MONTHYEARIR 05000271/20120082012-04-20020 April 2012 Official Exhibit - NYS000462-00-BD01 - IR 05000271-12-008; 1/9 - 13, 1/23 - 27, and 3/19 - 20/2012; Vermont Yankee Nuclear Power Station; Post Approval Site Inspection for License Renewal 1P71003. ML15331A1572011-12-23023 December 2011 Official Exhibit - NYS000460-00-BD01 - Commitment Charge Process. IR 05000271/20110112011-12-22022 December 2011 Official Exhibit - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities. ML0825303982008-09-14014 September 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-28-VY, VY EPRI Checworks Wear Rate Analysis Results Cycles 20 & 21 (2001) ML0823304162008-08-12012 August 2008 Entergy Exhibit List - Appendix a, Entergy Nuclear Vermont Yankee LLC and Entergy Nuclear Operations Inc. July 2008 Evidentiary Hearing ML0823304172008-08-12012 August 2008 NRC Staff Exhibit List - Vermont Yankee Nuclear Power Station July 2008 Evidentiary Hearing ML0823304192008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing, New England Coalition Exhibit List ML0823304982008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_35, NRC, Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Amendment No. 229 to Facility Operating License No. DPR-28 Entergy Nuclear Vermont... ML0825303702008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-19-VY, Effects of Chemistry on Corrosion-Erosion of Steels in Water and Wet Steam ML0825303692008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-18-VY, NRC Exhibit NEC-JH_18 LRA A3 Fdw 02 at Lph Ppb ML0825303452008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-08-VY, Flow-Accelerated Corrosion in Power Plants ML0825303102008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-17-VY, INPO Report OE-21421 (Dresden 3) ML0825303092008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-16-VY, INPO Report OE-17654 (Clinton) ML0825303082008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-15-VY, INPO Report OE-20246 (Clinton) ML0825303072008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-15-VY, INPO Report OE-20246 (Clinton) ML0825303062008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-13-UY, INPO Report OE-17412 (Clinton) ML0823406782008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-RH_02, Curriculum Vitae of Rudolf Hausler ML0825302762008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-06-VY, VY Procedure EN-DC-315 ML0825302732008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-03-VY, Fitzpatrick Cv BVY 04-058, 2008-08/12-Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-04-VY Attachment 2 to Supplement 8 to VY EPU Application2008-08-12012 August 2008 2008-08/12-Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-04-VY Attachment 2 to Supplement 8 to VY EPU Application BVY 05-084, Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-05-VY, Attachment 6 to Supplement 33 to VY EPU Application2008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-05-VY, Attachment 6 to Supplement 33 to VY EPU Application ML0825301682008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-02-VY, Hoffman Cv ML0825200232008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-06-VY, NUREG/CR-6583 ML0823406802008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-UW_02, Curriculum Vitae of Ulrich Witte ML0823407332008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-UW_15, L. E. Hochreiter, Data Collection of Pipe Failures Occurring in Stainless Steel and Carbon Steel Piping, Nuce 597D - Project 1 (April 2005) (Corrected) ML0824904732008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-29-VY, List of Drawings Provided to NEC in Discovery ML0823407342008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-UW_20, Vermont Yankee Nuclear Power Station, PP7028: Piping FAC Inspection Program - FAC Inspection Program Records for 2005 Refueling Outage. (Corrected) ML0824904142008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-02-VY, Fitzpatrick Jc ML0825303182008-07-31031 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Application Exhibit E4-43-VY, Dr. Horowitz'S Checworks Presentation ML0823305252008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_43, PP7028 FAC Inspections 2004 Refueling Outage. ML0825304702008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-14-VY, INPO Report OE-18478 (Clinton) ML0825303752008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-29-VY, EPRI Checworks Wear Rate Cycle 22B (2003) ML0825303722008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-22-VY, Heat and Mass Transfer Downstream of Abrupt Nozzle Expansion in Turbulent Flow ML0825303212008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-39-VY, Checworks v1.0G_Enhancements ML0825302742008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-04-VY, Section B.1.13 of VY LRA ML0825302722008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-02-VY, Horowitz Cv ML0825301692008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-03-VY, Lukens C V ML0824904812008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-39-VY, Vermont Yankee Transient Counting Status ML0823304232008-07-21021 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_02, Curriculum Vitae of Joram Hopenfeld ML0823406772008-07-21021 July 2008 Vermont Yankee July 2008 Evidentiary Hearing-Intervenor Exhibit NEC-JH_71, Bignold, G.J. Et Al, Paper 1, Water Chemistry II, Bnes (1980): 5-18 ML0825504092008-07-21021 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-36-VY, Transcript of ACRS Meeting 03/06/08 (Excerpt) ML0825303632008-07-21021 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-21-VY, INPO Report OE-20127 (Calvert Cliffs) ML0823200362008-06-0202 June 2008 Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhbit B, Approved Applications for Power Uprates -www.NRC.gov/reactors/operating/licensing/power-uprates/approved-applications.html ML0823406792008-06-0202 June 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-RH_05, Rudolf Hausler, Flow Assisted Corrosion (FAC) and Flow Induced Localized Corrosion: Comparison and Discussion ML0823809422008-05-31031 May 2008 2008/05/31-Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 1, NUREG-1907 Safety Evaluation Related to the License Renewal of Vermont Yankee Nuclear Power Station - Volume 1 (ML081430057) & Volume 2 (ML081430109) Combined (May 2 ML0823809412008-05-31031 May 2008 2008/05/31-Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 1, NUREG-1907 Safety Evaluation Related to the License Renewal of Vermont Yankee Nuclear Power Station - Volume 1 (ML081430057) & Volume 2 (ML081430109) Combined (May 2 ML0813501622008-05-13013 May 2008 Vermont Yankee - Exhibit List of NRC Staff Initial Statement of Position on NEC Contentions 2A, 2B, 3 and 4 ML0823200192008-05-12012 May 2008 Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 2, Affidavit of Kenneth C. Chang ML0817500382008-05-12012 May 2008 Exhibits to Entergy'S Direct Testimony on NEC Contention 4 - Flow-Accelerated Corrosion Includes Exhibits E4-02 Through E4-29, Volume 1 ML0817500362008-05-12012 May 2008 Exhibits to Entergy'S Direct Testimony on NEC Contention 2 - Environmentally Assisted Fatigue - Includes Exhibits E2-02 Through E2-20, Volume 1 2012-04-20
[Table view] |
Text
W5 /aD7,6 DOCKET NUMOM "nD. & ITIL. FAOdQ--ýLOtt REBUTTAL TESTIMONY OF CRAIG J. NICHOLS AND JOSE L. CASILLAS ON NEC CONTENTION 3 - LARGE TRANSIENT TESTING - EXHIBIT 2 ODYN Studies Reports GE-NE-B 13-00296-02P 'Recirculation Flow Control Valve Maximum Pump Up-Shift Position for LaSalle County Nuclear Station Units 1 and 2' (Proprietary), March 1998:
This report includes an evaluation to increase the flow control valve position setpoint that allows the BWR to change the recirculation pump from low to high speed. The increased valve position setpoint will result in a larger power spike from the increased valve flow and therefore a high degree of confidence is required that the power spike will not result in a reactor high power scram. The ODYN model is used to predict the magnitude of the power spike during the recirculation pump speed up-shift maneuver. In order to determine the accuracy of the ODYN model to predict the power spike, a benchmark against past maneuvers at the current valve setpoint are made. The figures below illustrate the agreement of the ODYN model prediction of the power spike for two past cases (LaSalle Unit I and 2). The top figure compares the power spike of the first pump speed up-shift and the lower figure compares the power spike of the second pump speed up-shift. The agreement of the ODYN model predictions to the actual data demonstrates the capability of the model for this problem.
C- ,
CA3 utC-remRv CW 1m6--7 frrfrjcnEWe NoZr _& '
NR Sta"l Other_______
AdMUAMMRLEJE1 WfflIWMf Te sec y_- o~s-
.Pkte-
ODYN Model Pump Speed Up-Shift Power Spike Benchmark Figures gon.
g.A
-- C4cd R d--
-*t Ck aw~
20,
-wL.6.I. I2
-&8.%h iIIWd.
64 M M IW WB44 La"4* I Omb 612 54 Go a 18 C 641 10 90.
40.
30.
7 150A 15 601017 106 a6htdTkh ()
2
GE-NE-B31-00265-01 P 'Duane Arnold Energy Center Recirculation Runback Setpoint Evaluation' (Proprietary), April 1998:
This report includes an evaluation to decrease the speed setpoint of the recirculation pump following a loss of feedwater flow event. The partial loss of feedwater from a pump leads to a decrease in water level and may result in a scram if the remaining pumps are not able to increase their flow sufficiently fast and to the level of the steam flow being produced by the reactor.
Therefore, if coincident with the loss of feedwater flow the plant initiates a recirculation flow speed decrease, that will lower the steam flow production, the magnitude of the water level decrease will be mitigated and avoid the scram. The pump speed setpoint to be selected needs to be sufficiently low to accommodate the dynamic response of both the feedwater and recirculation systems. The ODYN model is used to predict the water level transient to establish the optimum pump speed setpoint. In order to determine the accuracy of the ODYN model to predict the water level, a benchmark against past loss of feedwater events are made. The figures below illustrate the agreement of the ODYN model prediction of both the recirculation flow and the water level following the trip of a feedwater pump in the Duane Arnold plant. The top figure compares die pwznp speed reduction to-the current-setpoint-of-45% and-thelower-figures -
compares the resulting water level. This event results in a scram at approximately 30 seconds, and is predicted consistently. The agreement of the ODYN model predictions to the actual data demonstrates the capability of the model for this problem.
3
ODYN Model Flow Runback Water Level Benchmark Figures 1
0 i5 20 25 0 35 40 4 lbs. (second*)
Figure 2. Single Foedwater Pump TUp Event with 45% Runback, Simulation and Tet Dan Compariso: Core Flow.
II I
010 is 20 25 30 35 40 4 Timensaegonds),
Figumre 4. Single Feedwaler Pump Trip Event with 45% Runhack, Simulaion and Test Data Comprisma: Waue Level.
4