Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML11073013821 April 2011February 22, 2011, Summary of Pre-application Meeting with Carolina Power & Light and Representatives Regarding Upcoming BWR Boraflew License Amendment Request W/ Public Meeting Slides
ML11110002620 April 2011Meeting Summary - Shearon Harris - Slide Presentation
ML1113704089 May 2011Meeting Slides Regarding Human Performance ImprovementSafe Shutdown
ML11279A2516 October 2011Slides for Forthcoming Meeting with Oconee Nuclear Station, Units 1 ,2 and 3 Regarding Proposed Tornado Mitigation StrategyShutdown Margin
Tornado Missile
TORMIS
ML11354A29113 December 2011Meeting Slides - Meeting with Carolina Power and Light Discussion of ANP-3011
ML12017A09217 January 2012Slides for Meeting with Duke Energy Carolinas to Discuss Oconee Nuclear Station, Units 1, 2, and 3 Regarding Major Project PlansFire Barrier
Probabilistic Risk Assessment
ML12076A16511 January 2012Meeting Slides - Harris Realistic LBLOCA Question Response Meeting
ML12103A05312 April 2012Annual Assessment Meeting Slides for April 9, 2012License Renewal
ML12145A70514 June 2012Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Installation of Main Steam Isolation Valves at Oconee Nuclear Station, Units 1, 2, and 3Tornado Missile
TORMIS
ML12166A20324 May 2012Meeting Slides - Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Installation of Main Steam Isolation Valves at Oconee Nuclear Station, Units 1, 2, and 3Tornado Generated Missile
TORMIS
ML12242A43228 August 2012Summary of Category 1 Public Meeting - Regulatory Conference and Predecisional Enforcement ConferencePreliminary White Finding
ML12277A0272 October 2012Slides - Summary of Meeting with Duke Energy Carolinas to Discuss Noncenservative Technical Specifications License Amendment Requests
ML12363A13411 May 2009Slides for Closed Meeting May 11, 2009 with Duke on the Oconee Flooding IssueEarthquake
ML13004A3658 November 2012Slides for Public Meeting on Mitigation Strategies for NRC Order EA-12-049High winds
Ultimate heat sink
Mission time
FLEX
Tornado Generated Missile
ML13011A21817 December 2012Slides for Public Meeting on NFPA-805 Fire Protection ProgramFire Protection Program
ML13035A23330 January 2013Projects Meeting - Licensee'S Public Meeting SlidesFire impairment
Fire Watch
ML13035A24430 January 2013Projects Meeting - NRC Slides
ML13052A7826 February 2013Slides on Oconee Ssf Flood Barrier Breach SDP - Lessons LearnedBackfit
ML13053A06019 February 2013Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, External Flood Reevaluation
ML13056A0996 February 2013Meeting Slides on Oconee Ssf Flood Barrier Breach Sdsp - Lessons LearnedBackfit
ML13056A1026 February 2013Meeting Slides on Oconee Flood Issue Jocassee Dam Failure Frequency
ML13056A1046 February 2013Briefing Slides on the Fliod Scenario Rupture of Jocassee Dam
ML13056A12819 September 2008DHS Briefing Slides on Oconee Flood Protection and the Jocassee Dam HazardBackfit
ML13056A1291 October 2008Briefing Slides on Oconee Flood Issue Jocassee Dam Failure Frequency
ML13057A6125 November 2008NRC Meeting with Duke Energy Carolinas, LLC Briefing Slides on Oconee Site Flood Protection
ML13064A1025 March 2013Slides from Predecisional Enforcement Conference with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Apparent Violation of a License Condition on Fire ProtectionProbabilistic Risk Assessment
ML13066A76019 May 2011Executive Team Briefing on Draft Information Notice Potential Nonconservation Screening Value for Dam Failure Frequency in Pras.Probabilistic Risk Assessment
ML13095A2139 April 2013Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, External Flood ReevaluationUltimate heat sink
FLEX
ML13099A44710 April 2013Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Milestones for Corrective Actions for an Apparent Violation of a License Condition on Fire ProtectionMission time
Fire Protection Program
ML13123A20425 March 2013Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Concerning the Flooding Hazard Reevaluation Report
ML13170A33513 June 2013Presentation - NRC Special Inspection Meeting - Harris Reactor Pressure VesselNondestructive Examination
ML13204A2569 July 2013Handout - LOOP Voltage Setpoint Change Presubmittal Conference Call - July 9, 2013
ML13211A37830 July 20137/31/2013 NRC Public Meeting Presentation on NEI 01-01
ML13212A33731 July 2013NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting
ML13226A25923 April 2013E-mail from D. Hubbard, Duke to J. Boska, NRR on Non-Security Sensitive Version of March 25th Presentation
ML13226A26125 March 2013E-mail from J. Boska, NRR to E. Connor, Greenville News March 25 Oconee Meeting
ML13226A26425 March 2013E-mail from J. Boska, NRR to J. Riccio, Slides for Oconee Public Meeting on 3/25/13 at 2pm
ML13226A26523 April 2013E-mail from D. Hubbard, Duke to J. Boska, NRR on Security Sensitive Version
ML13226A2663 May 2013E-mail from J. Boska, NRR to S. Hicks, Ois FW: Change in Public Availability of Slide Package
ML13239A33727 August 2013NRC Meeting Slides, Oconee Major Project Meeting - August 28, 2013
ML13239A34027 August 2013Presentation for NRC ProjectsFLEX
Fire Watch
ML13275A22524 September 20139/24/13 Meeting Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Jocassee Dam Seismic AnalysisEarthquake
ML13275A2693 October 201310/3/13 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Protected Service Water Alternate CoolingSafe Shutdown
GOTHIC
ML13308A0071 November 2013Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection.
ML13312A9888 November 2013Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications
ML13336A54513 November 2013Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Keowee Hydro Unit Generator Field Pole Rewind Project - License Amendment RequestSafe Shutdown
Mission time
ML14055A4104 February 2014Meeting Slides on Standby Shutdown Facility Flood Barrier Breach Violation Informal Reassessment
ML14058A02512 August 2008Briefing Slides for Commission Assistants Brief on Oconee Flood Protection and the Jocassee Dam HazardBackfit
ML14058A02719 September 2008DHS Briefing Slides on Oconee Flood Protection and the Jocassee Dam HazardBackfit
ML14058A02921 October 2008NRR Lt Meeting on Oconee Flood Protection and the Jocassee Dam HazardBackfit