ML20052A098
| ML20052A098 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 04/01/1982 |
| From: | COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML20052A096 | List: |
| References | |
| PROC-820401-01, NUDOCS 8204270084 | |
| Download: ML20052A098 (13) | |
Text
-
QEP 310-0 i
Rtvicica 5 ID/2Q,2R NOTIFICATION OF RESPONSIBI2 AUTHORITIES 310-0 Notification of Responsible Authorities Rev. 5 04-01-82 310-1 Initial Notification Rev. 3 04-01~-81 310-T1 Guidance for Augmentation of the On-Site Emergency Organization within 30 Minutes Rev. 4 04-01-82 310-T2 State of Illinois Nuclear Accident Reporting System Form Rev. 1 04-01-81 310-T3 Prioritized Notification Listing Rev. 1 04-01-82
,i r
f l
APPROVED APR 011982 q.c.o.sa 8204270 o%4
- - -.. _,,,, -----. (final)
GF ^0Tu ^*^^^254 dif
t e
QEP 310-T1 GUIDANCE FOR AUGMENTATION OF THE Revision 4 ID/2S ON-SITE EMERGENCY ORGANIZATION March 1982 WITHIN 30 MINUTES AUGMENTATION WITHIN 30 MINUTES TRANSPORTATION ACCIDENT &
SITE & GENERAL FUNCTIONAL AREA UNUSUAL EVENT ALERT EMERGENCY 1.
Command & Control Notification Only Station Director 1
1 1
Oper Director 1
1 1
Maint Director
- 1 1
1 Tech Director
- 1 1
1 Admin Director
- 1
- 1 1
Stores Director
- 1
- 1 1
Rad./ Chem. Director
- 1 1
1 Security Director
- 1
- 1 1
Environs Director
- 1 1
1 2.
Notifications &
Communications 3.
Accident Assessment Off-Site
- 2 4
(~
On-Site
- 1 1
In-Plant
- 1 1
Rad./ Chem. (Lab)
- 1 1
4.
Technical Support Nuclear (Core)
- 1 1
Electrical
- 1 1
Mechanical
- 1 1
5.
Repair & Correction Mechanical
- 1 1
Electrical
- 1 1
Radwaste
- 1 1
Inst. & Control
- 1 1
6.
Protective Actions Radiation Protection
- 2 4
TOTALS
- 2-9
- 7-24 28 j
- As needed depending upon the nature of the emergency.
NOTE: Additional support in the areas of Command & Control; Communications; and Accident Assessment will be available from the Corporate Command Center Staff.
It is reasonable to expect partial manning of the CCC within 30 minutes for the Site & General Emergencies.
D APR 011982
- g. c. o. S. R.
'm QEP 310-Tl Revision 4 Shift Engineer e
On-Ca l'1 S.C.R.E.
H.S.O.'s Shift Foreman Duty Person
'L, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ q I
I St at ion Operations Radwaste Director Director Foreman Maintenance Te huical Director Director cal.L 1.1ST Radwaste Staff Maintenance Tech Staff Caller Caller cal.l. I.IST Security Admin.
Rad-Chem Environs Director Director Director I)f rector Maintenance Stores Rad-Chem Director Caller cal.I. LIST G.E. Site Tech Staff Representative cal.i. 1.l ST APPROVED Rad-Chem n-Site Personnel Notification APR 011982 Phone Notification Q.c.o.s.a. (final) l
I 1
4 QEP 310-T3 Revision 1 PRIORITIZED NOTIFICATION LISTING March 1982 ID/SA ON-CALL DUTY PERSON Name Home Phone R. L. Bax F. J. Geiger L. F. Gerner J. A. Neal R. A. Robey G. F. Spedl T. K. Tamlyn J. C. Tietz STATION DIRECTOR
[
Name Priority Home Phone N. J. Kalivianakis 1
T. K. Tamlyn 2
L. F. Gerner 3
R. L. Bax 4
OPERATIONS DIRECTOR Name Priority Home Phone T. K. Tamlyn 1
R. A. Robey 2
G. F. Spedl 3
TECHNICAL DIRECTOR Name Priority Home Phone G. C. Tietz 1
APPROVED J. H. Schnitzmeyer 2
APR 011982 H. G. Lihou 3
Q.C.O.S.H. t l
QEP 310-T3 Revision 1 MAINTENANCE DIRECTOR Name Priority Home Phone G. R. Price 1
D. G. Rajcevich 2
D. G. Van Pelt 3
- R. L. Bax 4
STORES DIRECTOR Name Priority Home Phone L. G. Butterfield 1
S. L. Simpson 2
F. D. Delk 3
ADMINISTRATIVE DIRECTOR i
Name Prio rir.y Home Phone I.
D. M. O'Connor 1
F. B. Faley 2
Z. A. Rudy 3
SECURITY DIRECTOR Name Prio rity Home Phone G. J. Toleski 1
J. R. Wunderlich 2
K. L. Leech 3
RAD-CHEM DIRECTOR Name Priority Home Phone T. J. Kovach 1
T. D. Keith 2
APR 011982 -
W. A. Bielasco 3
Q.C.O.S.R.
- This person should be notified first, even though he is unable to be on-site within 30 minutes. Then, notify the Maintenance Director by priority,to come to the site to augment the Station staff. I l
QEP 310-T3 Rtvision 1 ENVIRONS DIRECTOR Name Priority Home Phone T. J. Kovach 1
R. L. Carson 2
G. P. Gary 3
MALNTENANCE CALLER Name Home Phone J. F. Fish J. J. Kopacz D. F. Thayer H. W. Wilson TECH STAFF CALLER Name Home Phone f
(
D. G. Clark D. W. Jessen R. D. Soden B. R. Strub RAD-CHEM CAT.T.FR Name Home Phone R. L. Moore J. *i Piercy A. G. Schabilion P.
Skiermont R. D. Tank APPROVED APR 011982 Q. c. o. s. a. t
QEP 310-T3 Revision 1 MECHANICAL MAINTENANCE CALL LIST
+
Name Priority Home Phone i
G. R. Price 1
[
D. F. Thayer 2
F. D. Delk 3
J. F. Fish 4
H. W. Wilson 5
J. J. Kopacz 6
R. C. Schofield 7
R. H. Tucker 8
I J. E. Koenes 9
J. A. Weaver 10 G. L. Hayes 11 l
T. B. Pettit 12 I
C. L. Edmondson 13 g
K. E. Sondgeroth 14 i
k G. B. Hattan 15 M. A. Jurgensen 16 W. A. Pottenger 17 18 R. G. Phippen J. E. Petryshyn 19 D. F. Blaufuss 20 ELECTRICAL MAINTENANCE CALL LIST Name Priority Home Phone D. G. Van Pelt 1
R. J. Vess 2
B. J. Maze 3
APPROVED W. A. Krause 4
D. L. Meyer 5
APR 011982 C. W. Elsasser 6
Q. C. O. S. rt
, t' I
QEP 310-T3 Ravision 1 INSTRUMENT MAI.VI'ENANCE CALL LIST Name Priority Home Phone D. G. Rajcevich 1
L. E. Werntz 2
R. P. Soenksen 3
C. L. Richardson 4
A.
J. Schmidt 5
RAD-CHEM CALL LIST Name Friority Home Phone P. M. O'Brien 1
M. J. Hesse 2
J. J. Daubard 3
M. E. Field 4
J. C. Rasso 5
5[
J. L. Woods 6
S. D. Workman 7
D. E. Bielema 8
G. R. Webster 9
J. L. Frechette 10 M. S. Zinnen 11 J. W. Rosenow 12 A. P. O'Horo 13 T. M. De May 14 T. D. Bush 15 R. L. Cadogan 16 D. C. Wright 17 L. C. Williams 18 J. R. KiIng 19 D. L. Heitzler 20 A p p ROV E D --
K. D. Anderson 21 APR 011982 C. R. Brown 22 J. R. Dishman 23 G!. CL O. SL N. *l l
QEP 310-T3 Revision 1 s'
C TECH STAFF-NUCLEAR CALL LIST Name Priority Home Phone B. R. Strub 1
M.
L.. Reed 2
P. D. Knoespel 3
J. P. Hoeller 4
TECH STAFF-MECHANICAL / ELECTRICAL CALL LIST Name Priority Home Phone D. G. Clark 1
S. W. Reynolds 2
R. D. Buss 3
D. B. Cook 4
C. A. Hebel 5
K. K. Medulan 6
I t
F. R. Kaeppel 7
E. E. Mendenhall 8
C. A. Iben 9
TECH STAFF-SPECIAL PROJECTS CALL LIST Name Priority Home Phone J. R. Wunderlich 1
D. W. Jessen 2
R. D. Soden 3
E. B. Weinfurter 4
APPROVED APR 011982 Q.C.O.S.h t
QEP 310-T3 Ravision 1-RADWASTE CALL LIST Name Priority Home Phone J. W. Forrest 1
R. N. Jackson 2
L. G. Monroe 3
G. W. Klone 4
R. J. Thompson 5
A. A. Griffiths 6
R. L. Petri 7
H. E. Gnoske 8
M. J. Fecht 9
I
\\.
APPROVED.
APR 011982 Q.c.o.S.R.
. ( final)
/
QEP 320-0 Revicica 4 April 1982 ID/IM,1N GSEP ACTIVATION 320-0 GSEP Activation Rev. 4 04-01-82 l
320-1 Activation of the Emergency Organi?mtion Rev. 4 04-01-82 i
i l
f t
{
I i
t i
f I
l
\\
i
+
/
(
4 r
f k
4
- 5 APPROVED APR 011982 Q.c. o. s. R. (final)
,.s QEP 320-1 Revision 4 ACTIVATION OF THE EMERGENCY March 1982 ORGANIZATION ID/5B A.
PURPOSE The purpose of this procedure is to outline the method to provide for the activation of the Quad-Cities GSEP organization.
P B.
REFERENCES 1.
GSEP Tables 6.1-1 through 6.1-5.
2.
GSEP-QCA Section 6.1.
3.
QEP 310-1.
4.
QEP 310-T1.
5.
QEP 310-T2.
6.
QEP 310-T3.
7.
ED-17.
C.
PREREQUISITES 1.
None.
D.
PRECAUTIONS 1.
None.
APPROVED E.
LIMITATIONS AND ACTIONS APR 011982 1.
None.
'Q.C.O.S.R.
F.
PROCEDURE 1.
QEP 310-1 outlines the responses necessary for the various GSEP condi-tions. GSEP Tables 6.1-1 through 6.1-5 provide for the total scope of responses for all parties involved.
2.
QEP 310-1 outlines the agency notifications necessary.
3.
QEP 310-T1 gives the augmentation scheme for the Quad-Cities Station i
GSEP Directors and Support Personnel.
QEP 310-T3 identifies the individuals capable of serving in the positions specified in QEP 310-T1.
The call out lists of QEP 310-T3 are prioritized to facilitate achieving acceptable staff augmentation within 30 minutes.
- s
QEP 320-1
- 3. '
- R vision 4 l
e-i a.
QEP 310-T3 is arranged so that the appropriate Director / Department Head / Group Leader is notified first.
In all cases except for the Maintenance Director, these personnel can be on-site within
~'
30 minutes.
b.
All other personnel listed in QEP 310-T3 are shown by priority with respect to distance from the site.
c.
In the case of the Maintenance Director, the lead person should be notified first, even though he cannot be on-site within 30 minutes.
Then, the back-up Maintenance Director should be notified by priority to augment the site staff.
4.
The TSC and OSC are activated for an alert, site emergency,' or general emergency.
5.
For a general emergency, the Station Director must immediately notify the Illinois Emergency Services and Disaster Agency, the Iowa Office of Disaster Services, the Rock Island Communications Center, the Scott County Sheriff's Office, the Clinton County EOC, and the Whiteside County Sheriff and EOC. He recommends protective actions as necessary.
Actions will be tsken in accordance with state and local plans. The NARS system and Nuclear Accident Reporting Form shod 1d be used for this purpose.
G.
CHECKLISTS 1.
None.
H.
TECHNICAL SPECIFICATION REFERENCES 1.
None.
l APPROVED APR 011982
!. CL O. S. R.
-2& final)
~t