Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML02033003631 January 2002Issuance of License & TS Pages, Amendment 230 Re Proposed Operating License and Technical Specifications Changes - Deletion of Obsolete License ConditionsSafe Shutdown
Fire Protection Program
ML02070023122 February 2002Part 1 of 10, North Anna Power Station, Units 1 & 2 Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License ConditionsSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Time to boil
Coatings
Reserve Station Service Transformer
Qualified Offsite Circuit
Battery sizing
Fuel cladding
Recently irradiated fuel
Offsite Circuit
ML02070028222 February 2002Part 2 of 10, North Anna Power Station, Units 1 & 2, Proposed Imposed Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, BasesBoric Acid
Shutdown Margin
High Radiation Area
Stroke time
Anticipated operational occurrence
Hydrostatic
Earthquake
Power change
ML02070031122 February 2002Part 3 of 10, North Anna Power Station, Units 1 & 2, Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, Technical SpecificSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Missed surveillance
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Power change
ML02070033022 February 2002Part 4 of 10, North Anna Power Station, Units 1 & 2, Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, B.3.3 InstrumentatSafe Shutdown
Unanalyzed Condition
Boric Acid
Reactor Vessel Water Level
Grab sample
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Fuel cladding
Pressure Boundary Leakage
Unidentified leakage
ML02070036122 February 2002Part 7 of 10, North Anna Power Station, Units 1 & 2, Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, AttachmentSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Post Accident Monitoring
Earthquake
Pressure Boundary Leakage
Recently irradiated fuel
ML02070036322 February 2002Part 5 of 10, North Anna Power Station, Units 1 & 2, Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, 3.3 InstrumentatioHigh Radiation Area
Ultimate heat sink
Grab sample
Post Accident Monitoring
Hydrostatic
Pressure Boundary Leakage
Power change
ML02070037422 February 2002Part 8 of 10, North Anna Power Station, Units 1 & 2, Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, Table RBoric Acid
Time of Discovery
Shutdown Margin
Missed surveillance
Pressure Boundary Leakage
ML02070038722 February 2002Part 6 of 10, North Anna Power Station, Units 1 & 2, Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, 3.7 Plant SystemsShutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Operating Basis Earthquake
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
ML02070043522 February 2002Part 9 of 10, North Anna Power Station, Units 1 & 2, Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, Table RBoric Acid
Shutdown Margin
Post Accident Monitoring
Hydrostatic
ML02070047922 February 2002Part 10 of 10, North Anna Power Station, Units & 2, Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, Table RShutdown Margin
High Radiation Area
Ultimate heat sink
Recently irradiated fuel
Offsite Circuit
ML02078039718 March 2002Correction & Clarification to Facility Operating License Amendment No. 230
ML02246015520 August 2002Technical Specification Bases ChangesSafe Shutdown
Anticipated operational occurrence
Recently irradiated fuel
Offsite Circuit
ML02325041914 November 2002Correction to Technical Specifications Bases Page Issued with Amendments 232 & 214
ML0314101039 May 2003Technical Specification Bases ChangesAnticipated operational occurrence
Recently irradiated fuel
ML03168142111 June 2003Proposed TS Changes Use of Realistic LBLOCA & Small Break LOCA Methodology for Analysis of Framatome Advanced Mark-BW FuelReactor Vessel Water Level
Post Accident Monitoring
Exemption Request
ML03267082112 September 2003Proposed Technical Specification Changes Implementation of Alternative Source TermAnticipated operational occurrence
Deep Dose Equivalent
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Power change
ML0407106844 March 2004Proposed Technical Specification Changes Regarding Deletion of Note for Performance of Cot
ML04098003030 March 2004Proposed Technical Specification Changes Implementation of Alternate Source Term Request for Additional Information Containment Spray Systems Iodine Removal
ML04140011412 May 2004Tech Spec Page for Amendments 235 & 217 Regarding Extended Inverter Allowed Outage Time
ML0419502771 July 2004Proposed Technical Specifications Change Request Reactor Coolant System Pressure/Temperature Limits Ltops Setpoints and Ltops Enable TemperaturesStroke time
Anticipated operational occurrence
Hydrostatic
Exemption Request
ML04244016930 August 2004Proposed Technical Changes to Extend Inspection Interval for Reactor Coolant Pump Flywheels Using Consolidated Line Item Improvement ProcessIncorporated by reference
ML04260029015 September 2004Proposed Technical Specifications Change Administrative Controls Changes
ML04293005112 October 2004Technical Specifications Bases for North Anna Units 1 & 2Safe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Stroke time
Anticipated operational occurrence
Time to boil
Post Accident Monitoring
Hydrostatic
Coatings
Reserve Station Service Transformer
Qualified Offsite Circuit
Missed surveillance
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
ML05089010122 March 2005Tech Spec Pages for Amendments 238 & 219 Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement ProcessUltimate heat sink
Post Accident Monitoring
ML05291038812 October 2005Technical Specification Bases ChangesSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Stroke time
Anticipated operational occurrence
Time to boil
Post Accident Monitoring
Hydrostatic
Coatings
Reserve Station Service Transformer
Qualified Offsite Circuit
Missed surveillance
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
ML0530800503 November 2005Proposed Emergency Technical Specification Change One Time Extension of the Completion Time for the Low Head Safety Injection (Lhsi) Train aBoric Acid
High winds
Non-Destructive Examination
Mission time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
Fuel cladding
Liquid penetrant
ML06143006222 May 2006Proposed License Amendment Request Consolidated Line Item Improvement Process Technical Specification Improvement Regarding Steam Generator Tube IntegrityNondestructive Examination
Incorporated by reference
Fuel cladding
Pressure Boundary Leakage
ML06186022530 June 2006Technical Specifications Bases Change for Diesel Fuel Oil Testing Program Technical Specification ChangeSafe Shutdown
ML0628501953 October 2006Proposed Technical Specification Change and Supporting Safety Analyses Revisions to Address Generic Safety Issue 191Boric Acid
ML07074067313 March 2007Units, 1 and 2, Tech Spec Pages for Amendments 250 and 230 Regarding Technical Specification Changes Per Generic Safety Issue (GSI) 191
ML08080036419 March 2008Proposed License Amendment Request Deletion of TS 3.7.13 - Main Control Room/Emergency Switchgear Room Bottled Air System from Technical SpecificationsSafe Shutdown
Shutdown Margin
High Radiation Area
Ultimate heat sink
Fire Barrier
Post Accident Monitoring
Probabilistic Risk Assessment
Earthquake
Recently irradiated fuel
ML08353098217 December 2008Proposed License Amendment Request Adoption of TSTF-490, Revision 0, Regarding Deletion of E Bar Definition and Revision to RCS Specific Activity Using the Consolidated Line Item Improvement ProcessShutdown Margin
Incorporated by reference
Pressure Boundary Leakage
Power change
ML09021027915 January 2009Proposed License Amendment Request TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action StatementsMission time
ML09273046828 September 2009Proposed License Amendment Request, TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action StatementsMission time
ML0929403359 October 2009Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 5.5.13.dRecently irradiated fuel
ML0929405939 October 2009Technical Specifications Bases, Revision 41Safe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Stroke time
Anticipated operational occurrence
Time to boil
Post Accident Monitoring
Hydrostatic
Coatings
Reserve Station Service Transformer
Qualified Offsite Circuit
Missed surveillance
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
ML10090016730 March 2010Marked-Up Technical Specification Bases Page ChangesSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Stroke time
Surveillance Frequency Control Program
Battery sizing
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
ML1012605176 May 2010Proposed License Amendments and Exemption Request for Use of Optimized Zirlo Fuel Rod CladdingPost Accident Monitoring
Exemption Request
Fuel cladding
ML1029402889 October 2010Technical Specifications Bases ChangesSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Time to boil
Post Accident Monitoring
Internal Flooding
Hydrostatic
Coatings
Reserve Station Service Transformer
Qualified Offsite Circuit
Missed surveillance
Battery sizing
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
ML11119009327 April 2011License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation.Boric Acid
Grab sample
Safe Shutdown Earthquake
Pressure Boundary Leakage
Pressure boundary leak
ML11298A2168 October 2011Technical Specifications BasesSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Time to boil
Post Accident Monitoring
Internal Flooding
Hydrostatic
Coatings
Reserve Station Service Transformer
Qualified Offsite Circuit
Missed surveillance
Surveillance Frequency Control Program
Battery sizing
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
ML12321A1045 October 2012Technical Specifications BasesSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Time to boil
Post Accident Monitoring
Internal Flooding
Hydrostatic
Coatings
Reserve Station Service Transformer
Qualified Offsite Circuit
Missed surveillance
Surveillance Frequency Control Program
Battery sizing
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
ML13302B8932 October 2013Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D
ML15289A3892 October 2015Technical Specification BasesSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Time to boil
Post Accident Monitoring
Internal Flooding
Hydrostatic
Coatings
Reserve Station Service Transformer
Qualified Offsite Circuit
Missed surveillance
Surveillance Frequency Control Program
Battery sizing
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
ML16288A1204 October 2016Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.dSurveillance Frequency Control Program
Offsite Circuit
ML16288A1414 October 2016Technical Specification BasesSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Time to boil
Post Accident Monitoring
Internal Flooding
Hydrostatic
Coatings
Reserve Station Service Transformer
Qualified Offsite Circuit
Missed surveillance
Surveillance Frequency Control Program
Battery sizing
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
ML17291A32512 October 2017Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specifications 5.5.13.d
ML17291A33612 October 2017Technical Specification Bases ChangesSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Time to boil
Post Accident Monitoring
Internal Flooding
Hydrostatic
Coatings
Reserve Station Service Transformer
Qualified Offsite Circuit
Missed surveillance
Surveillance Frequency Control Program
Battery sizing
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
ML18031A2276 February 2018Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI)Time of Discovery