-r:>AS /'2 Dated: September 19,2006 Entergy Nuclear Vermont Yankee L.L.C. and Entergy Nuclear Operations Inc.
(Vermont Yankee Nuclear Power Station). Docket No. 50-271-OLA September 2006 Evidentlary Hearing Applicants' Exhibit List P W Marked Offered ACTION:
Party Witnessl Description for ID Iin Evid. - -
[Exh. # Panel (datelpg) (date/pg)Adm. ReJ. Wdrn.
Entergy 1 Nichols/Casillas Resume of Craig Joseph Nichols 09/13/06 09/13/06
,/
Tr. 1149 Tr. 1167 Entergy 2 Nichols/Casillas Resume of Jose L. Casillas 09/13/06 09/13/06
,/
Tr. 1150 Tr. 1167 Entergy 3 Nichols/Casillas CP&L (Brunswick) Updated FSAR, Rev. 18A: 09/13/06 09/13/06 Table 1-3; VY Updated FSAR, Rev. 17, Tables 1.7.1, 1.7.2, 1.7.3, 1.7.4, 1.7.5 and Tr. 1150 Tr. 1167 /
1.7.6 Entergy 4 Nichols/Casillas NUREG-0800, Standard Review Plan, Draft 09/13/06 09/13/06 Rev. 0 - December 2002, Section 14.2.1 "Generic Guidelines for Extended Power Tr. 1151 Tr. 1167 /
Uprate Testing Programs" Entergy 5 Nichols/Casillas Attachment 7 to Entergy Letter BVY 03-80 -- 09/13/06 09/13/06 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change Tr. 1151 Tr. 1167 No. 263, Extended Power Uprate- /
Justification for Exception to Large Transient
_Testing _ _
DOCKETED I USNRC September 19, 2006 (3:35pm)
OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF
-Femiv picdCe =secV-ops
Marked Offered ACTION:
Party Witness/ Description for ID in EvId.
Exh. # Panel (datelpg) (datelpg) Adm. Rej.
Entergy 6 Nichols/Casillas Attachment to Entergy Letter BVY 03-98 -- 09/13/06 09/13/06 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change Tr. 1152 Tr. 1167 No. 263, Supplement No. 3 Extended Power /
Uprate - Updated Information - Justification for Exception to Large Transient Testing Entergy 7 Nichols/Casillas Final Safety Evaluation Report, Vermont 09/13/06 09/13/06 Yankee Nuclear Power Station Extended ,
Power Uprate, Pages 267 - 271 Tr. 1152 Tr. 1167 Entergy 8 Nichols/Casillas Global Nuclear Fuel, Supplemental Reload 09/13/06 09/13/06 Licensing Report for Vermont Yankee Nuclear Power Station, Reload 24 Cycle 25 Tr. 1153 Tr. 1167 (with Extended Power Uprate), Report No. /
0000-0035-6443-SRLR (Rev. 0) December 2005, pages 8-10, 13 Entergy 9 Nichols/Casillas Licensee Event Report, Edwin I. Hatch 09/13/06 09/13/06 Nuclear Plant - Unit 2, LER No. 1999-005-00, Generator Ground Fault Causes Turbine Trip Tr. 1153 Tr. 1167 /
and Reactor Scram (May 27, 1999)
Entergy 1.0 Nichols/Casillas Licensee Event Report, Edwin I. Hatch 09/13/06 09/13/06 Nuclear Plant - Unit 2, LER No. 50-366/2001 003, Sudden Closure of Main Steam Line Tr. 1153 Tr. 1167 Isolation Valve Causes Pressure Increase /
and Reactor Scram on APRM High Flux (Feb.
14,2002) _1 1_1_1 2
P W Marked Offered ACTION:
Party Witness/ Description for ID in Evid.
Exh. # Panel (dat epg) (date/pg) Adm. Rej. Wdrn.
Entergy 11 Nichols/Casillas Licensee Event Report, Edwin I. Hatch 09/13/06 09/13/06 Nuclear Plant - Unit 1, LER No. 50-321/2000 004, Component Failure Causes Turbine Trip Tr. 1154 Tr. 1167 /
.___._and Reactor Scram (Aug. 4, 2000)
Entergy 12 Nichols/Casillas Licensee Event Report, Edwin I. Hatch 09/13/06 09/13/06 Nuclear Plant - Unit 1, LER No. 50-321/2001 002 Component Failure Causes Turbine Trip Tr. 1154 Tr. 1167 I/
and Reactor Scram (May 21, 2001) _
Entergy 13 Nichols/Casillas Licensee Event Report, Brunswick Steam 09/13/06 09/13/06 Electric Plant - Unit No. 2, LER No. 2-03-004, Loss of Generator Excitation Results in Tr. 1155 Tr. 1167 /
Reactor Protection System and Other Specified System Actuations (Jan. 5, 2004)
Entergy 14 Nichols/Casillas Licensee Event Report, Dresden Nuclear 09/13/06 09/13/06 Power Station - Unit 3, LER No. 2004-001 00,Unit 3 Automatic Scram During Testing of Tr. 1155 Tr. 1167 /
the Main Turbine Master Trip Solenoid Valves (Mar. 24, 2004)
Entergy 15 Nichols/Casillas Licensee Event Report, Dresden Nuclear 09/13/06 09/13/06 Power Station - Units 2 and 3, LER No.
2004-002-00, Unit 3 Automatic Scram Due to Tr. 1156 Tr. 1167 Main Turbine Low Pressure Trip and /
Subsequent Discovery of Inoperability of the Units 2 and 3 High Pressure Coolant Injection Systems (Mar. 30, 2004) 1 3
Party P
Witnessl J Description Marked for ID Offered in Evid. -
ACTION:
Exh,.# Panel (date/pg) (datelpg) Adm.] Rej. Wdrn.
Entergy 16 Nichols/Casillas Licensee Event Report, Dresden Nuclear 09/13/06 09/13/06 Power Station - Units 2 and 3, LER No.
2004-003-00, Unit 3 Scram Due to Loss of Tr. 1156 Tr. 1167 Offsite Power and Subsequent Inoperability /
of the Standby Gas Treatment System for Units 2 and 3 (Jul. 6, 2004)
Entergy 17 Nichols/Casillas Licensee Event Report, Vermont Yankee 09/13/06 09/13/06 Nuclear Power Station, LER No. 91-05, Reactor Scram due to Mechanical Failure of Tr. 1156 Tr. 1167 /
345KV Switchyard Bus cause by Broken High Voltage Insulator Stack (Apr. 12, 1991) 1 Entergy 18 Nichols/Casillas Licensee Event Report, Vermont Yankee 09/13/06 09/13/06 Nuclear Power Station, LER No. 91-09, Reactor Scram Due to Loss of Normal Off- Tr. 1157 Tr. 1167 /
site Power (LNP) Caused by Inadequate Procedure Guideline (Jun. 6, 1991)
Entergy 19 Nichols/Casillas Licensee Event Report, Vermont Yankee 09/13/06 09/13/06 Nuclear Power Station, LER No. 91-14,
'Reactor Scram Due to Loss of 345KV Tr. 1157 Tr. 1167 /
Switchyard Caused by Defective Off-Site Carrier Equipment (Jul. 11, 1991)
Entergy 20 Nichols/Casillas Licensee Event Report, Vermont Yankee 09/13/06 09/13/06 Nuclear Power Station, LER No. 2004-003 01, Automatic Reactor Scram due to a Main Tr. 1158 Tr. 1167 Generator Trip as a result of an Iso-Phase /
Bus Duct Two-Phase Electrical Fault (Jun.
14, 2005) 4
Party Witness/ I Description Marked for ID (date/pg)
Offered in Evid.
(datelpg) Adm.
ACTION:
Rej. Wdrn.
Entergy 21 Nichols/Casillas Licensee Event Report, Vermont Yankee 09/13/06 09/13/06 Nuclear Power Station, LER No. 2005-001 00, Reactor Trip Caused by an Electrical Tr. 1158 Tr. 1167 Insulator Failure in the 345 kV Switchyard /
due to a Manufacturing Defect (Sep. 22, 2005)
Entergy 22 Nichols/Casillas Letter from Graham Wallis, Chair, ACRS, to 09/13/06 09/13/06 Chairman Nils J. Diaz, NRC,
Subject:
Vermont Yankee Extended Power Uprate Tr. 1159 Tr. 1167 /
(Jan. 4, 2006)
Entergy 23 Nichols/Casillas Exhibit 1 to Rebuttal Testimony of Craig J. 09/13/06 09/13/06 Nichols and Jose L. Casillas On NEC Contention 3 - Large Transient Testing (June Tr. 1160 Tr. 1167 /
14, 2006), Summary of ODYN Model Reports Entergy 24 Nichols/Casillas Exhibit 2 to Rebuttal Testimony of Craig J. 09/13/06 09/13/06 Nichols and Jose L. Casillas On NEC Contention 3 - Large Transient Testing (June Tr. 1160 Tr. 1167 /
14, 2006), Summary of ODYN Studies Reports Entergy 25 Nichols/Casillas General Electric Company Licensing Topical 09/13/06 09/13/06 Report -- Constant Pressure Power Uprate, Report No. NEDO-33004P-A, Rev. 4 (Jul. Tr. 1161 Tr. 1167 /
2003) (Non-Proprietary Version)
Entergy 26 Nichols/Casillas General Electric Company Topical Report, 09/13/06 09/13/06 Qualification of the One-Dimensional Core Transient Model for Boiling Water Reactors, Tr. 1162 Tr. 1167 /
Report No. NEDO-24154-A, Vol. 1 (Aug.
11986) 5
Marked Offered ACTION:
Party Witness/ Description for ID In Evid.
Exh.(datepg) (datepg) Adm. Re]. Wdrn.
Entergy 27 Nichols/Casillas General Electric Company Topical Report, 09/13/06 09/13/06 Qualification of the One-Dimensional Core Transient Model for Boiling Water Reactors, Tr. 1162 Tr. 1167 /
Report No. NEDO-24154-A, Vol. 2 (Aug.
1986)
Entergy 28 Nichols/Casillas Global Nuclear Fuel, Supplemental Reload 09/13/06 09/13/06 Licensing Report for Vermont Yankee Nuclear Power Station, Reload 24 Cycle 25 Tr. 1163 Tr. 1167 (with Extended Power Uprate), Report No. /
0000-0035-6443-SRLR (Rev. 0) December 2005 Entergy 38 Nichols/Casillas Chart at page 7 of prefiled testimony 09/13/06 09/13/06
/
Tr. 1172 Tr. 1173 Entergy 39 Nichols/Casillas Table 1 attached to prefiled testimony 09/13/06 09/13/06
/
_______________________Tr. 1172 Tr. 1173 _____