Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
BVY 03-080, Vermont Yankee Hearing - Entergy Exhibit 5, Proposed Technical Specification Change No. 263, Extended Power Uprate Justification for Exception to Large Transient Testing13 September 2006Vermont Yankee Hearing - Entergy Exhibit 5, Proposed Technical Specification Change No. 263, Extended Power Uprate Justification for Exception to Large Transient TestingPower Uprate
BVY 04-008, Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 17, Letter Bvy 04-008, Dated January 31, 200431 January 2004Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 17, Letter Bvy 04-008, Dated January 31, 2004Safe Shutdown
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Mission time
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
Coatings
Zebra Mussel
Incorporated by reference
Finite Element Analysis
High Energy Line Break
Flow Accelerated Corrosion
Feedwater Heater
Intergranular Stress Corrosion Cracking
Large early release frequency
MELLLA
Stress corrosion cracking
Code Reconciliation
Veliger
License Renewal
Maintenance Rule Program
Power-Operated Valves
Fuel cladding
Fire Protection Program
Flow Induced Vibration
Power Uprate
Failure to Scram
Affidavit
Simmer margin
BVY 04-058, 2008-08/12-Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-04-VY Attachment 2 to Supplement 8 to VY EPU Application12 August 20082008-08/12-Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-04-VY Attachment 2 to Supplement 8 to VY EPU ApplicationSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Non-Destructive Examination
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Finite Element Analysis
High Energy Line Break
Design basis earthquake
Flow Accelerated Corrosion
Feedwater Heater
Intergranular Stress Corrosion Cracking
License Renewal
Earthquake
Hardened vent
Turbine Missile
Flow Induced Vibration
GOTHIC
Power Uprate
Affidavit
Overspeed trip
Loss of condenser vacuum
Water hammer
BVY 05-017, Vermont Yankee Hearing - Staff Exhibit 9, Letter from Jay K. Thayer to NRC Document Control Desk Transmitting Supplement No. 23 to Entergy'S Extended Power Uprate Application - Response to Request for Additional Information24 February 2005Vermont Yankee Hearing - Staff Exhibit 9, Letter from Jay K. Thayer to NRC Document Control Desk Transmitting Supplement No. 23 to Entergy'S Extended Power Uprate Application - Response to Request for Additional InformationReactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Abnormal operational transient
Feedwater Heater
Flow Induced Vibration
Power Uprate
Overspeed trip
BVY 05-046, Vermont Yankee Hearing - Staff Exhibit 10, Letter from Jay K. Thayer to Document Control Desk Transmitting Supplement No. 28 to Entergy'S Extended Power Uprate Application - Response to Request for Additional Information22 April 2005Vermont Yankee Hearing - Staff Exhibit 10, Letter from Jay K. Thayer to Document Control Desk Transmitting Supplement No. 28 to Entergy'S Extended Power Uprate Application - Response to Request for Additional InformationReactor Vessel Water Level
Anticipated operational occurrence
Power Uprate
BVY 05-084, Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-05-VY, Attachment 6 to Supplement 33 to VY EPU Application12 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-05-VY, Attachment 6 to Supplement 33 to VY EPU ApplicationPower Uprate
BVY 08-002, Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-28-VY, VY LRA Amendment 3430 January 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-28-VY, VY LRA Amendment 34Aging Management
BVY 08-008, Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-09-VY, VY LRA Amendment 355 February 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-09-VY, VY LRA Amendment 35Nondestructive Examination
Aging Management
License Renewal
EVT-1
Power Uprate
BVY 08-012, 2008/02/21-Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 23, Vermont Yankee License Renewal Application, Amendment 36 (Dated February 21, 2008)21 February 20082008/02/21-Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 23, Vermont Yankee License Renewal Application, Amendment 36 (Dated February 21, 2008)Aging Management
Earthquake
IR 05000271/200400326 July 2004Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_58, NRC, Vermont Yankee Power Station - NRC Integrated Inspection Report 05000271/200403 (July 26, 2004)Safe Shutdown
High Radiation Area
Non-Destructive Examination
Weld Overlay
Internal Flooding
Temporary Modification
Significance Determination Process
Feedwater Heater
Operability Determination
Fuel cladding
Power Uprate
IR 05000271/201101122 December 2011Official Exhibit - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities.License Renewal
IR 05000271/201200820 April 2012Official Exhibit - NYS000462-00-BD01 - IR 05000271-12-008; 1/9 - 13, 1/23 - 27, and 3/19 - 20/2012; Vermont Yankee Nuclear Power Station; Post Approval Site Inspection for License Renewal 1P71003.Safe Shutdown
Fire Barrier
Coatings
Aging Management
License Renewal
EVT-1
IR 05000461/200201024 January 2003Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-UW_04, NRC, Clinton Power Station NRC Inspection Report 50-461/02-10(DRS) (January 24, 2003)Commercial Grade Dedication
Temporary Modification
Significance Determination Process
Flow Accelerated Corrosion
Feedwater Heater
Commercial Grade
Information Notice 2002-26, Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH 56, NRC Information Notice 2002-26, Supplement 2: Additional Flow-Induced Vibration Failures After a Recent Power Uprate9 January 2004Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_56, NRC Information Notice 2002-26, Supplement 2: Additional Flow-Induced Vibration Failures After a Recent Power UprateSafe Shutdown
Power Uprate
ML06143047731 December 2003Staff Exhibit a to the NRC Staff'S Initial Statement of Position Concerning NEC Contention 3 - Review Standard for Extended Power UpratesPower Uprate
ML06143047831 December 2002Staff Exhibit B to the NRC Staff'S Initial Statement of Position Concerning NEC Contention 3 - Standard Review PlanSafe Shutdown
Stroke time
Anticipated operational occurrence
Power Uprate
Stretch Power Uprate
Measurement Uncertainty Recapture
Overspeed trip
ML06143047931 March 2003Staff Exhibit C to the NRC Staff'S Initial Statement of Position Concerning NEC Contention 3 - Letter from William H. Ruland to James F. Klapproth Review of GE Nuclear Energy Licensing Topical Report, NEDC-33004P.Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Probabilistic Risk Assessment
High Energy Line Break
Flow Accelerated Corrosion
Large early release frequency
MELLLA
Stress corrosion cracking
Flow Induced Vibration
Power Uprate
ML06263046913 September 2006Vermont Yankee Hearing - Entergy Exhibit 1, Resume of Craig Joseph Nichols
ML06263047031 May 2006Vermont Yankee Hearing - Entergy Exhibit 2, Resume of Jose L. Casillas
ML06263047313 September 2006Vermont Yankee Hearing - Entergy Exhibit 3, CP&L Updated FSAR, Rev. 18A: Table 1-3; Vermont Yankee Updated FSAR, Rev. 17, Tables 1.7.1, 1.7.2, 1.7.3, 1.7.4, 1.7.5 and 1.7.6Earthquake
ML06263047431 December 2002Vermont Yankee Hearing - Entergy Exhibit 4, NUREG-0800, Standard Review Plan, Draft, Rev 0, Chapter 14.2.1, Generic Guidelines for Extended Power Uprate Testing ProgramsSafe Shutdown
Anticipated operational occurrence
Power Uprate
Stretch Power Uprate
Measurement Uncertainty Recapture
Overspeed trip
ML06263047813 September 2006Vermont Yankee Hearing - Entergy Exhibit 6, Attachment to Entergy Letter Bvy 03-98 - Proposed Technical Specification Change No. 263, Supplement No. 3, Extended Power Uprate - Updated Information - Justification for Exception.Stroke time
Anticipated operational occurrence
Abnormal operational transient
Power Uprate
ML06263047913 September 2006Vermont Yankee Hearing - Entergy Exhibit 7, Final Safety Evaluation Report, Pp. 267 - 271Anticipated operational occurrence
ML06263048131 December 2005Vermont Yankee Hearing - Entergy Exhibit 8, Gnf, Supplemental Reload Licensing Report for Vermont Yankee, Reload 24 Cycle 25 (with Extended Power Uprate), Report No. 0000-0035-6443-SRLR (Rev. 0)MELLLA
ML0626401206 June 1991Vermont Yankee Hearing - Entergy Exhibit 18, LER 91-009-00, Vermont Yankee, Reactor Scram Due to Loss of Normal Off-site Power (LNP) Caused by Inadequate Procedure Guideline
ML06264013011 July 1991Vermont Yankee Hearing - Entergy Exhibit 19, LER 1991-014-00, Vermont Yankee, Reactor Scram Due to Loss of 345KV Switchyard Caused by Defective Off-Site Carrier EquipmentOvertravel
ML0626401924 January 2006Vermont Yankee Hearing - Entergy Exhibit 22, Letter from Graham Wallis to Chairman Diaz Re Vermont Yankee Extended Power UprateProbabilistic Risk Assessment
Minimum Critical Power Ratio
Large early release frequency
Fuel cladding
ML06264019714 June 2006Vermont Yankee Hearing - Entergy Exhibit 23, Exhibit 1 to Rebuttal Testimony of Craig J. Nichols and Jose L. Casillas on NEC Contention 3 - Large Transient Testing, Summary of Odyn Model Reports
ML06264020114 June 2006Vermont Yankee Hearing - Entergy Exhibit 24, Exhibit 2 to Rebuttal Testimony of Craig J. Nichols and Jose L. Casillas on NEC Contention 3 - Large Transient Testing, Summary of Odyn Studies Reports
ML06264023012 April 1991Vermont Yankee Hearing - Entergy Exhibit 17, LER 1991-005-00, Vermont Yankee, Reactor Scram Due to Mechanical Failure of 345KV Switchyard Bus Caused by Broken High Voltage Insulator Stack
ML06264025119 September 2006Vermont Yankee Hearing - Entergy'S Exhibit List
ML06264027213 September 2006Vermont Yankee Hearing - Entergy Exhibit 38, Chart at Page 7 of Prefiled Testimony
ML06264027713 September 2006Vermont Yankee Hearing - Entergy Exhibit 39, Table 1: VY Equipment Modifications Implemented for EPU Attached to Prefiled TestimonyLiquid penetrant
Overspeed trip
ML06264029231 July 2003Vermont Yankee Hearing - Entergy Exhibit 25, GE Licensing Topical Report - Constant Pressure Power Uprate, Report No. NEDO-33004P-A, Rev. 4 (Non-Proprietary Version)Safe Shutdown
Unanalyzed Condition
High winds
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Anticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
High Energy Line Break
Flow Accelerated Corrosion
Feedwater Heater
Intergranular Stress Corrosion Cracking
Large early release frequency
MELLLA
Stress corrosion cracking
Exemption Request
Turbine Missile
Fuel cladding
Fire Protection Program
Flow Induced Vibration
Power Uprate
Stretch Power Uprate
Affidavit
Overspeed trip
Simmer margin
ML06264033219 September 2006Vermont Yankee Hearing - Entergy'S Proprietary Exhibit ListPower Uprate
ML06264034931 August 1986Vermont Yankee Hearing - Entergy Exhibit 27, GE Topical Report, Qualification of the One-Dimensional Core Transient Model for Boiling Water Reactors, Report No. NEDO-24154-A, Vol. 2Reactor Vessel Water Level
Anticipated operational occurrence
Feedwater Controller Failure
Loss of condenser vacuum
ML06264041331 December 2005Vermont Yankee Hearing - Entergy Exhibit 28, Global Nuclear Fuel, Supplemental Reload Licensing Report for Vermont Yankee, Reload 24 Cycle 25 (with Extended Power Uprate), Report No. 0000-0035-6443-SRLR (Rev. 0)Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
Power Uprate
ML06265022331 August 1978Vermont Yankee Hearing - Staff Exhibit 4, Regulatory Guide 1.68, Initial Test Programs for Water-Cooled Nuclear Power Plants, Revision 2Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Internal Flooding
Hydrostatic
Emergency Lighting
Feedwater Heater
Overspeed trip
Water hammer
ML06265022431 December 2003Vermont Yankee Hearing - Staff Exhibit 5, NRR Review Standard for Extended Power Uprates, RS-001, Rev. 1Power Uprate
ML0626502291 August 2005Vermont Yankee Hearing - Staff Exhibit 11, Letter from Robert J. Wanczyk to Document Control Desk Transmitting Supplement No. 30 to Entergy'S Extended Power Uprate Application - Response to Request for Additional InformationStroke time
Anticipated operational occurrence
Minimum Critical Power Ratio
ML0626502305 November 1985Vermont Yankee Hearing - Staff Exhibit 17, Letter from Cecil O. Thomas to J. S. Charnley Re Acceptance for Referencing of Licensing Topical Report NEDE-24011-P-A Rev. 6 Amendment 11
ML06265023222 March 1986Vermont Yankee Hearing - Staff Exhibit 18, Letter from Gus C. Lainas to J. S. Charnley Re Acceptance for Referencing of Licensing Topical Report NEDE-24011-P-A, GE Generic Licensing Reload Report, Supplement to Amendment 11Fuel cladding
ML06265023318 May 2001Vermont Yankee Hearing - Staff Exhibit 19, Letter from R. M. Krich to NRC Re Additional Testing Information Supporting the License Amendment Request to Permit Uprated Power Operation at Dresden and Quad Cities, RS-01-14Stroke time
Probabilistic Risk Assessment
Feedwater Heater
Power Uprate
Affidavit
ML06265023513 September 2006Vermont Yankee Hearing - Staff Exhibit 20, Safety Evaluation by NRR Related to Amendment No. 191 to Facility Operating License DPR-19 and Amendment No. 185 to Facility Operating License DPR-25, Dresden Units 1 and 2Ultimate heat sink
Probabilistic Risk Assessment
Large early release frequency
Power-Operated Valves
Fire Protection Program
ML06265032419 September 2006Vermont Yankee Hearing - Staff Exhibit 2, Safety Evaluation by NRR Related to Amendment No. 229 to Facility Operarting License DPR-28 (non-proprietary Version)Hot Short
Safe Shutdown
High winds
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Non-Destructive Examination
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Nondestructive Examination
Channel-control blade interference
High Energy Line Break
Significance Determination Process
Feedwater Heater
Intergranular Stress Corrosion Cracking
Feedwater Controller Failure
Large early release frequency
MELLLA
Stress corrosion cracking
Integrated leak rate test
Severe Accident Management Guideline
Earthquake
Power-Operated Valves
Hardened vent
Turbine Missile
Fuel cladding
Liquid penetrant
Fire Protection Program
Flow Induced Vibration
Coast down
GOTHIC
Power Uprate
Overspeed trip
Simmer margin
Water rod
Water hammer
Control Room Habitability
ML06265034419 September 2006Vermont Yankee Hearing - NRC Staff'S Proprietary and Non-Proprietary Exhibit List
ML06269010731 August 1986Vermont Yankee Hearing - Entergy Exhibit 26, GE Topical Report, Qualification of the One-Dimensional Core Transient Model for Boiling Water Reactors, Report No. NEDO-24154-A, Vol. 1Reactor Vessel Water Level
Anticipated operational occurrence
Abnormal operational transient
Feedwater Controller Failure
Power change
Loss of condenser vacuum
ML08092055528 March 2008Mary Lampert'S Email Re Question for Number of Copies Per Party by Email to the Board and All Parties
ML08135016213 May 2008Vermont Yankee - Exhibit List of NRC Staff Initial Statement of Position on NEC Contentions 2A, 2B, 3 and 4Stress corrosion cracking
License Renewal
Affidavit
ML08175003612 May 2008Exhibits to Entergy'S Direct Testimony on NEC Contention 2 - Environmentally Assisted Fatigue - Includes Exhibits E2-02 Through E2-20, Volume 1Boric Acid
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Finite Element Analysis
Aging Management
Flow Accelerated Corrosion
Feedwater Heater
Stress corrosion cracking
License Renewal
Subsequent License Renewal
EVT-1
Dissimilar Metal Weld
Backfit
Power change
Flow Induced Vibration
Power Uprate
Thermal fatigue