Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML17192A8367 March 1980Engineering Criteria/Procedure for Review & Resolution of As-Built Deviations, Revision 2Earthquake
ML17192A8387 March 1980Engineering Criteria Procedure for Application of Blume Curves Criteria.
ML19207B87130 August 1979Rept NSP-37-005,Revision 1, IE Bulletin 79-14, Safety-Related Piping Sys Insp Plan,Monticello Nuclear Generating Plant.Earthquake
ML19263C48628 February 1979Offsite Dose Calculation ManualSafe Shutdown
Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Fire Protection Program
ML20024A1904 May 1983Public Version of Rev 11 to Emergency Plan Implementing Procedure Qep 550-0, Emergency Equipment & Supplies & Rev 5 to Qep 550-T1, Environ Sampling Supplies. Receipt Form Encl
ML20024B97230 June 1983Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 330-0 Re Assessment Actions & Qep 330-11 Re Estimation of I-131 Release by Field Team Measurements.Revised Index Encl
ML20024E1753 June 1983Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 330-0 Re Assessment Actions & Qep 330-11 Re Estimation of I-131 Release by Field Team Measurements
ML20028C37215 December 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 460-1 Re Emergency Operations Facility Setup & Qep 460-0 Re Emergency Operations Facility
ML20028C65123 December 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 110-1, Station Director Implementing Procedure, Qep 310-1, Initial Notification & Qep 530-2, Emergency Drills.Safe Shutdown
Health Physics Network
Anticipated operational occurrence
Nuclear Accident Reporting System
Earthquake
ML20028F78119 January 1983Public Version of Rev 9 to Emergency Plan Implementing Procedures Qep 440-0, Communications Sys & Qep 440-1, Emergency Communication Facilities.Health Physics Network
Nuclear Accident Reporting System
ML20029B19830 April 1990Rev 9 to, Quad-Cities Process Control Program for Processing Radioactive Wet Waste.Process Control Program
ML20040D07431 December 1981Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 440-0 Re Communications Sys & 440-1 Re Emergency Communication FacilitiesHealth Physics Network
Nuclear Accident Reporting System
ML20040E3035 January 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 530-0 Re Exercises & Drills, 530-2 Re Emergency Drills & 530-S1 Re Monthly Test of NRC Health Physics Network.Revised Table of Contents EnclHealth Physics Network
High Radiation Area
Nuclear Accident Reporting System
ML20040F36128 January 1982Reactor Water Clean-Up Sys Temporary Repair of Nonisolable Intergranular Stress Corrosion Cracking.Packing leak
Weld Overlay
Nondestructive Examination
Liquid penetrant
ML20041A31122 January 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 200-0 Re Emergency conditions,200-2 Re Classification of Incident Involving Hazardous Matls & 200-T3 Re Hazardous SubstancesHealth Physics Network
High Radiation Area
ML20042B9802 March 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 360-0 Re Protective Measures for Onsite Personnel,Qep 360-2 Re Plant Evacuation & Qep 360-3 Re Site EvacuationHealth Physics Network
ML20042B98916 February 1982Public Version of Revised Emergency Plan Implementing Procedures Including Qep 110-0 Re Station Director,Qep 120-0 Re Operations Director & Qep 130-0 Re Technical DirectorSafe Shutdown
Health Physics Network
Nuclear Accident Reporting System
Earthquake
ML20050C68516 February 1982Public Version of Revised Emergency Plan Implementing Procedures Qep 120-0 Re Operations Director,Qep 140-0 Re Maint Director & Qep 130-0 Re Technical DirectorSafe Shutdown
Health Physics Network
Nuclear Accident Reporting System
Earthquake
ML20050D41110 March 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure 330-6 Re Air Sampling Under Accident Conditions & 330-T2 Re Dose Factors for Gaseous Releases.Revised List of Assessment Actions Encl
ML20050E16418 March 1982Public Version of Revision 3 to Emergency Plan Implementing Procedures 350-0 Re Recommendations for Offsite Protective Actions & 350-T1 Re Recommended Protective Actions for Gaseous Release
ML20052A0981 April 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 310-0 Re Notification of Responsible Authorities & Qep 320-1 Re Activation of Emergency OrganizationNuclear Accident Reporting System
ML20052E31815 April 1982Public Version of Revised Emergency Plan Implementing Procedures 110-0 Re Station director,110-2 Re Acting Station Director (Shift Engineer) Implementing Procedure & 110-T1 Re RCT Task Prioritization
ML20052F77019 April 1982Public Version of Revised Emergency Plan Procedures Consisting of Revision 3 to Procedure 540-0 Re Public Info & Revision 2 to Procedure 540-1 Re Public Info
ML20053C46627 April 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure Qep 180-0 Re Rad/Chem Director,Qep 440-0 Re Communication Sys & Qep 440-1 Re Emergency Communication FacilitiesHealth Physics Network
Nuclear Accident Reporting System
ML20054G62518 February 1979Design Spec, Basis for Design of Drywall Containment Vessel Penetration
ML20054H15228 May 1982Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H42928 May 1982Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H49218 May 1982Public Version of Revision 7 to Emergency Plan Implementing Procedure Qep 110-1, Station Director Implementing Procedure & Revision 4 to Qep 340-1, Operation During Earthquake ConditionsEarthquake
ML20054J8692 June 1982Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures, Including Revision 2 to Procedure ED-3 Re Demand Polling of Meteorological Data
ML20054M33922 June 1982Public Version of Revision 4 to Emergency Plan Implementing Procedure EPIP 700-1, Corporate Command Ctr Group Directory. Revision 7 to Table of Contents Encl
ML20055E8101 July 1990Rev 3 to Pump & Valve Inservice Testing Plan for Quad-Cities Nuclear Power Station Units 1 & 2Non-Destructive Examination
Stroke time
Hydrostatic
Scram Discharge Volume
Cold shutdown justification
Power Operated Valves
ML20059C73428 February 1989Rev 8 to Quad-Cities Station Process Control Program for Processing of Radioactive Wet WasteProcess Control Program
ML20062B42621 June 1982Public Version of Revision 2 to Emergency Plan Implementing Procedure Qep 530-3, Offshift Augmentation Drill & Revision 10 to Qep 530-0, Exercises & DillsHealth Physics Network
ML20062J36828 October 1993Station,Third Ten-Yr Interval IST Plan
ML20063C67926 May 1982Public Version of Revision 8 to Emergency Plan Implementing Procedure Qep 440-0 Re Communications Sys & Revision 8 to Qep 440-1 Re Emergency Communication FacilitiesHealth Physics Network
Nuclear Accident Reporting System
ML20063F92331 January 1994Rev 1.0 to Chapters 10,11,12 & App F to ODCM,Quad-Cities Station
ML20063H81411 February 1994Revised Procedures,Including Rev 16 to Qep 120-0, Technical Director Index 58 & Rev 3 to Qep 120-T10, Key Point History Listing
ML20063M48916 August 1982Public Version of Revision 6 to Emergency Procedure Qep 200-T1, Quad Cities Emergency Action Levels & Revision 7 to Qep 360-2, Plant Evacuation Assembly. Revised Indices Qep 200-0 & Qep 360-0 EnclEarthquake
ML20063M68723 July 1982Public Version of Revision 8 Emergency Plan Implementing Procedure Qep 310-0, Notification of Responsible Authorities & Revision 4 to Qep 310-T3, Prioritized Notification Listing
ML20064G10814 February 1994Quad-Cities Nuclear Station 1994 Mgt Plan
ML20065Q84523 September 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 200-0 Re Emergency Conditions,Qep 200-T1 Re Emergency Action Levels & Qep 330-3 Re Sping Control Terminal Operation
ML20066C8271 October 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Qep 340-6 Re Chlorine Dioxide Spill, Qep 530-S1 Re Monthly NARS Drill & Qep 530-0 Re Exercises & DrillsHealth Physics Network
Earthquake
ML20067A93618 October 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 330-6 Re Air Sampling Under Accident Conditions & Qep 330-T9 Re Air Radiation Monitoring Sys
ML20069F8037 March 1983Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 310-0 Re Notification of Responsible Authorities & Qep 310-T3 Re Prioritized Notification ListingHigh Radiation Area
Earthquake
ML20069L0024 April 1983Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 160-1 Re Administrative Director,Qep 530-0 Re Exercises & Drills & Qep 200-0 Re Emergency ConditionsSafe Shutdown
Anticipated operational occurrence
Nuclear Accident Reporting System
Earthquake
ML20069L17014 October 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 180-0 Re Rad/Chem Director,Qep 420-0 Re Onsite Technical Support & Qep 530-0 Re Exercises & DrillsHealth Physics Network
Nuclear Accident Reporting System
ML20070H99530 September 1982EDS-NUTECH Interface Control Instructions, Revision 0
ML20070J0071 October 1982IE Bulletin 79-14 & Tap Piping Evaluation,Quad Cities Units 1 & 2 & Dresden Units 2 & 3, Revision 0Earthquake
ML20070L1008 December 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 310-T3 Re Prioritized Notification Listing & Qep 360-3 Re Site EvacuationNuclear Accident Reporting System
ML20071E2017 February 1983Public Version of Rev 14 to Emergency Plan Implementing Procedures Qep 530-0, Exercises & Drills & Rev 5 to Qep 530-S1, Monthly NARS (Esda) Drill,Quad Cities StationHealth Physics Network