Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
BVY-91-001, Responds to NRC Re Unresolved Item Noted in Insp Rept 50-271/90-13 on 901001-05.Corrective Actions:Release of Liquids from Radiation Control Area Which Could Be Contaminated W/Licensed Matls Halted4 January 1991Responds to NRC Re Unresolved Item Noted in Insp Rept 50-271/90-13 on 901001-05.Corrective Actions:Release of Liquids from Radiation Control Area Which Could Be Contaminated W/Licensed Matls Halted
BVY-91-027, Forwards Results of Licensed Operator Requalification Exams Conducted During Wk of 910225,per NUREG-1021.Common Weaknesses Noted Included,Missing Question 1 on Static Eliminator Scenario 16 & 178 March 1991Forwards Results of Licensed Operator Requalification Exams Conducted During Wk of 910225,per NUREG-1021.Common Weaknesses Noted Included,Missing Question 1 on Static Eliminator Scenario 16 & 17Static Eliminator
BVY-91-031, Forwards Vermont Yankee Nuclear Power Co Annual Financial Statements for 3-yr Period Ending 90123129 March 1991Forwards Vermont Yankee Nuclear Power Co Annual Financial Statements for 3-yr Period Ending 901231
BVY-91-049, Submits Corrective Actions Related to Unsatisfactory Performance of Licensed Operator Requalification Program,Per 910225 Exams.Root Cause Analysis Summary Encl30 April 1991Submits Corrective Actions Related to Unsatisfactory Performance of Licensed Operator Requalification Program,Per 910225 Exams.Root Cause Analysis Summary Encl
BVY-91-062, Forwards Suppl to Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters,1990,Including Annual Radiological Impact on Man for 199026 June 1991Forwards Suppl to Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters,1990,Including Annual Radiological Impact on Man for 1990
BVY-91-089, Forwards Updated Licensed Operator Exam Schedule,Per Generic Ltrs 91-12,90-07 & 89-032 October 1991Forwards Updated Licensed Operator Exam Schedule,Per Generic Ltrs 91-12,90-07 & 89-03
BVY-91-108, Responds to Weaknesses/Concerns Noted in Team Insp Rept 50-271/91-80 Re Proposed motor-operated Valve Program,Per Generic Ltr 89-10.Corrective action:motor-operated Valve Program Will Be Revised by 920601 to Address Generic Ltr25 October 1991Responds to Weaknesses/Concerns Noted in Team Insp Rept 50-271/91-80 Re Proposed motor-operated Valve Program,Per Generic Ltr 89-10.Corrective action:motor-operated Valve Program Will Be Revised by 920601 to Address Generic LtrAnchor Darling
Weak link
BVY-91-109, Responds to NRC Re Violations/Deviations Noted in Safety Insp Rept 50-271/91-23 on 910903-06.Corrective actions:corrected,computer-generator Manifests,Listing Fe-55 Sent to Lab & New Task Matrix Formed1 November 1991Responds to NRC Re Violations/Deviations Noted in Safety Insp Rept 50-271/91-23 on 910903-06.Corrective actions:corrected,computer-generator Manifests,Listing Fe-55 Sent to Lab & New Task Matrix Formed
BVY-91-113, Requests Approval of Proposed Procedures to Dispose,By Leaving in place,82 Mci of Total Activity,Principally Tritium,Contained in Fill Matl Located Under Existing Plant Structures & Bldgs,Per 10CFR20.302(a)18 November 1991Requests Approval of Proposed Procedures to Dispose,By Leaving in place,82 Mci of Total Activity,Principally Tritium,Contained in Fill Matl Located Under Existing Plant Structures & Bldgs,Per 10CFR20.302(a)Time of Discovery
Exemption Request
BVY-91-114, Forwards Rev 1 to VT Yankee Nuclear Power Station Cycle 15 Core Operating Limits Rept18 November 1991Forwards Rev 1 to VT Yankee Nuclear Power Station Cycle 15 Core Operating Limits Rept
BVY-91-117, Provides Addl Info Re Commitment to Perform Engineering Evaluation of Viable Hardware Alternatives to Turbine Bldg Roof Vents,Per Insp Rept 50-271/91-09.Vents Will Be Rerouted to Discharge Via Plant Stack27 November 1991Provides Addl Info Re Commitment to Perform Engineering Evaluation of Viable Hardware Alternatives to Turbine Bldg Roof Vents,Per Insp Rept 50-271/91-09.Vents Will Be Rerouted to Discharge Via Plant Stack
BVY-91-118, Requests Further NRC Review of Flaws Found in Feedwater Check Valves at Facility in Light of Recent Failure Analysis Conducted by BNL Under Contract to Nrc.Nrc Concurrence Requested That Replacement of Valve V27B Unnecessary19 December 1991Requests Further NRC Review of Flaws Found in Feedwater Check Valves at Facility in Light of Recent Failure Analysis Conducted by BNL Under Contract to Nrc.Nrc Concurrence Requested That Replacement of Valve V27B UnnecessaryHydrostatic
BVY-91-123, Forwards Response to Generic Ltr 88-20,Suppl 4, Individual Plant Exam of External Events (IPEEE) for Severe Accident Vulnerabilities, Including Methods & Approaches for Performing Exam19 December 1991Forwards Response to Generic Ltr 88-20,Suppl 4, Individual Plant Exam of External Events (IPEEE) for Severe Accident Vulnerabilities, Including Methods & Approaches for Performing ExamHigh winds
Internal Flooding
BVY-92-002, Requests Exemption from Diversity Requirements of 10CFR50.62 for Alternate Rod Injection Sys.Bwr Owners Group Quantitative Assessment of Scram Sys Reliability Showed Increased Costs of Providing Trip Units Unjustified17 January 1992Requests Exemption from Diversity Requirements of 10CFR50.62 for Alternate Rod Injection Sys.Bwr Owners Group Quantitative Assessment of Scram Sys Reliability Showed Increased Costs of Providing Trip Units UnjustifiedExemption Request
BVY-92-004, Responds to NRC Re Discrepancies Noted in Emergency Preparedness Exercise Insp Rept 50-271/91-26. Corrective Actions:Operating Crew Involved in Exercise Received Training Re Direction on Power/Level Control17 January 1992Responds to NRC Re Discrepancies Noted in Emergency Preparedness Exercise Insp Rept 50-271/91-26. Corrective Actions:Operating Crew Involved in Exercise Received Training Re Direction on Power/Level ControlTemporary Modification
BVY-92-007, Confirms That Util Has Completed Administrative Implementation Requirements to Utilize ERDS to Transmit Emergency Data.Procedures Have Been Modified & Mgt Controls Have Been Implemented to Assure Continuing Quality of Data29 January 1992Confirms That Util Has Completed Administrative Implementation Requirements to Utilize ERDS to Transmit Emergency Data.Procedures Have Been Modified & Mgt Controls Have Been Implemented to Assure Continuing Quality of Data
BVY-92-009, Forwards Supplemental Response to Insp Rept 50-271/91-80. Corrective Actions:Differential Pressure Testing of motor- Operated Valves,Which Represent 12% of Generic Ltr 89-10 Population,Will Be Performed31 January 1992Forwards Supplemental Response to Insp Rept 50-271/91-80. Corrective Actions:Differential Pressure Testing of motor- Operated Valves,Which Represent 12% of Generic Ltr 89-10 Population,Will Be Performed
BVY-92-011, Responds to NRC Re Violations Noted in Insp Repts 50-271/91-13 & 50-271/91-21.Corrective Actions:Engineering Evaluation & Supporting Safety Analysis Performed to Support Operation in Winter Mode of Operation6 February 1992Responds to NRC Re Violations Noted in Insp Repts 50-271/91-13 & 50-271/91-21.Corrective Actions:Engineering Evaluation & Supporting Safety Analysis Performed to Support Operation in Winter Mode of OperationTemporary Modification
BVY-92-026, Forwards Fitness for Duty Program Data for Jul-Dec 199127 February 1992Forwards Fitness for Duty Program Data for Jul-Dec 1991Fitness for Duty
BVY-92-040, Forwards Rev 0 to Vermont Yankee Nuclear Power Station Cycle 16 Core Operating Limits Rept & YAEC-1844, Vermont Yankee Cycle 16 Core Performance Analysis Rept31 March 1992Forwards Rev 0 to Vermont Yankee Nuclear Power Station Cycle 16 Core Operating Limits Rept & YAEC-1844, Vermont Yankee Cycle 16 Core Performance Analysis Rept
BVY-92-041, Forwards Response to NRC 920302 Request for Addl Info Re 911223 Proposed Change 165 to License DPR-28,changing Surveillance Requirements Resulting from Upgrade of mechanically-actuated Instrumentation W/Analog Trip Sys31 March 1992Forwards Response to NRC 920302 Request for Addl Info Re 911223 Proposed Change 165 to License DPR-28,changing Surveillance Requirements Resulting from Upgrade of mechanically-actuated Instrumentation W/Analog Trip Sys
BVY-92-044, Responds to NRC Re Violations Noted in Insp Rept 50-271/92-04.Corrective Actions:Alarm Response Sheet Revised to Remove Misleading Statements & Specifically State That HPCI Should Be Considered Inoperable Anytime Inverter Trips16 April 1992Responds to NRC Re Violations Noted in Insp Rept 50-271/92-04.Corrective Actions:Alarm Response Sheet Revised to Remove Misleading Statements & Specifically State That HPCI Should Be Considered Inoperable Anytime Inverter Trips
BVY-92-051, Forwards Status Rept of Efforts in Improving Effectiveness of Security Program Conducted During Oct 1991.Rept Withheld30 April 1992Forwards Status Rept of Efforts in Improving Effectiveness of Security Program Conducted During Oct 1991.Rept Withheld
BVY-92-055, Advises That Util Performed Rv Head Insp During Outage to Address Concerns Raised in GE SIL 539 & Discovered Possible Cracking in Cladding of RPV Head.No Evidence That Structural Integrity of RPV or Vessel Head Compromised.Evaluation Encl5 April 1992Advises That Util Performed Rv Head Insp During Outage to Address Concerns Raised in GE SIL 539 & Discovered Possible Cracking in Cladding of RPV Head.No Evidence That Structural Integrity of RPV or Vessel Head Compromised.Evaluation EnclWeld Overlay
BVY-92-068, Documents Request for Temporary Waiver of Compliance from TS LCO Requirements Re EDG Operability.Waiver of Compliance Will Allow One Addl Day to Repair Components & Thoroughly Test EDG Prior to Returning to Svc3 June 1992Documents Request for Temporary Waiver of Compliance from TS LCO Requirements Re EDG Operability.Waiver of Compliance Will Allow One Addl Day to Repair Components & Thoroughly Test EDG Prior to Returning to Svc
BVY-92-071, Responds to NRC Re Violations Noted in Insp Rept 50-271/92-80.Corrective Actions:Checklists for Tools & Matls Will Be Developed & Controlled Via Administrative Procedure22 June 1992Responds to NRC Re Violations Noted in Insp Rept 50-271/92-80.Corrective Actions:Checklists for Tools & Matls Will Be Developed & Controlled Via Administrative Procedure
BVY-92-072, Responds to NRC Re Violations Noted in Insp Rept 50-271/92-08 on 920413-17.Corrective Actions:Supervisor Counseled on Importance of Compliance W/All Applicable Procedures,Policies & Correct Method to Initiate Changes26 June 1992Responds to NRC Re Violations Noted in Insp Rept 50-271/92-08 on 920413-17.Corrective Actions:Supervisor Counseled on Importance of Compliance W/All Applicable Procedures,Policies & Correct Method to Initiate Changes
BVY-92-082, Forwards Response to Request for Addl Info & Revised Application Document Incorporating,As Appropriate Info Given in Response to Questions in Ref to Ltr Re Disposal of Slightly Contaminated Soil10 July 1992Forwards Response to Request for Addl Info & Revised Application Document Incorporating,As Appropriate Info Given in Response to Questions in Ref to Ltr Re Disposal of Slightly Contaminated Soil
BVY-92-084, Responds to NRC Request for Addl Info Re Rept Made by Vynp on 920625 of NRC-licensed Operator Who Tested Positive Following fitness-for-duty Test.Response Withheld (Ref 10CFR2.790)17 July 1992Responds to NRC Request for Addl Info Re Rept Made by Vynp on 920625 of NRC-licensed Operator Who Tested Positive Following fitness-for-duty Test.Response Withheld (Ref 10CFR2.790)
BVY-92-092, Responds to NRC Bulletin 92-001 Failure of Thermo-Lag 330 Fire Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Continuous Fire Watch for 3/4-inch Conduit Established24 July 1992Responds to NRC Bulletin 92-001 Failure of Thermo-Lag 330 Fire Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Continuous Fire Watch for 3/4-inch Conduit EstablishedFire Barrier
Continuous fire watch
Hourly Fire Watch
BVY-92-102, Forwards fitness-for-duty Program Data for Jan-June 199228 August 1992Forwards fitness-for-duty Program Data for Jan-June 1992Fitness for Duty
BVY-92-103, Forwards Revised Survey & Data Point Library Ref File, Containing Hardware,Communications,Data Point & Administrative Info,As Part of ERDS31 August 1992Forwards Revised Survey & Data Point Library Ref File, Containing Hardware,Communications,Data Point & Administrative Info,As Part of ERDSReactor Vessel Water Level
BVY-92-107, Submits Info Re Util Position on Leakage Detection,Per GL 88-01 & Suppl 1.Plant Procedures Modified by Incorporating Addl Leakage Monitoring,Per GL 88-01.Relocating 2 Gpm Requirement Into TS Not cost-effective Nor Justified21 September 1992Submits Info Re Util Position on Leakage Detection,Per GL 88-01 & Suppl 1.Plant Procedures Modified by Incorporating Addl Leakage Monitoring,Per GL 88-01.Relocating 2 Gpm Requirement Into TS Not cost-effective Nor JustifiedPacking leak
Backfit
BVY-92-108, Lists Changes to Svc List.Jg Weigand & J Pelletier May Be Deleted from List.Listed non-util Employees Should Also Be Deleted from Svc List18 September 1992Lists Changes to Svc List.Jg Weigand & J Pelletier May Be Deleted from List.Listed non-util Employees Should Also Be Deleted from Svc List
BVY-92-111, Submits Info Re Methodology/Plans to Address Suppl 4 to GL 88-20 Re IPE of External Events for Severe Accident Vulnerabilities.Internal Fires & Internal Floods Will Be Analyzed W/Level 1 Pra.Results Will Be Sent by 95063018 September 1992Submits Info Re Methodology/Plans to Address Suppl 4 to GL 88-20 Re IPE of External Events for Severe Accident Vulnerabilities.Internal Fires & Internal Floods Will Be Analyzed W/Level 1 Pra.Results Will Be Sent by 950630Safe Shutdown
High winds
Weak link
BVY-92-112, Responds to Suppl 1 to GL 87-02 Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors (USI A-46),consisting of Description of in-structure Response Spectra & Schematics of Reactor Bldg18 September 1992Responds to Suppl 1 to GL 87-02 Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors (USI A-46),consisting of Description of in-structure Response Spectra & Schematics of Reactor BldgSafe Shutdown Earthquake
Design basis earthquake
Earthquake
BVY-92-115, Responds to NRC Bulletin 92-001 Supplement 1 Failure of Thermo-Lag Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Temporary Fire Detection Installed24 September 1992Responds to NRC Bulletin 92-001 Supplement 1 Failure of Thermo-Lag Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Temporary Fire Detection InstalledSafe Shutdown
Fire Barrier
Continuous fire watch
Fire Watch
Hourly Fire Watch
BVY-92-116, Responds to NRC Re Potential Areas of Improvement Noted in Insp Rept 50-271/92-14 on 920629-0702.Corrective Actions:Emergency Plan Classification & Action Level Scheme (Procedure AP-3125) Will Be Revised by Jan 199325 September 1992Responds to NRC Re Potential Areas of Improvement Noted in Insp Rept 50-271/92-14 on 920629-0702.Corrective Actions:Emergency Plan Classification & Action Level Scheme (Procedure AP-3125) Will Be Revised by Jan 1993
BVY-92-117, Responds to GL 92-04, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs Pursuant to 10CFR50.54(f)28 September 1992Responds to GL 92-04, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs Pursuant to 10CFR50.54(f)Reactor Vessel Water Level
Post Accident Monitoring
BVY-92-119, Forwards Revised Response to Weaknesses Noted in Insp Rept 50-271/92-80 on 920224-28.Corrective Actions:Plan to Update Procedure Generation Package,Revise OEs & Other Plant Operating Procedures & Incoporate Updates to EOPs13 October 1992Forwards Revised Response to Weaknesses Noted in Insp Rept 50-271/92-80 on 920224-28.Corrective Actions:Plan to Update Procedure Generation Package,Revise OEs & Other Plant Operating Procedures & Incoporate Updates to EOPs
BVY-92-122, Forwards Updated Operator Licensing Schedule,Per Generic Ltr 92-0627 October 1992Forwards Updated Operator Licensing Schedule,Per Generic Ltr 92-06
BVY-92-123, Responds to Generic Ltr 88-01,position Concerning Leakage Detection of Formal Backfit Analysis Under 10CFR50.10927 October 1992Responds to Generic Ltr 88-01,position Concerning Leakage Detection of Formal Backfit Analysis Under 10CFR50.109Backfit
BVY-92-124, Responds to Violations Noted in Electrical Distribution Sys Functional Insp Rept 50-271/92-81 on 920706-0807.Corrective Actions:Util Will Evaluate Possible Enhancement of Molded Case Circuit Breaker Program30 October 1992Responds to Violations Noted in Electrical Distribution Sys Functional Insp Rept 50-271/92-81 on 920706-0807.Corrective Actions:Util Will Evaluate Possible Enhancement of Molded Case Circuit Breaker Program
BVY-92-128, Forwards Required Ref Matls for Senior Reactor Operator Upgrade Exams in Feb 1993.W/o Encl17 November 1992Forwards Required Ref Matls for Senior Reactor Operator Upgrade Exams in Feb 1993.W/o Encl
BVY-92-129, Responds to Initial SALP Rept 50-271/91-99 Covering 910317-920801,per 921029 Public Meeting.Improvements Made in Area of Security During Reporting Period Which Have Not Been Given Full Consideration in Rept18 November 1992Responds to Initial SALP Rept 50-271/91-99 Covering 910317-920801,per 921029 Public Meeting.Improvements Made in Area of Security During Reporting Period Which Have Not Been Given Full Consideration in ReptShutdown Margin
Systematic Assessment of Licensee Performance
BVY-92-130, Forwards Response to Initial SALP Rept 50-271/91-99 Covering 910317-920801,per 921029 Public Meeting in Vernon,Vt. Response Withheld20 November 1992Forwards Response to Initial SALP Rept 50-271/91-99 Covering 910317-920801,per 921029 Public Meeting in Vernon,Vt. Response WithheldSystematic Assessment of Licensee Performance
BVY-92-131, Responds to NRC Re fund-raising Event Held at Util Training Facility in Sept 1992.Util Failed to Inform Outside Organization of Util Policy Restrictions on Alcoholic Beverages24 November 1992Responds to NRC Re fund-raising Event Held at Util Training Facility in Sept 1992.Util Failed to Inform Outside Organization of Util Policy Restrictions on Alcoholic Beverages
BVY-92-132, Forwards Annual Cashflow Statements for Vermont Yankee & Each of Vermont Yankee'S Sponsor Companies for Year 199224 November 1992Forwards Annual Cashflow Statements for Vermont Yankee & Each of Vermont Yankee'S Sponsor Companies for Year 1992
BVY-92-136, Responds to NRC Re Unresolved Issues Noted in Edsfi Rept 50-271/92-81.Corrective Actions:Replacement of Degraded Grid Relays,W/Models W/Narrower Reset Tolerances, Under Review & Vehicle Barrier Protection Installed7 December 1992Responds to NRC Re Unresolved Issues Noted in Edsfi Rept 50-271/92-81.Corrective Actions:Replacement of Degraded Grid Relays,W/Models W/Narrower Reset Tolerances, Under Review & Vehicle Barrier Protection Installed
BVY-92-138, Responds to NRC 921113 Re Violation Noted in Resident Safety Insp Rept 50-271/92-21 on 920920-1024.Corrective Actions: EPRI Good Bolting Practices,Np 5067 Adopted as Guidance for Bolting Applications9 December 1992Responds to NRC 921113 Re Violation Noted in Resident Safety Insp Rept 50-271/92-21 on 920920-1024.Corrective Actions: EPRI Good Bolting Practices,Np 5067 Adopted as Guidance for Bolting Applications