Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 180-0 Re Rad/Chem Director,Qep 420-0 Re Onsite Technical Support & Qep 530-0 Re Exercises & Drills
ML20069L170
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 10/14/1982
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20069L166 List:
References
PROC-821014-01, NUDOCS 8211170080
Download: ML20069L170 (29)


Text

... . - . - . . .. .-_. . . - . . _ - = . ._- - - . . . - . . . ...-_ _-. .

l , QEP 180-0 Rmvision 4 October 1982 ID/20,2P RAD / CHEM DIRECTOR .

180-0 Rad /Chen Director Rev. 4 10-14-82 1 180-1 Rad / Chem Director Implementing Procedure Rev. 4 10-14-82 t

1

! I t

i i

)

I I

}

)

4 i .W r) ROV d u i

OCT 141982

~

O C. O. a. it 1 -

l

' B211'170000 821108 PDR ADDCK 05000254 (final)

F PDR

  • QEP 180-1

. Revision 4 g RAD / CHEM DIRECTOR October 1982 IMPLEMENTING PROCEDURE ID/2Q A. PURPOSE The purpose of this procedure is to outline the method used to implement the Rad / Chem Director duties.

B. REFERENCES

1. GSEP Table 4.2-8.
2. QEP 330 Block Procedures, Assessment Actions.
3. QEP 350-T1, GSEP Guidelines for Recommended Off-Site Protective Actions for Gaseous Plume Exposure.
4. QEP 350-T2, GSEP Guidelines for Protection Against Ingestion of Contami-nation for the Off-Site Public.
5. QEP 360-2, Plant Evacuation and Assembly.
6. QEP 360-3, Site Evacuation.

C. PREREQUISITES

1. None.

D. PRECAUTIONS

1. None.

E. LIMITATIONS AND ACTIONS

1. Responsibilities:
a. To direct a staff in deteomining the extent and nature of radio-logical or hazardous material problems onsite (and initially offsite) to the degree necessary to assess personnel exposures or plant releases.
b. To provide radiological and hazardous material information and recommendations to the Station Director.

hl'? ROV d o OCT 141982 l O onoan QEP 180-1

, Rrvision 4

2. Notification:

'~'

a. Initial notification by:

(1) Acting Station Director.

(a) Shif t Supervisor.

(b) Senior NSO.

(2) Station Director.

F. PROCEDURE

1. Assist in planning personnel rescue operations and with respect to hazardous material accidents, provide monitoring services as required.
2. Decide which of the predetermined personnel evacuation routes is to be used when deemed necessary. .
3. Ensure that personnel are decontaminated, if necessary.
4. Assist in the transfer of injured and non-essential personnel.
5. Ensure that appropriate bioassay procedures have been implemented for onsite personnel when a radioactivity incident has occurred.

6' . Accumulate, tabulate, and evaluate data on plant conditions such as meteorological and radiation area monitoring readings, hazardous material surveys, and other pertinent data. ARM readings may be tabulated on QEP 330-T9. General arrangement drawings are provided in the TSC giving locations of the ARM stations.

7. Ensure use of protective clothing, respiratory protection, and access control within the plant as deemed appropriate to control personnel exposures.
8. Request through the Health Physics Director:
a. Additional or special personnel monitoring devices (TLDs, whole body counters, etc.)
b. Engineering evaluations of temporary shielding or special equipment

! and tools.

c. Additional health physics support personnel.

~

d. Additional instrumentation and equipment, as required.
9. Set up, as appropriate, a group qualified to receive contaminated and injured personnel and perform first aid duties, y M t' RO'I d a d OCT141982 U L U. 3

, _ _ , . _ _ . __ .._.. ..,_.,-_____ _ _ , . _ _ __.___.__.~..m . _ _ _ _ _ _ - - _ _ - . _ _ _

J QEP 180-1

, Rzvision 4

10. Coordinate initial.offsite monitoring efforts of the Environs Group until.such' activities can be directed by a designated Environs Director.
11. Maintain a record of the GSEP related activities.
12. During site assembly, Radiation Chemistry Technicians will be dispatched to the assembly areas to monitor and decontaminate, if necessary all

, personnel still wearing protective clothing. A Radiation Chemistry Technician will also be dispatched to the machine shop to monitor the area for direct and airborne radiation problems.

13. Prioritize RCT sampling tasks to ensure the acquisition of the most pertinent data during the early phases of a GSEP condition. Samples should be obtained in the order listed in QEP 110-T1, if practicable.
14. When sample results are transmitted to the Rad / Chem Director, he should verify that information relative to the time of sample collection is provided.

G. CHECKLISTS

1. None.

!! . TECHNICAL SPECIFICATION REFERENCES

1. None.

h v P RO'I d v OCT 141982 C

( 0 C.O 3 "

(final)

,,,, - , .....- ..-.._ .-_,, - , . ,_.,7e-7.__ _

i QEP 420-0 s~

i Ravision 4

} October 1982

. ID/IW,IX ONSITE TECHNICAL

, SUPPORT CENTER 420-0 Onsite Technical Support Center Rev. 4 10-14-82 420-1 l Onsite Technical Support Center Rev. 4 10-14-82 l

I i

i 1 i l

t J

! i i

i I

1 I

l l l 1

  • \ e' t' R Q '] i O OCT141982
0. c. u u.

i i

(final)

r-

]

o QEP 420-1 Revision 4 ON-SITE TECHNICAL SUPPORT CENTER October 1982 ID/1K A. PURPOSE The purpose of this procedure is to outline the method to activate and utilize the On-Site Technical Support Center during emergencies.

B. REFERENCES

1. GSEP Section 7.1.2. and GSEP-QCA Section 7.1.
2. NUREG 0578.

n C. PREREQUISITES

1. None.

D. PRECAUTIONS

1. None.

E. LIMITATIONS AND ACTIONS

1. None.

F. PROCEDL'RE

1. The Control Room is the primary on-site location from which initial actions are taken to identify, assess, and cope with an emergency.

Once an emergency has been declared, the On-Site Technical Support Center may be activated as necessary to support the Control Room.

2. The TSC may be activated for any emergency as necessary, but must be activatro for a GSEP Alert, site emergency, and general emergency.
3. The TSC is maintained for use by plant administration, technical staff, and engineering support personnel during emergencies.
4. The TSC is utilized for assessment of plant status and potential
J"-nite impact in support of the Control Room command and control function, and for implementation of on-site and off-site emergency actions.
5. The ISC is located in the Southeast corner of the protected area (old guardhouse).

. g / P R O'l d u OCT 141982 Q G.U.3 M

' QEP 420-1 i Ravicion 4

6. Plant drawings, design information, procedures, etc. are readily availgble in the TSC.

s

a. In accordance with NUREG-0696, the following documents are located in the TSC:

(1) Technical Specifications (2) Complete set of Station Procedures (3) Original and Updated FSAR (4) Iowa and Illinois Emergency Plans (5) Current year NRC Monthly Operations Reports (plant operating records)

(6) Current year On-Site Review Reports (7) As built M, B, and 4E drawings (a drawing index microfiche is located in the clerk's desk)

b. A SYFA terminal is located in the TSC that may be utilized to retrieve exposure records and environs data.
7. Adequate staffing and access control of the TSC will be as directed by the Station Director. The Station Director will direct those necessary technical and management personnel to man the TSC depending on the nature and extent of the emergency. He will assure adequate technical expertise is available in the TSC to provide the necessary technical support. The Technical Director would normally report to the TSC, and would assist the Station Director in directing the manning and access control of the TSC. The Thermal Engineer and Lead Nuclear Engineer would also report to the TSC, if available. Off-Site and NRC personnel ,
may be directed to report to the TSC as required.
8. Dedicated communications exist to the Co'ntrol Room, the NRC, the EOF,
the OSC, and the CECO GSEP Command Center in Chicago, and to state and local authorities (via the NARS phone).
9. Portable direct and airborne radiation monitors are available in the TSC. If the TSC becomes airborne, or if the radiation level in the TSC becomes excessive in the judgement of the Station Director or Environs Director, the accident assessment function of the TSC will be performed from the Control Room. Air packs or masks from the respiratory l equipment issue room should be utilized as conditions dictate.

i

.W r> RO'/ C

! OCT 141982

ouoe I

i ~>

QEP 420-1 Revision 4

10. If the TSC is relocated to the Control Room, only a limited number of

, persons sho61d relocate, due to the need to control access to the Control Room. Including the Station Director and Technical Director, this number should not ex.ceed ten. '

11. Upon activation of the TSC, t..rn on the Eberline PING-2 monitor located .

in the HVAC room.

G. CHECKLISTS

1. None.

I H. TECHNICAL SPECIFICATION REFERENCES

1. None.

I 4

i I

k i

l .uvaovde d

i.

OCT 141982 VuO , 1 (final) l

1 4

QEP 430-0  !

] Ravinica 3 I i

October 1982 1 ID/2Y,22 '

ONSITE OPERATIONAL 1 SUPPORT CENTER l

j 430-0

' i Onsite Operational Support Center Rev. 3 10-14-82 430-1 Onsite Operational Support Center Rev. 3 10-14-82 l

1 1

1 I

l

.Venoveo OCT 141982 Q. C. U. b. K i

(final) 1,_-_....._,-_.-_--..------------ -

e

, QEP 430-1 Revision 3

[ \

.. ON-SITE OPERATIONAL SUPPORT CENTER October 1982 ID/3Q A. PURPOSE The purpose of lhis procedure is to outline the method to activate and utilize the On-Site Operational Support Center during emergencies.

j B. REFERENCES

1. GSEP Section 7.1.3 and GSEP-QCA Section 7.1.
2. NUREG 0578.

C. PREREQUISITES

1. None.

. tid f l? OP/ d u D. PRECAUTIONS OCT1419d2

1. None.

Q u. U. 6 85 E. LIMITATIONS AND ACTIONS

1. None.

F. PROCEDURE

1. The Control Room is the primary on-site location from which initial actions are taken to identify, assess, and cope with an emergency.

Once an emergency has been declered, the On-Site Operational Support Center may be activated as necessary to support the Control Room.

2. The OSC may be activated for any emergency as necessary, but must be activated for a GSEP alert, site emergency, and general emergency.
3. The OSC at Quad-Cities Station is the meeting room adjacent to the TSC.
4. Operations support personnel report to the OSC during an emergency, from where they are dispatched for assignments or duties in support of emergency operations.
5. Dedicated communications exist between the OSC, the Control Room and to the TSC.

I

6. The Operations Director or his designee (Operating Engineer) will assume command of the OSC when activated. Operations personnel will man the OSC to the extent necessary, depending on the nature and scope of the emergency. Rad-Chem technicians will also report to the OSC.

\

v l

QEP 430-1 j s Revision 3 i

7. The 0SC should remain in close cournunication with the Control Room, j s such that actions taken are coordinated and carried out properly.
8. The OSC supervisor should coordinate the dispatching of operators arid should serve as the primary communicator in the OSC as his prime functions. It is his function to assure that the necessary manpower is assembled at the OSC and accounted for. He should also make use of the status board to inform all OSC personnel of the status of the emergency, i

G. CHECKLISTS

1. None.

H. TECHNICAL SPECIFICATION REFERENCES

1. None.

l 4

l l

i I

h ;'i' H O'I d u QCT 1 s 1992 u c.u a n (final)

\ , ._ _ ~

, _.:\.. !

'l QEP 430-0 Revision 3 j October 1982 l ID/2Y,2Z ONSITE OPERATIONAL ,

SUPPORT CENTER i 430-0 Onsite Operational Support Center Rev. 3 10-14-82 430-1 Onsite Operational Support Center Rev. 3 10-14-82 1

(

1 , ,

1 s

) 5 A

,\.

l s

l ,

r i

,\~  ;

! s .

s  !

j

\

s . <

'N' 't 1

\

-t

. t i;

. W if0'/do OCT 141982

, 4. G. U. a. tt.

, I (final) '-

_ , . _ _ . . n _. . . . _ ,.___._ _ _. ._. -. _ ._ _ _ . ,- _ _ _ _ _

4#

\I' I

?b

,s, QEP 430-1 Revision 3 ON-SITE OPERATIONAL SUPPORT CENTER October 1982 ID/3Q' A. PURPOSE The purpose of this procedure is to outline the method to activate and utilize the On-Site Operational Support Center during emergencies.

B. :: REFERENCES

1. GSEP Section 7.1.3 and GSEP-QCA Section 7.1.
2. NUREG 0578.

C. PREREQUISITES

1. None.

. h> P l? O'l d u D. PRECAUTIONS OCT 1419:32

1. None.

O p. U. h t' E. LIMITATIONS AND ACTIONS

1. None.

m F. -PROCEDURE l s./

1. The Control Room is the primary on-site location from which initial actions are taken to identify, assess, and cope with an emergency.

Once an emergency has been declared, the On-Site Operational Support Center may be activated as necessary to support the Control Room.

8

2. The OSC may be activated for any emergency as necessary, but must be activated for a GSEP alert, site emergency, and general emergency.
3. The OSC at Quad-Cities Station is the meeting room adjacent to the TSC.
4. Operations support personnel report to the OSC during an emergency, from where they are dispatched for assignments or duties in support of emergency operations.

4

5. Dedicated communications exist between the OSC, the Control Room and to the TSC.
6. The Operations Director or his designe'e (Operating Engineer) will assume command of the OSC when activated. Operations personnel will man the OSC to the extent necessary, depending on the nature and scope

, of the emergency. Rad-Chem technicians will also report to the OSC.

d

r- -

QEP 430-1

/ Ravision 3

7. The OSC should remain in close communication with the Contre! Room, such that actions taken are coordinated and carried out pro;":1y.
8. The OSC superviser should coordinate the dispatching of operators and should serve.as the primary communicator in the OSC as his prime functions. It is his function to assure that the necessary manpower is assembled at the OSC and accounted for. He should also make use of the status board to inform all OSC personnel of the status of the emergency.

G. CHECKLISTS

1. None.

H. TECHNICAL SPECIFICATION REFERENCES

1. None.

l l

\

i W P RO'f io OCT14 jog.2 1

l U. C. U. a. rt ,

i V

j ( final)

QEP 530-0 t- Revision 12 October 1982 l ID/2W,2X EXERCISES AND DRILIS 530-0 Exercises and Drills Rev. 12 10-14-82 530-1 Emergency Exercise Rev. I 12-16-80 530-2 Emergency Drills Rev. 7 10-14-82 i

1 530-3 Off-Shift Augmentation Drill Rev. 2 06-21-82 530-S1 Monthly NARS Drill Quad-Cities Station Rev. 4 10-01-82 530-S2 Monthly Test of the NRC Health Physics Network Rev. 1 01-05-82 530-S3 Monthly Test of tb NRC Emergency Notification System Rev. 2 10-14-82 I .}

1 l

t

.s r >. :a]v d o OCT 141982

\

c e . u.

(final)

QEP 530-2 Revision 7 EMERGENCY DRILLS October 1982

'/ ID/30 A. PURPOSE The purpose of this procedure is to list the required drills and their frequencies and to test specific facets of the Generating Station Emergency Plans.

B. REFERENCES

1. GSEP, Section 8.3.2.
2. GSEP, Section 7.2.
3. QEP 440-1, Emergency Communication Facilities.

O C.

QCTTa:ap'?

^ ' ' '

PREREQUISITES

1. None. '

D. PRECAUTIONS

1. None.

's E. LIMITATIONS AND ACTIONS N- - 1. The communications drill 1s rated satisfactory if the initiating party is able to transmit and receive acknowledgement for a brief exercise message to each of the agencies, designated in the site specific annex within 15 minutes of the simulated declaration. (Simulated declaration will be established immediately prior to picking up the NARS phone to initiate the drill.) The drill can be rated satisfactory even if NARS fails and backup systems are used to complete notification; however, corrective actions are required in event of NARS failure. The drill is rated unsatisfactory if the required transmission and acknowledgement is not completed within 15 minutes.

2. If communications equipment fails to operate properly, contact Illinois ESDA; phone (217) 782-7860 and the Corporate Command Center immediately following the drill. If the drill is rated unsatisfactory, immediately notify the Production Nuclear Duty Person during normal business hours, or the Production Nuclear Duty Person through the System Power Dispatcher during other hours in addition to initiating action to have the system repaired. An additional drill will be conducted immediately upon completion of equipment repairs any time a drill is rated unsatis-factory.
3. If the NRC health physics network fails, notify the NRC Region III office at (312)-932-2500.

s

(

QEP 530-2

, Ravision 7

4. If the NRC, Emergency Notification System phone fails, notify the NRC Operations Center at (202) 951-0550.

F.

%s

) PROCEDURE

1. Emergency drills, as described in GSEP, Section 8.3.2, GSEP, Section 7.2.,

and this procedure shall be conducted at a frequency as listed in the below table:

DRILL DESCRIPTION FREQUENCY

1. Communications Systems QEP 530-2 step F.2 ANNUAL
a. Microwave / radio communications GSEP 7.2.2 ANNUAL
b. NRC communications GSEP 7.2.4 ANNUAL
c. Station communications GSEP 7.2.2 ANNUAL
d. N.A.R.S. QEP 530-2 step F.3 MONTHLY GSEP 7.2.1
c. NRC health physics network GSEP 7.2.4 MONISLY QEP 530-2 step F.7
f. NRC Emergency Notification GSEP 7.2.4 System QEP 530-2 step F.8 MONTHLY
2. Environmental Monitoring Drill QEP 530-2 step F.4 ANNUAL GSEP 8.3.2.3
3. Medical Emergency Drill QEP 530-2, step F.5 ANNUAL GSEP 8.3.2.5
4. Health Physics Drill QEP 530-2, step F.6 SEMI-ANNUAL i GSEP 8.3.2.4
2. Communications drill.

l a. To verify communications procedures and communications equipment that would be required in the event of a major accident, the capability to communicate on the microwave / radio communications, NRC communications, station communications and the N.A.R.S communi-cations systems will be tested during the annual communications drill.

l r . '\:C'! C u l OCT 141982

'%j Q G.4 L 2. U,

QEP 530-2

, R vision 7

b. Conduct of test.

j Standard messages will be transmitted from key locations to verify that information transmitted in the nuclear accident report and

('- environmental assessment formats can be accurately transmitted and readily understood. Each message will be independent and will not relate to other messages. The communicators who ultimately receive the messages will be requested to return the completed message forms so that a comparative evaulation can be made,

c. Critique.

The communications drill checklist will be used as a guide while the drill is in progress. A verbal critique of communications procedures will be conducted immediately following the drill. A written critique will be provided for records.

d. Standard.

The drill is rated satisfactory if:

(1) The Exercise Nuclear Accident Report message is accurately received by the CCC, State EOC's and REAC, and local EOC's within 15 minutes from the simulated declaration of an emergency.

(2) The environmental assessment messages are accuratery received by Illinois REAC. ,

(N-- (3) Federal Emergency Response agencies are contacted by any facility.

(4) Communications by.either primary or backup means is established from:

(a) the control room to CCC, SPS, TSC, EOF, EOC and REAC; (b) TSC to EOF and CCC; i

l (c) EOF to TSC, EOC, CCC, SPS and REAC; l

(d) CCC to TSC, EOF, EOC and REAC; (e) Field assessment teams to EOF, TSC or CCC.

The drill is rated unsatisfactory if any of the above standards are not achieved. Corrective action is required if any primary or backup system fails to operate properly.

l 3. N.A.R.S. Communications System.

. t . r' G O 9 c t..

I b

s-. u c ., n

QEP 530-2 Revision 7

a. The de.dicated Nuclear Accident Reporting System (NARS) communica-tions is the primary communication system to be tested. If NARS s does not enable understandable communication, available backup

) system, to include dial phone, will be employed to contact desig-

'd nated agencies to demonstrate communications procedures to be used in the event of NARS failure. Each station will initiate a monthly communications drill to verify the capability to notify designated company, state and local agencies if a general emergency was declared. Initiation capabilities from the EOF, TSC and Control Room will be demonstrated periodically.

b. Conduct of test.

The drill will be conducted in the following manner using QEP 530-SI.

(1) Establish and record declaration time.

(2) Activate NARS:

(a) Remove handset.

(b) Dial required code (23).

(c) Confirm stations on line.

NOTE s

g The hand set button must be pressed when 1 transmitting.

L)

(3) Transmit message test: "THIS IS A TEST. THIS IS (NAME OF FACILITY). STAND BY FOR NOTIFICATION DRILL. THE

('SIMULATEDDECLARATIONTIMEIS(DECLARATIONTIME). THE CURRENT

' TIME IS (CURRENT TIME). STAND BY TO ACKNOWLEDGE RECEIPT OF THIS EXERCISE MESSAGE BY STATING YOUR AGENCY AND INITIALS."

(4) Call roll of activities (site specific annex) and record initials of acknowledging individual.

t (5) Upon completion of acknowledgements, inquire if anyone has not been called and close the conference call.

(6) Contact agencies not acknowledging the drill by backup communi-cations means.

(7) Record times of all acknowledgements.

l -

l (8) Initiate corrective actions if required.

.r, now

) GCT1 !1E82 J

o v. o ,,

QEP 530-2 Rsvision 7

c. Agencies to be notified:

('~' Illinois Emergency Services & Disaster Agency k,_,}/ Illinois Department of Nuclear Safety

  • Rock Island Communications Rock Island E.S.D.A.*

Scott County Sheriff, Davenport, Iowa Corporate Command Center

  • System Power Supply Clinton County EOC Iowa Office of Disaster Services Whiteside County EOC*

Whiteside County Sheriff NOTE Extensions with an asterisk are not manned 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day. Successful communications with all other agencies constitutes.a success-ful test, if during other than norual working hours.

4. Environmental Monitoring Drill.

, a. Field monitoring teams will be selected to operate under the i direction of a Rad / Chem Director or an Environs Director from the l

station. Two teams will be utilized unless otherwise specified.

l A situation will be portrayed to indicate a simulated release based on actual meteorological conditions at the time of the drill. The teams will conduct sampling of water, grass or other vegetation, soil, and air and conduct actual field monitoring of samples. The controller accompanying each team will provide simulated readings to indicate the level of radiation expected from the plume at that location. Teams will record and report findings to the Environs Director in the EOF using radio or backup communications. Samples will be transported to and analyzed in the station laboratory facilities. Procedures used in analysis will be evaluated.

The corporate Environmental Center will be activated and its personnel will be required to process and analyze the simulated field readings and laboratory findings. Communications between field personnel, the Environs Director, and the environmental center will be tested. A controller will judge the performance of corporate personnel to support field activities and reach the appropriate recommendation for protective action.

O P RO'I d o ae o.

QEP 530-2 Revision 7

b. Responsibilities.

p The CECO. General Office will schedule, direct, and evaluate the (N drill. Environmental Center participants will be selected by the General Office from a list of qualified personnel. The Generating Station will:

(1) Provide two qualified individuals to act as controllers and to assist in preparing the drill.

(2) Provide a list of personnel designated as qualified to perform duties of Rad / Chem Director, Environs Director, and Environs Group field team member. Provide selected personnel that are reasonably available to participate in the drill.

(3) Provide communication, protective, sample gathering and transportation equipment to conduct the drill.

(4) Provide EOF and laboratory facilities to conduct the drill.

c. Critique.

A verbal critique will be conducted at the conclusion of the drill by the control team from the General Office and the station.

Following the verbal critique, the control team will meet to provide comments for the written critique to the General Office

.i representative. The written critique will be provided to the station after review at the General Office.

5. Medical Emergency Drill.

,a. Commonwealth Edison employs the Radiation Mangement Corporation (RMC) to provide procedures, training and drills for onsite and

. off-site organizations dealing with emergency medical treate nt.

RMC will conduct the training and supervise medical and decontamina-tion aspects of the drill. CECO will supervise GSEP related notification aspects of the drill. The drill will normally be conducted on the day following the training sessions. Victims simulated to be contaminated and injured will be used as controllers.

The drill will include treatment and decontamination of the victims from the time the accident is reported until the hospital has decontaminated and treated the simulated patients. The drill will

( be followed by a critique.

b. Responsibilities.

I

~00T1419s2 0tu

QEP 530-2 Revision 7 The CE,Co General Office will:

(1) Prepare a general schedule for the drill.

(2) Provide backup assistance 'in concluding local scheduling when needed.

(3) Provide an observer to control and evaluate portions of the exercise outside of RMC's area of expertise.

(4) Provide written and oral critique comments.

The Generating Station will:

(1) Arrange exact dates of drill with RMC, CECO. General Office and off-site support agencies.

(2) Assign personnel to participate in on-site training.

(3) Assign personnel to participate as victims under RMC direction.

(4) Participate in the drill.

Radiation Management Corporation will:

(1) Conduct a training program.

(2) Control the medical portion of the drill.

(3) Evaluate the drill with qualified medical and health physics i

controllers.

(5) Conduct an oral and written critique.

I

c. Corrective actions. -

Deficiencies in team or individual actions during the drill will be corrected by instruction during the critique. Deficiencies in equipment or physical arrangements discovered during the exercise will be evaluated by RMC, CECO., and off-site support ager.cies and resolved following the written report.

. \ ,* s ' 0 0's ;5 O b b [ !. d N$

O. C. U. S H.

s

l QEP 530-2 Revision 7

6. Health Physics Drill.
a. One team of Rad / Chem Technicians will be selected to perform g direct monitoring and sample collecting functions. Controllers

\w_ / will provide the initial situation and meter readings to simulate elevated radiation levels. The team will report elevated measure-ments in accordance with station procedures. Airborne and liquid samples collected will be analyzed in accordance with station procedures. Results of the analysis will be recorded. At least once each year the drill will include obtaining and analyzing an actual liquid sample from the plant. The controller will specify collection of a sample that is required to be analyzed for normal plant operations whenever possible. Results of the analysis will be processed in accordance with normal procedures.

b. Responsibilities.

..'.'i?C"/du The CECO General Office will:

OCT 141832 (1) Schedule, direct and evaluate the drill.

u. G_ U. s n The Generating Station will:

(1) Provide a technically qualified individual to act is a controller and to assist in planning the drill.

(2) Provide a list of qualified technicians. Provide 's elected personnel to participate in the drill.

\s_/ (3) Provide equipment and facilities to conduct the drill.

c. Critique.

A verbal critique will be conducted at the conclusion of the drill i by the controllers from the General Office and the station.

Following the verbal critique, the control team will discuss comments for the written critique. The written critique will be provided to the station after review at the General Office.

7. NRC health physics network.
a. The NRC health physics network provides dedicated communications between the Station and NRC headquarters in Bethesda, Maryland, and Glen Ellyn, Illinois.
b. Phoner are located in the Rad-Chem Supervisor's office, the on-site NRC office, and the emergency operations facility.
c. Conduct of test. The drill will be conducted in the following manner using QEP 530-S2:

(1) Choose one of the three phones available. Each phone must be tested once every three months, on a rotating basis, testing.

one phone per month.

d

QEP 510-2 Ravision 7 (2) Pick up the receiver and dial 22. This number should reach NRC headquarters in Bethesda, Maryland. Pick up the receiver and dial 23. This number should reach Region III headquarters

('~'s

( in Glen Ellyn, Illinois.

NOTE No dial tone or ringing will be heard.

(3) The test message should be:

This is a test. This is the Quad-Cities Nuclear Power Station.

Please verify that communications have been established by stating your initials.

(4) Should a test be unsuccessful, the NRC shall be notified and one of the other HP network phones shall be tested to verify that communication is possible. NRC Region III should be notified so that appropriate corrective actions may be taken.

8. NRC Emergency Notification System (red phone).
a. The NRC Emergency Notification System provides dedicated communi-cations between the station and the NRC Operations Center in Bethesda, Maryland.
b. Phones are located in the on-site NRC office, the Emergency Opera-

, tions Facility, the Technical Support Center, and the station r Control Room.

1 Q

c. Conduct of. test. The drill will be conducted in the following manner using QEP 530-S3:

~

(1) All phones must be tested each month.

(2) Pick up the receiver and wait. The phone should automatically reach NRC headquarters in Bethesda, Maryland.

(3) The test message should consist of:

l This is (NAME) from the Quad-Cities Nuclear Power Station. I'm calling from our (FACILITY NAME) to test the Emergency Nctification System. Please acknowledge the receipt of this message by stating your initials.

l (4) Record the initials of the call receiver on QEP 530-S3.

(5) Should a test be unsuccessful, the NRC Operations Center shall be notified so that appropriate corrective actions may be taken. The Operations Center number is (202) 951-0550.

. ' e ' .# i$C'/ d v

'm OCT 14 i992

._. .; 1, s a

- . . _ . _ . . . - . . . . - . _ . . _ . . . . . -. ~ . ~ . . .- - . .. . . . _ . . - - _ . _ _ .

QEP 530-2 Revision 7 i

G. CHECKLISTS i~

l .

i

r
1. QEP 530-51, Monthly NARS Drill Quad-Cities Station.

[ 2. QEP 530-S2, Monthly Test of the NRC Health Physics Network.

i 3. QEP 530-S3, Monthly Test of NRC Emergency Notification System.

i H. TECHNICAL SPECIFICATION REFERENCES i

i

1. None. '

i i

I t

i i~

i 1

! l i j i  !

+

.F l t 1 ,

l I

1 i

j .W i:e / u i OCT1419<32 i t l 0Guao  !

i (final)  !

i I

-mewe1r evyw e-r ww-+mr ,r w--s me --m,r,-wwa me m -r^

e E

QEP 530-S3 Revision 2 MONTHLY TEST OF THE NRC October 1982 EMERGENCY NOTIFICATION SYSTEM s

19/4Z Date:

Time:

i Phone Location:

NRC Emergency Notification System Telephones to be tested are located in the Technical Support Center, the Emergency Operations Facility, and the Control Room. Each of these phones is to be tested every month.

The test shall consist of the following:

Pick up the receiver and wait. The phone should automatically reach the NRC Operations Center in Bethesda, Maryland.

The test message should consist of:

1 This is (NAME) from the Quad-Cities Nuclear Power Station. I'm calling from our (FACILITY NAME) to test the Emergency Notification System. Please scknowledge the receipt of this message by stating your initials.

, INITIALS Should a test be unsuccessful, the NRC Operations Center shall be notified so that the appropriate actions may be taken.

SUCCESSFUL COMMUNICATIONS YES NO i

Signatare a- COMMENTS i

L ' '*,i O'i u a 0CT1419d?.

uu un (final) s

~~^ = :: ^r==..: ~

- ^ -

=:. 2- . .- -.-.. 2.- . - . : :T,7 - . _ = . - -

DENTON QAP 1100-T5 e Revision 6 STATION PROCEDURE REVISION COVER SHEET October 1981 i

ID/1X .

Revisions .De citption- gg

-e~

3 -}6VY a& & I Off 620-r1 LC1//

/d '/

m&* 620-1 I

l

)

Chapter Procedure u O W == tor,, Revision  ;

\  !

() .

.0 l .

~~~ - ~

i This procedure is required to be implemented prior to l

because of


(

DRArt REVIEW FIN &I. APPROV43 m / p-/) & %--

Tech. Staff Supezvisor Date l Dept. 8,,4 D c NEM Date Department Head

~

Date nh /d .: o Date Tech. Staff Q ervisc.-

. W 10fi3 Originator Date Asst. Supt. A h /8t/4/ ~Date l . ~ ,x .ACIBORIZATIOR .

...v..,.

,..,.p. . . < e . . n : . ~- .

. . .. u + ~. . . - .c.>.. a . y .~n.~: ,l'

/

St'ation Superint ent ny /ef./WY2 .

fe:tive Date

{

' ~

INSTRUCTIONS FOR REVISION INSERTION'

. . t REMOVE '

  • INSERT .

@EP ho-c eat 1 .

ne W -0 &Y QQ &QQ.( g&~t/ 3 QW h O 'I qtp 400-71 M V-l l

.-.. =.. . ........ ... . . -....

l --

I REVISION RECEIPT FORM l'

y . Pleast. sign. and, date below,.. and : return: this sheet to'. the;0fficer. Supervisor . . .

Quad Cities Station. Your Station Procedure copy number is uu .

l AFFRUV'c 0 l Signature Date l (final)  !!OV 6 1981 m

-. _ _ . , . . - ~ . -- -  :.. - _ _ - ,,_ . .-- :: - - -. ,=.a.. - - - - . - - - - - - - .

=. ,

QEP 620-0 Revision 4 October 1982

,- ID/3A,3B '

RECOVERY

,~

4 620-0 Recovery Rev. 4 10-14-82

- a. . .. <w .

620-1 Recovery Following GSEP Emergencies Rev. 4 10-14-82 620-2 l Emergency Pe.rsonnel Dose Limits and Radiological. Controls.for. . ,

.' ~

i Rescue and Recovery Operations Rev. 2 08-10-81 i

620-T1 .

Corrective Action Items for Plant Recovery Rev. I 10-14-82

. . .. s s . . , . -

1, 1

e .

. . 4 - . , . . . < . . . ., ..' , 4 ~.:

. e v ,

..> .-..- .e-

. y . .i,..w..m: c . e,+ ..: e ' s ; - ~ me. m :.~ < + : :: ~ m . * < > ~ :a a~

s- l t

l t

hvPROYE0

- OCT141982

'.: c.'. ,1 y , ,,,,-

- ~ _ , . . . . s ;. * ~ , sy - , + * . -

<O~. c -. ..

' . Q. c o. s R. - ~ ::< -

(final)

3

/

QEP 620-1 Revision 4 RECOVERY FOLI,0 WING October 1982 GSEP EMERGENCIES

. . .- m. . .

c , ...

ID/3R A. PURPOSE The purpose of this procedure is to outline the steps to be taken for recovery following GSEP emergencies.

B. ' '

REFERENCES

1. 10CFR20.101. ,

i

2. 10CFR50, Appendix E.
3. .QRP 1000-1, Radiation Control Standar.ds.
4. QEP 620-2.

C. PREREQUISITES

1. None.

. D. PRECAUTIONS f

N ' 1. Plant recovery to cperational' status is an event-oriented concept.

5

, Any considerable degradation of the plant as a result of fire, explo-

, sion, etc..uay require many unfores.een procedural steps,or procedures. ,

E. @ ITATIONS AND ACTIONS s,

. < , ,: g , WebQ 'procedureif andt sddr'ess' the specifie ' degradations"o'f' plant l and environs that are present as a result ,of the event. Therefore, ,

j recovery procedures shall be written and processed as special Operating or Maintensace procedures. They shall receive the On-Site Review in ,

accordance vith normal station procedures. )

~

'2. The'need for s'pecific recovery procedures vill be determined by the '

Operations Director, the Technical Director, the Maintenance Director, the Coman.1 Center Director and other advisory agencies (i.e. NRC or ESDA.),

l 3. The 'Iechnical Director shall coordinate the writing and processing of the special' procedures identified as necessary to accomplish recovery.

l Durin'g 'an emergency situation, a repeat exposure to 'any overexposed 4.

, individual (greater than 3 Rem /qtr.) should be prevented.

l

.T P P RO'/ tid l ./

,v- c, OCT 141982 v.

,. ..;. ,. . ',-- s . . , . - ,

. .i s Q. C. O. S. H.

i

/ QEP 620-1 Revision 4

'-"' F. PROCEDURE

1. Recovery operation shall be done in accordance with predetermined plans.
2. All recovery operations shall be carefully documented.

j 3. Caution shall be taken to minimize personnel doses.

a. In no cases shall doses exceed those specified for emergencies in QRP 1000-1 and QEP 620-2.
b. An a'ttempt shall be made .to maintain doses within limits specified in 10 CFR 20.101.
4. A list of plant problems as a result of the event should be compiled so that priorities can be developed for corrective actions.

G .' CHECKLNT5

~

1. ,

QEP 620-T1, Corrective Action Items for. Plant Recovery.

H. TECHNICAL SPECIFICATION REFERENCES 1 None.

i 1

\

b

.e4 :v -,.,,,..,:.. .  ;; ;e c r e .- , .. . . _ - - .,, ; . ,. .,.s. ,; . .; . .,,t . ,

a.{<

f 4

e . , :6

. 4 f

l l

l I

.W P RO'li o

' 0CT 1.1.11932, ,

[ .. - ....e

. ,: x c.  : , .., 3. , . . . ., .s _ . ,., . , . .

Q. C. O. S. tt l (final)

. _ - . __. . , , _ . . . _ _ . . . . _. _. .._.2

/

ID/5J

  • CORRECTIVE ACTION ITEMS QEP 620-T1

,O FOR PLANT RECOVERY Revision 1

  • 1 = need ASAP 2.= needed. for . reactor shutdown /cooldown . .

. s,. .

3 = prior to unit start-up DATE/ TIME OF PROBLEM CORRECTION OCCURRENCE DESCRIPTION PRIORITY *

'v -

., . . .s . . ..,,....-. . , , . . .. , . . , , . . ...c.

, . . s. .  ;. ., . . w , q 4

-]

l l

l I

6

.iP P RO'/ d D

n. . . . . .::- < . < . . . . -: ,y. ,

.v,.. .

.g97 3 g.39p.u: - ,

a i (final) 0. C. O S. K i

l l *

., _ . . . ~ . . ._. _. . . - , _ .

^-

' -' : . : ._^ ::=:::: :_ ;^. ~2.~;  : 2^. :~ ~ L:2^_ ~7::::::. ~. ~ ~.;^^ ^ ^.~;:^ ~ '-^~ * ~ ^ ^ ^ ~ ~ ' ' ' ~ ~ ^ ~ ^-- ' ' "^~ ~

4 QEP 700-0 i Revision 4 October 1982 i ID/2I,2J TELEPHONE DIRECTORIES l 700-0

, Telephone Directories Rev. 4 10-14-82 700-T2 l Employe List Rev. 3 01-18-82 2

700-T3 Supplemental Phone Listing Rev. 2 10-14-82 i

i 1

t  ;

I

~

l

l i

i i,

i i

I .

l l

i

.i _

. s .' r> l? O'/ d i) i

! OCT1 4 WJ2 r

O G. U. s. H l

i l

( final) l I

ew- -m_ _-.-+r-,_ -w.-.,-, -

v

- QEP 700-T3 Revision 2 SUPPLEMENTAL PHONE LISTING October 1982 ID/1F This listing supplements the GSEP phone number listing as given in the Quad-Cities Station Directory and in the Local Support Agency Directory.

Agency Phone No.

Department of Energy (RAT) 312-972-4800 Illinois Dept. of Public Health 217-782-6550 U. S. Coast Guard (St. Paul) 612-725-7452 NRC Region III 312-932-2500 Sist Ordinance Unit, Ft. Sheridan,IL 312-926-2081 F.B.I.

309-786-2663 Army Corps of Engineers 309-788-6361 NRC (Washington) 301-492-7403 Rock Island County Sheriff 309-786-2100 Iowa Emergency Services 515-281-3231 Illinois Emergency Services 217-782-7860 Cordova Police 309-654-2600 Albany Police 309-887-4370 Outside number to EOF 309-654-2662 (refer to QEP 460-T1 for additional numbers) i Outside numbers to TSC 309-654-2559 309-654-2508 309-654-2538 309-654-2564 309-654-2592 i

i A deo' icv OCT 141982 LL C u. c n r

' (final) l