at Oconee Nuclear Station, Units 1, 2, and 3 | Tornado Missile TORMIS |
ML12166A203 | 24 May 2012 | Meeting Slides - Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Installation of Main Steam Isolation Valves at Oconee Nuclear Station, Units 1, 2, and 3 | Tornado Generated Missile TORMIS |
ML12242A432 | 28 August 2012 | Summary of Category 1 Public Meeting - Regulatory Conference and Predecisional Enforcement Conference | Preliminary White Finding |
ML12277A027 | 2 October 2012 | Slides - Summary of Meeting with Duke Energy Carolinas to Discuss Noncenservative Technical Specifications License Amendment Requests | |
ML12363A134 | 11 May 2009 | Slides for Closed Meeting May 11, 2009 with Duke on the Oconee Flooding Issue | Earthquake |
ML13004A365 | 8 November 2012 | Slides for Public Meeting on Mitigation Strategies for NRC Order EA-12-049 | High winds Ultimate heat sink Mission time FLEX Tornado Generated Missile |
ML13011A218 | 17 December 2012 | Slides for Public Meeting on NFPA-805 Fire Protection Program | Fire Protection Program |
ML13035A233 | 30 January 2013 | Projects Meeting - Licensee'S Public Meeting Slides | Fire impairment Fire Watch |
ML13035A244 | 30 January 2013 | Projects Meeting - NRC Slides | |
ML13052A782 | 6 February 2013 | Slides on Oconee Ssf Flood Barrier Breach SDP - Lessons Learned | Backfit |
ML13053A060 | 19 February 2013 | Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, External Flood Reevaluation | |
ML13056A099 | 6 February 2013 | Meeting Slides on Oconee Ssf Flood Barrier Breach Sdsp - Lessons Learned | Backfit |
ML13056A102 | 6 February 2013 | Meeting Slides on Oconee Flood Issue Jocassee Dam Failure Frequency | |
ML13056A104 | 6 February 2013 | Briefing Slides on the Fliod Scenario Rupture of Jocassee Dam | |
ML13056A128 | 19 September 2008 | DHS Briefing Slides on Oconee Flood Protection and the Jocassee Dam Hazard | Backfit |
ML13056A129 | 1 October 2008 | Briefing Slides on Oconee Flood Issue Jocassee Dam Failure Frequency | |
ML13057A612 | 5 November 2008 | NRC Meeting with Duke Energy Carolinas, LLC Briefing Slides on Oconee Site Flood Protection | |
ML13064A102 | 5 March 2013 | Slides from Predecisional Enforcement Conference with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Apparent Violation of a License Condition on Fire Protection | Probabilistic Risk Assessment |
ML13066A760 | 19 May 2011 | Executive Team Briefing on Draft Information Notice Potential Nonconservation Screening Value for Dam Failure Frequency in Pras. | Probabilistic Risk Assessment |
ML13095A213 | 9 April 2013 | Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, External Flood Reevaluation | Ultimate heat sink FLEX |
ML13099A447 | 10 April 2013 | Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Milestones for Corrective Actions for an Apparent Violation of a License Condition on Fire Protection | Mission time Fire Protection Program |
ML13123A204 | 25 March 2013 | Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Concerning the Flooding Hazard Reevaluation Report | |
ML13170A335 | 13 June 2013 | Presentation - NRC Special Inspection Meeting - Harris Reactor Pressure Vessel | Nondestructive Examination |
ML13204A256 | 9 July 2013 | Handout - LOOP Voltage Setpoint Change Presubmittal Conference Call - July 9, 2013 | |
ML13211A378 | 30 July 2013 | 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 | |
ML13212A337 | 31 July 2013 | NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting | |
ML13226A259 | 23 April 2013 | E-mail from D. Hubbard, Duke to J. Boska, NRR on Non-Security Sensitive Version of March 25th Presentation | |
ML13226A261 | 25 March 2013 | E-mail from J. Boska, NRR to E. Connor, Greenville News March 25 Oconee Meeting | |
ML13226A264 | 25 March 2013 | E-mail from J. Boska, NRR to J. Riccio, Slides for Oconee Public Meeting on 3/25/13 at 2pm | |
ML13226A265 | 23 April 2013 | E-mail from D. Hubbard, Duke to J. Boska, NRR on Security Sensitive Version | |
ML13226A266 | 3 May 2013 | E-mail from J. Boska, NRR to S. Hicks, Ois FW: Change in Public Availability of Slide Package | |
ML13239A337 | 27 August 2013 | NRC Meeting Slides, Oconee Major Project Meeting - August 28, 2013 | |
ML13239A340 | 27 August 2013 | Presentation for NRC Projects | FLEX Fire Watch |
ML13275A225 | 24 September 2013 | 9/24/13 Meeting Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Jocassee Dam Seismic Analysis | Earthquake |
ML13275A269 | 3 October 2013 | 10/3/13 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Protected Service Water Alternate Cooling | Safe Shutdown GOTHIC |
ML13308A007 | 1 November 2013 | Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. | |
ML13312A988 | 8 November 2013 | Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications | |
ML13336A545 | 13 November 2013 | Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Keowee Hydro Unit Generator Field Pole Rewind Project - License Amendment Request | Safe Shutdown Mission time |
ML14055A410 | 4 February 2014 | Meeting Slides on Standby Shutdown Facility Flood Barrier Breach Violation Informal Reassessment | |
ML14058A025 | 12 August 2008 | Briefing Slides for Commission Assistants Brief on Oconee Flood Protection and the Jocassee Dam Hazard | Backfit |
ML14058A027 | 19 September 2008 | DHS Briefing Slides on Oconee Flood Protection and the Jocassee Dam Hazard | Backfit |
ML14058A029 | 21 October 2008 | NRR Lt Meeting on Oconee Flood Protection and the Jocassee Dam Hazard | Backfit |