LR-N970290, Responds to NRC Re Violations Noted in Insp Rept 50-354/97-01.Corrective Actions:Resolved Equipment Operability Concerns Re Scaffolding Installed in a & B RHR Pump & Inspected Scaffolding in SLC Pump Room | 13 May 1997 | Responds to NRC Re Violations Noted in Insp Rept 50-354/97-01.Corrective Actions:Resolved Equipment Operability Concerns Re Scaffolding Installed in a & B RHR Pump & Inspected Scaffolding in SLC Pump Room | High Radiation Area Scaffolding |
LR-N970307, Forwards Comments on Draft NUREG-1560 Individual Plant Exam Program:Perspectives on Reactor Safety & Plant Performance | 9 May 1997 | Forwards Comments on Draft NUREG-1560 Individual Plant Exam Program:Perspectives on Reactor Safety & Plant Performance | |
LR-N970324, Provides Revised marked-up Pages to Address NRC Reviewer Comments | 30 May 1997 | Provides Revised marked-up Pages to Address NRC Reviewer Comments | |
LR-N970332, Provides Insp/Evaluation/Repairs Plans for Core Shroud IAW Commitments in 940824 & s.Suppl Response to GL 94-03, Core Shroud Insp,Evaluation & Repair Plans, Encl | 9 June 1997 | Provides Insp/Evaluation/Repairs Plans for Core Shroud IAW Commitments in 940824 & s.Suppl Response to GL 94-03, Core Shroud Insp,Evaluation & Repair Plans, Encl | |
LR-N970368, Responds to NRC Re Violations Noted in Insp Rept 50-354/97-02.Corrective Actions:Removed Equipment Operator Involved in Violation from Auxiliary Bldg Watch Qualification List | 20 June 1997 | Responds to NRC Re Violations Noted in Insp Rept 50-354/97-02.Corrective Actions:Removed Equipment Operator Involved in Violation from Auxiliary Bldg Watch Qualification List | |
LR-N970372, Requests Approval of Encl Relief Request RR-C2 to Use ASME Code Case N-498-1 W/Reduced Hold Time of 20 Minutes for Pressure Testing Plant HPCI Pump Piping,Hpci Turbine Steam Supply & Exhaust Lines & Associated Drains & Vents | 15 July 1997 | Requests Approval of Encl Relief Request RR-C2 to Use ASME Code Case N-498-1 W/Reduced Hold Time of 20 Minutes for Pressure Testing Plant HPCI Pump Piping,Hpci Turbine Steam Supply & Exhaust Lines & Associated Drains & Vents | Hydrostatic VT-2 |
LR-N970384, Forwards Monthly Operating Rept for May 1997 for Hope Creek Generating Station.Summary of Changes,Tests & Experiments Implemented During Apr 1997,also Encl | 13 June 1997 | Forwards Monthly Operating Rept for May 1997 for Hope Creek Generating Station.Summary of Changes,Tests & Experiments Implemented During Apr 1997,also Encl | |
LR-N970415, Forwards Response to RAI Re Proposed Resolution Approach to NRC Bulletin 96-003, Potential Plugging of ECCS Suction Strainers by Debris, Per NRC 970617 e-mail & During 970619 Telcon | 18 July 1997 | Forwards Response to RAI Re Proposed Resolution Approach to NRC Bulletin 96-003, Potential Plugging of ECCS Suction Strainers by Debris, Per NRC 970617 e-mail & During 970619 Telcon | Coatings |
LR-N970427, Response to NRC Re Violations Noted in Insp Rept 50-354/97-03.Corrective Actions:Severe Disciplinary Actions Have Been Implemented for Personnel Involved in Events Re Procedure Use & Adherence Expectations | 28 July 1997 | Response to NRC Re Violations Noted in Insp Rept 50-354/97-03.Corrective Actions:Severe Disciplinary Actions Have Been Implemented for Personnel Involved in Events Re Procedure Use & Adherence Expectations | Condition Adverse to Quality |
LR-N970451, Forwards MOR for June 1997 & Revised MOR for May 1997 for Hcgs.Summary of Changes,Tests & Experiments Implemented During May 1997 Encl | 15 July 1997 | Forwards MOR for June 1997 & Revised MOR for May 1997 for Hcgs.Summary of Changes,Tests & Experiments Implemented During May 1997 Encl | |
LR-N970475, Suppl Response to Violations Noted in Insp Rept 50-354/96-09.Corrective Actions:Edg/Fss Interaction Will Be Permanently Removed | 21 October 1997 | Suppl Response to Violations Noted in Insp Rept 50-354/96-09.Corrective Actions:Edg/Fss Interaction Will Be Permanently Removed | Safe Shutdown Temporary Modification |
LR-N970482, Requests That Last Page of Attachment 3 of Ltr LR-N970217 Dtd 970619,which Was Omitted,Be Inserted in Copy | 30 July 1997 | Requests That Last Page of Attachment 3 of Ltr LR-N970217 Dtd 970619,which Was Omitted,Be Inserted in Copy | |
LR-N970491, Provides Replacement Page of Attachment 3 to Ltr LR-N970217 Dtd 970619,re RSCS Elimination & RWM Low Power Setpoint Reduction.Page Was Inadvertently Omitted | 31 July 1997 | Provides Replacement Page of Attachment 3 to Ltr LR-N970217 Dtd 970619,re RSCS Elimination & RWM Low Power Setpoint Reduction.Page Was Inadvertently Omitted | |
LR-N970537, Forwards Revs 1 & 2 of HCGS Cycle 7/Reload 6 COLR, NFS-0145, IAW TS 6.9.1.9 | 26 August 1997 | Forwards Revs 1 & 2 of HCGS Cycle 7/Reload 6 COLR, NFS-0145, IAW TS 6.9.1.9 | |
LR-N970558, Requests Approval of Attached Relief Request RR-A4 to First Ten Yr ISI Program.Details & Justification for Relief Explained Further in Attached Relief Request | 29 August 1997 | Requests Approval of Attached Relief Request RR-A4 to First Ten Yr ISI Program.Details & Justification for Relief Explained Further in Attached Relief Request | Hydrostatic |
LR-N970565, Requests That DM Wheeler Take BWR Gfes of Operator Licensing Exam to Be Administered on 971008.Candidate Is Enrolled in HCGS SRO & RO Initial License Training Program | 9 September 1997 | Requests That DM Wheeler Take BWR Gfes of Operator Licensing Exam to Be Administered on 971008.Candidate Is Enrolled in HCGS SRO & RO Initial License Training Program | Generic Fundamentals Examination |
LR-N970570, Forwards Cycle 4 Startup Physics Testing, Per Requirements of TS Section 6.9, Reporting Requirements. Description of Design Changes of GE9B Product Line,Also Encl | 7 October 1997 | Forwards Cycle 4 Startup Physics Testing, Per Requirements of TS Section 6.9, Reporting Requirements. Description of Design Changes of GE9B Product Line,Also Encl | |
LR-N970572, Responds to NRC Re Violations Noted in Insp Rept 50-354/97-04.Corrective Actions:Developed Case Study for Tabletop Discussions W/Operating Crews | 9 September 1997 | Responds to NRC Re Violations Noted in Insp Rept 50-354/97-04.Corrective Actions:Developed Case Study for Tabletop Discussions W/Operating Crews | Temporary Modification |
LR-N970607, Forwards Response to 970911 & 15 Telcon RAI Re Relief Request for Augmented Reactor Vessel Insp.Procedure Controls Operator Training to Prevent over-pressurization of RPV, Summarized | 16 September 1997 | Forwards Response to 970911 & 15 Telcon RAI Re Relief Request for Augmented Reactor Vessel Insp.Procedure Controls Operator Training to Prevent over-pressurization of RPV, Summarized | Hydrostatic |
LR-N970640, Requests One Cycle Deferral for Completing Implementation of Modifications Described in Previous Ltrs Re NRC Bulletin 96-03 | 26 September 1997 | Requests One Cycle Deferral for Completing Implementation of Modifications Described in Previous Ltrs Re NRC Bulletin 96-03 | Coatings Foreign Material Exclusion |
LR-N970648, Clarifies Specific Regulatory Basis & Proposed Alternative Re Request for Relief from Performing RPV Exam Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1983 Edition & Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) | 1 October 1997 | Clarifies Specific Regulatory Basis & Proposed Alternative Re Request for Relief from Performing RPV Exam Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1983 Edition & Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) | |
LR-N970667, Requests Approval of Encl Repair Plan for Nozzle to Safe End Weld Associated W/Plant a Core Spray Loop.Action Necessary to Allow Repair of Through Wall Leak Discovered on Weld N5B on 970919 | 9 October 1997 | Requests Approval of Encl Repair Plan for Nozzle to Safe End Weld Associated W/Plant a Core Spray Loop.Action Necessary to Allow Repair of Through Wall Leak Discovered on Weld N5B on 970919 | Time of Discovery Weld Overlay Liquid penetrant Through Wall Leak |
LR-N970675, Forwards Monthly Operating Rept for Hope Creek Generating Station for Sept 1997.Also Includes Summary of Changes,Tests & Experiments Implemented During Aug 1997.Refueling Info Also Provided | 15 October 1997 | Forwards Monthly Operating Rept for Hope Creek Generating Station for Sept 1997.Also Includes Summary of Changes,Tests & Experiments Implemented During Aug 1997.Refueling Info Also Provided | |
LR-N970686, Forwards Supplemental Info Which Supports Request for Approval of Repair Plan for Core Spray Nozzle Weld through- Wall Leakage Identified on 970919 | 15 October 1997 | Forwards Supplemental Info Which Supports Request for Approval of Repair Plan for Core Spray Nozzle Weld through- Wall Leakage Identified on 970919 | Through-Wall Leak |
LR-N970706, Forwards Response to Violations Noted in Insp Rept 50-354/97-01.Corrective Actions:On 951222,valves in A/C cross-tie Line Locked Closed,Restoring Compliance W/Ts 4.5.1.a.B | 18 November 1997 | Forwards Response to Violations Noted in Insp Rept 50-354/97-01.Corrective Actions:On 951222,valves in A/C cross-tie Line Locked Closed,Restoring Compliance W/Ts 4.5.1.a.B | |
LR-N970709, Provides Notification of Change to Util Plan for Repairing Core Spray Nozzle Weld N5B.Description of Commitment Change Made by Util,Encl | 12 November 1997 | Provides Notification of Change to Util Plan for Repairing Core Spray Nozzle Weld N5B.Description of Commitment Change Made by Util,Encl | Weld Overlay Through-Wall Leak |
LR-N970713, Submits Corrected Page 6 of 6 to Response to NOV Noted During Insp Rept 50-354/96-09 Re Edg/Fire Suppression Sys Interaction.Implementation of Temporary Mod Was Changed to Jan 1997 from Jan 1996 | 3 November 1997 | Submits Corrected Page 6 of 6 to Response to NOV Noted During Insp Rept 50-354/96-09 Re Edg/Fire Suppression Sys Interaction.Implementation of Temporary Mod Was Changed to Jan 1997 from Jan 1996 | Temporary Modification |
LR-N970722, Submits Results of Hope Creek Core Shroud Insp Completed on 971011,IAW Reporting Requirement 3 of GL 94-03, IGSCC of Core Shrouds in Bwrs | 10 November 1997 | Submits Results of Hope Creek Core Shroud Insp Completed on 971011,IAW Reporting Requirement 3 of GL 94-03, IGSCC of Core Shrouds in Bwrs | |
LR-N970732, Forwards MOR for Oct 1997 for HCGS & Revised MOR Sept 1997 | 17 November 1997 | Forwards MOR for Oct 1997 for HCGS & Revised MOR Sept 1997 | |
LR-N970746, Informs That Util Is Revising Commitment to Determine Total Sludge Loading from Current Refueling Outage to Next Refueling Outage,Currently Scheduled to Begin in mid-Feb 1999,re Ieb 96-003, Potential Plugging of ECC Suction.. | 18 November 1997 | Informs That Util Is Revising Commitment to Determine Total Sludge Loading from Current Refueling Outage to Next Refueling Outage,Currently Scheduled to Begin in mid-Feb 1999,re Ieb 96-003, Potential Plugging of ECC Suction.. | |
LR-N970762, Provides Notification Re Change to Util Plan for Repairing Core Spray Nozzle Weld N5B.Commitment Change in Addition to Previously Submitted Change,Encl | 21 November 1997 | Provides Notification Re Change to Util Plan for Repairing Core Spray Nozzle Weld N5B.Commitment Change in Addition to Previously Submitted Change,Encl | Time of Discovery Weld Overlay Hydrostatic |
LR-N970798, Forwards MOR for Nov 1997 for HCGS & Revised MOR for Oct 1997 | 15 December 1997 | Forwards MOR for Nov 1997 for HCGS & Revised MOR for Oct 1997 | |
LR-N970808, Forwards HCGS IST Program for Second Interval Per 10CFR50.55a(f)(4)(ii) & 10CFR50.55a(f)(5)(i).Second Interval Is Being Reduced to Nine Years W/End Date of Dec 20,2006 & Requirements Will Be Phased in by 960331 IAW NUREG-1482 | 22 December 1997 | Forwards HCGS IST Program for Second Interval Per 10CFR50.55a(f)(4)(ii) & 10CFR50.55a(f)(5)(i).Second Interval Is Being Reduced to Nine Years W/End Date of Dec 20,2006 & Requirements Will Be Phased in by 960331 IAW NUREG-1482 | |
LR-N970814, Forwards Proposed Rev 11 to Security Plan & Proposed Rev 4 to Training & Qualifications Plan for Plants.Plan Withheld | 21 January 1998 | Forwards Proposed Rev 11 to Security Plan & Proposed Rev 4 to Training & Qualifications Plan for Plants.Plan Withheld | |
LR-N972466, Provides Info to Supplement Justification Made in Which Requested Rev to Plant UHS Temperature & River Water Level Limits Contained in Encl TS | 25 August 1997 | Provides Info to Supplement Justification Made in Which Requested Rev to Plant UHS Temperature & River Water Level Limits Contained in Encl TS | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake |
LR-N980023, Forwards MOR for Hope Creek Nuclear Generating Station,Unit 1 for Dec 1997 & Summary of Changes,Tests & Experiments During Nov 1997 | 15 January 1998 | Forwards MOR for Hope Creek Nuclear Generating Station,Unit 1 for Dec 1997 & Summary of Changes,Tests & Experiments During Nov 1997 | |
LR-N980027, Forwards Monthly Operating Rept for Jan 1998 for Hope Creek Generation Station,Unit 1.Summary of Changes,Tests & Experiments Implemented During Dec 1997 & Jan 1998,encl,per Requirements of 10CFR50.59(b) | 15 February 1998 | Forwards Monthly Operating Rept for Jan 1998 for Hope Creek Generation Station,Unit 1.Summary of Changes,Tests & Experiments Implemented During Dec 1997 & Jan 1998,encl,per Requirements of 10CFR50.59(b) | |
LR-N980085, Requests Approval for Relief Requests Associated W/Examinations Determined to Be Impractical During First Ten Year ISI Interval,Per 10CFR50.55a(g)(5) | 3 March 1998 | Requests Approval for Relief Requests Associated W/Examinations Determined to Be Impractical During First Ten Year ISI Interval,Per 10CFR50.55a(g)(5) | |
LR-N980122, Informs That Pse&G Has Change Commitment Made in Re Second Phase of Maint Intervention.New Commitment Made Listed | 31 March 1998 | Informs That Pse&G Has Change Commitment Made in Re Second Phase of Maint Intervention.New Commitment Made Listed | |
LR-N980152, Responds to NRC Re Violations Noted in Insp Repts 50-354/97-09,50-354/97-80 & 50-354/97-81.Corrective Actions: Mgt Reinforced Expectations W/Qa Organization & Plant Licensed Personnel Re Conservative Decision Making | 20 April 1998 | Responds to NRC Re Violations Noted in Insp Repts 50-354/97-09,50-354/97-80 & 50-354/97-81.Corrective Actions: Mgt Reinforced Expectations W/Qa Organization & Plant Licensed Personnel Re Conservative Decision Making | Safe Shutdown Shutdown Margin Maintenance Rule Program |
LR-N980184, Submits 1997 Summary of Revised Regulatory Commitments | 1 May 1998 | Submits 1997 Summary of Revised Regulatory Commitments | Emergency Lighting |
LR-N980228, Forwards Hope Creek Generating Station ISI Program for Second Interval,Per Requirements of 10CFR50.55a(g)(4) & 10CFR50.55a(g)(5)(i) | 11 May 1998 | Forwards Hope Creek Generating Station ISI Program for Second Interval,Per Requirements of 10CFR50.55a(g)(4) & 10CFR50.55a(g)(5)(i) | |
LR-N980229, Provides Notification Re Change to Commitment That Made in Corrective Action in Response to NOV 50-354/94-19. Clarification to Commitment Also Described in Attachment | 18 May 1998 | Provides Notification Re Change to Commitment That Made in Corrective Action in Response to NOV 50-354/94-19. Clarification to Commitment Also Described in Attachment | Probabilistic Risk Assessment |
LR-N980231, Forwards Relief Requests Associated W/Changes Made to Repair Plan for Core Spray Nozzle Weld N5B.Info Requested by NRC in 980415 Telcon Included in Encl as Well | 28 July 1998 | Forwards Relief Requests Associated W/Changes Made to Repair Plan for Core Spray Nozzle Weld N5B.Info Requested by NRC in 980415 Telcon Included in Encl as Well | Time of Discovery Weld Overlay Hydrostatic Liquid penetrant Through-Wall Leak |
LR-N980303, Forwards Rev 9 to Plant Ufsar,Iaw Requirements of 10CFR50.71(e).Rev Contains Text,Table & Figure Changes | 12 June 1998 | Forwards Rev 9 to Plant Ufsar,Iaw Requirements of 10CFR50.71(e).Rev Contains Text,Table & Figure Changes | |
LR-N980305, Forwards Proposed Rev 5 to Salem & Hope Creek Generating Stations,Security Contingency Plan.Summary of Proposed Changes to Plan Included,Per 10CFR50.4(b)(4).Encl Withheld | 12 June 1998 | Forwards Proposed Rev 5 to Salem & Hope Creek Generating Stations,Security Contingency Plan.Summary of Proposed Changes to Plan Included,Per 10CFR50.4(b)(4).Encl Withheld | |
LR-N980313, Provides Updated Info for Issues Discussed in NRC 961104, 970520 & 0718 SERs of Licensee Response to NRC Bulletin 96-003, Potential Plugging of ECCS Suction Strainers by Debris | 25 June 1998 | Provides Updated Info for Issues Discussed in NRC 961104, 970520 & 0718 SERs of Licensee Response to NRC Bulletin 96-003, Potential Plugging of ECCS Suction Strainers by Debris | Coatings Foreign Material Exclusion |
LR-N980315, Responds to NRC 980504 RAI Re GL 92-01,Rev 1,Suppl 1.Util Has Reviewed Info in Industry Rept Applicable to Hope Creek & Concluded That Relevant Chemistry Values Have Not Changed & Previously Submitted Evaluations Remain Valid | 27 July 1998 | Responds to NRC 980504 RAI Re GL 92-01,Rev 1,Suppl 1.Util Has Reviewed Info in Industry Rept Applicable to Hope Creek & Concluded That Relevant Chemistry Values Have Not Changed & Previously Submitted Evaluations Remain Valid | |
LR-N980316, Responds to NRC Re Violations Noted in Insp Rept 50-354/98-05.Corrective Actions:Interaction Between Nuclear Fuels,Sys Engineering & Outage Mgt Has Been Proceduralized & Decay Heat Removal Method Evaluated IAW 10CFR50.59 | 6 July 1998 | Responds to NRC Re Violations Noted in Insp Rept 50-354/98-05.Corrective Actions:Interaction Between Nuclear Fuels,Sys Engineering & Outage Mgt Has Been Proceduralized & Decay Heat Removal Method Evaluated IAW 10CFR50.59 | |
LR-N980319, Forwards non-proprietary Rev 0 to 24A5392AB & Proprietary Rev 1 to 24A5392AA, Lattice Dependent MAPLHGR Rept for Hope Creek Generating Station Reload 7 Cycle 8, Reflecting NRC Conclusions Re Withholding.Proprietary Encl Withheld | 25 June 1998 | Forwards non-proprietary Rev 0 to 24A5392AB & Proprietary Rev 1 to 24A5392AA, Lattice Dependent MAPLHGR Rept for Hope Creek Generating Station Reload 7 Cycle 8, Reflecting NRC Conclusions Re Withholding.Proprietary Encl Withheld | |