ML20070H995

From kanterella
Jump to navigation Jump to search
EDS-NUTECH Interface Control Instructions, Revision 0
ML20070H995
Person / Time
Site: Dresden, Quad Cities, 05000000
Issue date: 09/30/1982
From: Tschudi W
NUTECH ENGINEERS, INC.
To:
Shared Package
ML20070H978 List:
References
IEB-79-14, PROC-820930, NUDOCS 8212270307
Download: ML20070H995 (22)


Text

ATTACHMENT 2 l 4 , 1 EDS NUCLEAR INC.

Y ~.

INTERFACE CONTROL INSTRUCTIONS CLIENT: Commonwealth Edison Company PROJECT: Ouad Cities (Units 1 & 2) and Dresden (Units 2 & 11 Nucloar Statinns 0593-101. 301; 0594-101, 301 JOB NUMBER (S):

REVISION RECORD DA QA REVIEW APPROVED REV. ggsUED PREPARED

~

0 9/82 k).TA t b d i l

I DISTRIBUTION:

1. NUTECH - T. Victorine
2. CECO - G. Frizzell
3. W. F. Tschudi
4. O. W. Zuniga
5. C. Y. Wong
6. T. C. Chen i 8212270307 821216 pg3g 3 g- 4

{DR ADOCK 05000

EDS - NUTECH INTERFACE CONTROL INSTRUCTIONS CLIENT: Commonwealth Edison Company PROJECT: IE Bulletin 79-14 Quad Cities Units 1 and 2 Dresden Units 2 and 3 JOB NUMBERS: 0593-101, 0593-301, 0594-101, 0594-301 j

l.0 Scope of EDS Nuclear Services EDS will interface with NUTECH to obtain data necessary to account for the effects of interface loads on safety-related piping within EDS's scope. The interface will also involve pipe anchor location and loads transmittal to NUTECH. This interface control instruction is to address the interface re-quirements between the two organizations. A complete listing of the piping t subject to this interface is attached (Attachment 1). This listing identi-fies the technical data required. The information that will be transmitted between organizations is generally as follows-i From NUTECH to EDS From EDS to NUTECH  ;

e 79-14 Loads on EDS Piping Bechtel Walkdown Information  ;

Pipe Anchor Locations Support Modification Drawings Support Loading Pipe Anchor Loading ,

EDS will use the data transmitted by NUTECH as design input. It's use will -

be controlled according to the EDS Nuclear QA program requirements. (QAP l 2.1,2.2,3.1) EDS will consider all data received from NUTECH as final,  !

unless otherwise noted. See Paragraph 4.0 for the technical data require- i t ments.  ;

Data transmitted between EDS and NUTECH will be formally transmitted and t verified by receipt acknowledgement. Revision level of the information l will be controlled. Initial issue of data will be Revision 0; any subse-  ;

quent revisions will be Revision 1, 2, etc. NUTECH and EDS will be re-  ;

sponsible for transmitting all revisions of the interface data to the other i organization. NUTECH drawings will be issued with alphabetic revision letters. EDS drawings will be issued with numerical revision numbers. +

Data transmittal forms will use revision numbers.  ;

l 2.0 Project Interface Personnel -

i EDS Nuclear NUTECH i

Project Manager - W. F. Tschudi Large Piping Project Manager  !

San Jose Office (SJ0)  :

Piping Analysis Project T. J. Victorine  :

Engineer - C. Y. Wong ,

Small Piping Project Manager  !

Support Design Project Chicago Branch Office -  !

Engineer - 0. W. Zuniga G. T. Seeley  !

Page 2 of 4 ;

2.0 Project Interface Personnel (cont'd)

NUTECH

Engineering Managers e Large Piping Dresden (SJ0) - T. P Khatua ',-

4 Quad Cities (SJ0) N. A. McClean --

e Small Piping (CB0) - J. W. Muffett Support Design Project- Engineer (SJ0) - T. W. Soo Hoo

.Small Piping Project Engineer (CB0) - J. A. Gavula 3.0 Communication Responsibilities 4

Formal Comunications - All correspondence is to be signed by and addressed to the respective project manager for this interface. All design input will be transmitted by letter. EDS letter numbers will use serial numbers 0590-003-xxxx. All incoming and outgoing cor-respondence will be controlled as required by the EDS QA program.

(QAP2.2,3.1) A receipt acknowledgement for data transmitted by EDS is required. Mr. G. Frizzell and Mr. R. H. Mirochna of Com-

monwealth Edison Company will be copied on all formal data trans-j mittals.

i l Informal Communications - All telephone conversations, telecomunicated i

data, material distributed at meetings, etc. will be confirmed by for-mal transmittal within 30 days. EDS internal distribution of design input shall be in accordance with written interface instructions in ,

effect.

4.0 Technical Interface Requirements

, Attachment i lists all of the piping affected in this interface. This l listing will be used to track schedule commitments and technical data required. As such it will be revised independently from this inter-t face instruction.

3 Attachment 2 consists of sample forms which will be utilized to trans- i mit piping displacement or loading information. All piping analyses -

input data will be controlled through the use of these forms.  :

t

! Attachment 3 consists of a sample format which will be utilizied i to transmit piping support load information. This format will be utilized for load information supplied to EDS for existing supports and for load information supplied to NUTECH for anchor loading.  ;

I Page 3 of a

, _ . . , . . . - _ , _ . _ . . _ . - _ , _ , . - _ _ . . _ . . . _ . _ . _ . , _ _ . . ~ . _ _ _

4.0 Technical Interface Requirements (cont'd) 14UTECH will supply the following load combinations for support eval-uation:

Maximum level A, B, C, D Loads and Displacements Gravity Load Thermal Load 5.0 Records The record retention of design input shall be the responsibility of the organization which produces the design input.

Page 4 of 4

^ ~

1.

4 O

l ATTACHMENT 1 i

~

_ .._, , , _ ,_ . . , . . . . , , ,_.,.- . ,, 7.,-.w m r

Attachment 1 -

INTERFACE DATA REQUIRED PLANT: Quad Cities Unit 1 . ,

Interface Need Safe Nutech EDS EDS Line Numbers Data Req'd Anchor Shut- Data to Analysis Design EDS P&ID Branch Pipe Run Pipe TAM SAM Location down EDS Completion Completion Problem SR-34-1 -

1-1603-18" No No x 9/7 10/20 h 12/31 Ql-PSUPP-01C-SR-37/SR-39 l-1032-3" N/A No No N/A -

9/1 -

Ql-RilRS-04B(C))

SR-37 1-1032A-2" l-1006A-12" N/A N/A N/A -

9/17 h -

Nutech will do

, SR-37 1-1032B-2" l-1006B-12" N/A N/A N/A -

9/17 -

this line 7

SR-37/SR-39 l-1079-3" N/A No No N/A x N/A 9/17 -

QL-RilRS-13B(C) l Nutech will do l SR-37 1-1032C-2" l-1006C-12" N/A N/A N/A x N/A 9/17 h -

this line SR-37 1-1032D-2" l-1006D-12" N/A N/A N/A x N/A 9/17 -

SR-37 1-1033A-3" l-1006A-12" x x N/A x 10/15 n n Ql-RilRS-02B(C)

SR-37 1-1033B-3" l-1006B-12" x x N/A x 10/15 Q1-RilRS-02B(C)

SR-37 1-1034A-3" l-1006C-12" x x N/A x 9/30 Ql-RiiRS-02B (C)

SR-37 1-1034 B-3" l-1006D-12" x x N/A x 9/30 11/3 10/31 [12/10] Ql-RIIRS-02B(C)

SR-37 1-1035A-3" 1-1016C-14" x x N/A x 11/15 Ql-RilRS-02B(C)

(11/22 SR-37 1-1035B-3" l-1016D-14" x x N/A x 11/15 @ Final) Ql-RilRS-02B(C)

SR-37 1-1054A-3" l-1016A-14" x x N/A x 11/15 Q1-RilRS-02B(C)

SR-37 1-1054B-3" 1-1016B-14" x x N/A x 11/15 V V Ql-RilRS-02B (C)

SR-39/SR-46 1-2340-4" N/A No No x 9/9 -

Ql-IIPCI-04B(C) 11/15 h SR-39 l-1036-3" l-1010-18" x x N/A x 9/30 11/3 10/31 [12/10] Q1- Ril2S-02B(C)

(11/22 Final)

NOTES: h EDS anchor loads to NUTECil [ ] EDS re-evaluate re-issue Revision 0 h Preliminary data by 10/15 supports due to Nutech 9/14/82 h EDS provide isometric / support sketches S 1 6

INTERFACE DATA REQUIRED PLANT: Quad Cities Unit 1 ,

Interface Need Safe Nutech EDS EDS Line Mumbers Data Req'd Anchor Shut- Data to Analysis Design EDS P&ID Branch Pipe Rua Pipe TAM SAM Location down EDS Completion Completion Problem A

SR-39 l-1011-4" l-1009B-18" X X N/A X 9/30 A Ql-RHRS-06B(C)

SR-39 1-1065-3" l-10128-16" X X N/A X 9/30 Ql-RHRS-06B(C)

SR-39 l-1066-3" l-1012A-16" X X N/A X 11/15 11/5 9/30 [12/10] Ql-RHRS-06B(C)

SR-39 l-1067-3" l-1010-18" X X N/A X 11/15% Ql-RHRS-06B(C) l-1025-20" V V SR-39 l-1068-3" X X N/A X 11/15) Ql-RHRS-06B(C)

SR-39 l-1086-6" l-1010-18" X X N/A 10/30 12/17 12/31 Ql-RHRS-14B(C)

SR-46 1-2311-4" l-2301-16" X X N/A 10/30 12/17 1/31 Ql-HPCI-02B(C)

SR-46 1-2325-6" l-2302-16" X X N/A 10/30 17/10 3/31 Ql-HPCI-OlB(C)

(9/17) @

NOTES: h EDS anchor loads to NUTECH [ ] See Sheet 1 Revision 1

@ Preliminary data by 10/15 9/28/8

@ EDS provide isometric / support sketches Sheet 2 of 6

~

PLANT: Quad Cities Unit 2 - .

INTERFACE DATA REQUIRED Interface Need Safe Nutech EDS EDS Anchor Shut- Data to Analysis Design EDS Line Mumbers Branch Pipe Run Pipe Data TAM l Reg'd SAM Location down EDS Completion Completion Problem l P&ID SR-76-1 -

2-1603-18" No No X 9/7 10/20@ 1/31 Q2-PSUPP-OlC SR-78/SR-79 2-1079-3" N/A No No X X 10/15 11/15) [12/10] Q2-RHRS-08B(C)

SR-79 2-1032C-2" 2-1006C-12" X X N/A X 10/15 11/1 @ [12/10] 02-RHRS-08B(C)

SR-79 2-1032D-2" 2-1006D-12" X X N/A X 10/15 .

[12/101' Q2-RHRS-08B(C)

SR-79/ 11/15)h (9/17) ,

SR-81-1 2-1032-3" N/A No No X 10/15 11/15 [ 12/10] Q2-RHRS-04B(C) ]

SR-79 2-1032A-2" 2-1006A-12" X X N/A 10/15 9/17 11/15 [ 12/10] Q2-RHRS-04B(C)

SR-79 2-1032B-2" 2-10068-12" X X N/A 10/15 @ 11/15 [ 12/10] Q2-RHRS-04B(C). f SR-79 2-1033A-3" 2-1006A-12" X X N/A X 10/15 A A Q2-RHRS-02B(C) l SR-79 2-1033B-3" 2-10068-12" X X N/A X 10/15 Q2-RHRS-02B(C) 10/15 11/5 9/30 [12/10] Q2-RHRS-02B(C)

SR-79 2-1034A-3" 2-1006C-12" X X N/A X SR-79 2-1034B-3" 2-1006D-12" X X N/A X 10/15 s/ v 02-RHRS-02B(C)

^ ^

SR-79 2-1035A-3" 2-1016C-14" X X N/A X 11/15 Q2-RHRS-028(C)

SR-79 2-1035B-3" 2-1016D-14" X X N/A X 11/15 @ 9/30 [12/10] Q2- E -02B(C) >

11/5 SR-79 2-1054A-3" 2-1016 A-14" X X N/A X 11/15 Q2-RHRS-02B(C)

']

SR-79 2-1054B-3" 2-10168-14" X X N/A X ll/15j V N/ Q2-RHRS-02B(C)

SR-79/

SR-81-1 2-1025-20" x 10/15 N/A 2/31 Q2-RHRS-05C SR-81-1/

SR-87 2-2340-4" N/A No No X X 10/15 11/15@ 3/31 Q2-HPCI-04B(C)

NOTES: [ ] See Sheet 1 Revision 1

@ EDS anchor loads to NUTECH 9/28/82

@ Preliminary data by 10/15

@ EDS provide isometric / support sketches Sheet 3 of 6

INTERFACE DATA REQUIRED PLANT: Quad Cities Unit 2 Interface Need Safe Nutech EDS EDS Line Numbers Data Reg'd Anchor Shut- Data to Analysis Design EDS P6fD Branch Pipe Run Pipe TAM SAM Location down EDS Completion Completion Problem SR-81-1 2-1036-3" 2-1010-18" X X NA X 10/15 11/5 9/30 [12/10] Q2-RHRS-02B(C)

SR-81-1 2-1011-4" 2-1009A-18" X X N/A X ^ h A Q; ;' HRS-06B(C)

SR-81-1 2-1065-3" 2-1012A-16" X X N/A X Q2-RHRS-06B(C)

SR-81-1 2-1066-3" 2-10128-16" X X N/A X 10/15 11/9 9/30 [12/10] Q2-RHRS-06B(C)

SR-81-1 2-1067-3" 2-1010-18" X X N/A X Q2-RHRS-06B(C)

SR-81-1 2-1068-3" 2-1025-20" X X N/A X v y 3r Q2-RHRS-06B(C)

SR-81-1 2-1086-6" 2-1010-18" X X N/A 10/30 1/14 [2/28] Q2-RHRS-09B(C)

SR-87 2-2311-4" 2-2301-16" X X N/A 10/30 1/14 [2/28] Q2-HPCI-02B(C)

SR-87 2-2325-6" 2-2302-16" X X N/A 10/30 1/14 2/28 Q2-HPCI-01B(C)

(9/17) @

NOTES: O EDS anchor loads to NUTECH [ ] See Sheet 1 Revision 1

@ Preliminary data by 10/15 9/ 28/82 Sheet 4 of 6

@ EDS provide isometric / support sketches

INTERFACE DATA REQUIRED PLANT: Dresden Unit 2 ,

Interface Need Safe Nutech EDS EDS Line Numbers Data Reg'd Anchor Shut- Data to Analysis Design EDS P&lD liranch Pipe Run Pipe TAM SAM Location down EDS Completion Completion Problem SR-25 -

2-1603-18" No No x 9/7 10/20 h 2/31 D2-P3UPP-OlC SR-25 -

2-8503-4" No No N/A -

9/17 h -

D2-PSUPP-01B(C)

SR-27 -

2-1406-8" No No 10/15 N/A 12/31 D2-COSP-04C SR-27 -

2-1403-10" No No 10/15 N/A 12/31 D2-COSP-04C

~

SR-29 2-1531-18" x x N/A 10/15 11/19 4/30 D2-LPCI-02B(C) 2-1 ,,

~9 10/15 11/15 1 (12/1}

2-2340-4" N/A No No x x D2-HPCI-OlB(C)

SR-51 (9/17) 3 SR-51 2-2315-4" 2-2302-16" x x N/A 12/30 1/21 [2/28 } D2-IIPCI-06B(C)

SR-51 2-2311-4" 2-2301-16" x x N/A 12/30 1/31 4/30 D2-IIPCI-05B (C)

Revision 0 NOTES: h EDS anchor loads to NUTECll h Preliminary data by 10/15 h EDS provide isometric / support sketches Sheet 5 of 6

INTERFACE DATA REQU1 RED PLANT: Dresden Unit 3 ,

Interface Need Safe Nutech EDS EDS Line Numbers Data Req'd Anchor Shut- Data to Analysis Design EDS P&lD Branch Pipe Run Pipe TAM SAM Location down EDS Coaiplet ion Completion Problem SR-356 -

3-1603-18" No No x 9/7 10/20 @ 2/28 D3-PSUPP-01C SR-356 -

3-8503-8" 10/15 (9/17) h 5/31 D3-PSUPP-05B(C) 5 '

SR-360 5 lB 3,,

3-1531-18" x x N/A 10/15 11/12 3/31 D3-LPCI-02B(C)

SR-36U SR-374 3-2340-4" N/A No No x x 10/15 11/15 (12/l] D3-IIPCI-01B(C)

(9717) Q SR-374 3-2315-4" 3-2302-16" x x N/A 1/31 3/14 5/31 D3-ilPCl-06B(C)

SR-374 3-2311-4" 3-2301-16" x x N/A 1/31 2/28 5/31 D3-IIPCI-05B (C)

NOTES: h EDS anchor loads to NUTECil [ ] See Sheet 1 / 2 h Preliminary data by 10/15 h EDS provide isometric /suppurt sketches Sheet 6 of 6

9 9

ATTACHMENT 2

r I

l Attachment 2 I

DISPLACEMENT DATA AT RUN-BRANCH INTERSECTIONS PLANT:

BRANCH PIPE LINE NUMBER:

RUN PIPE LINE NUMBER:

NUTICH DATA POINT:

REVISION: DATE:

LOADING TYPE: Seismic Anchor Motions (SAM)

X Y Z DISPL. (IN) DISPL. (IN) DISPL. (IM)

XX YY ZZ ROTATION (RAD) ROTATION (RAD) ROTATION-(RAD)

LOADING TYPE: Thermal Anchor Motichs (TAM)

X Y Z DISPL. (IN) DISPL. (IN) DISPL. (IN XX YY ZZ ROTATION (RAD) ROTATION (RAD) ROTATION (RAD) htere X, Y, Z are in the Global Coordinate Sysrem with North indicated.

, _- ._- --_ ..-, , m ,.,_.--_m___ , . _ . _ _ _ _ _ - _ _ . , _ - , - - - - - _ . -

--NJ O O e

f ATTACHMENT 3

. 4F Ens NuCLEaN INC. sagr 57 SUPERPIPE VEp5.ll/IS/70 P7/'4/06

!? '$e30 COMMONWEALTH EDISON O

EDS PROG NO: 01-%TGA-C3C E05 J06 NO: rSec. n3 QUAD CITIES UNIT I 4fvleION:t C STAN00f GAS PI3ING . II SJPPO4T LDAD

SUMMARY

(CONTD.) II SUPP SUPP SUPP DiaN SCSULT RESULT Avlt LOAD LOAD LOAD NAME LOCN ITPE CODE TYPE UNIT TYPE N-AXIS SET Y-ANIt SET 2-ANIS KET II 41 1 ANCH GLOB ID FORC (LB3 GLOB 380.6? FLPSIM*3 16.54 DHEtM+1 325.lR DOCfMe) 304.37 UPS , 319.78 FLPS 22H.12 Nps -10.72 Tl 519.78 FLTP II 276.7* Tl -le.54 060 157.IP UPS 159.*4 FLTP -413.70 FLOS 152.%0 DBE -413.70 FLTP -5.41 NP GI 1.34 Not -421.87 Urs -5.41 NPS 1 34 NP -430.24 NPS -5.41 No 1 34 NP -43C.24 NP -246.1C Tl II

-430 24 Np -251.50 NOS

-74.92 UPS -44C.a6 NPS -325 1R 09E

-151 17 FLTP -446.7P FLTP -33C.59 FLTP IB

-151 17 FLpS -44=.23 UPS -414.10 UPS

-152.50 00EtM-1 -457 51 FLPMIP-3 -576 69 FLPSIM-1 MOMT (LP.FT)

O GLOS 5631.l? FLPSIM+) 446f.35 FLPSEM*3 3 14 D8EtM*3 5904.73 Urt 3248.13 UPM 4187.%3 Tl 2966.24 FLTP -1.92 Tl UI 43Ra.34 NPt 2422.42 DDF -3.14 D9E 1250.7P DDE 2?17.*2 NP9 -541.53 FLD$

! ?43.t C FLTP lang.gg 73 541 63 FLTP ID 44.RP NPt -543.20 Ups

-7.la NPS 43.H? NP -544.77 NPS

-7.la Np 43.P? NP -544.77 NP II

-7.la NP -594.77 NP

-632.5P UPS -1167.39 UPS -546.6a NPS

-1250.7R DOE -?378.61 FLTP -547.91 FLTP II

-1257.a7 FLTP '

-?37P.61 FLPt -54P.25 UpS

-1257.47 rLpstM-) -2422.47 OPEtF-1 -549.82 FLPSIM-)

OltP (IN) GLOB 4

HE3LIGIHLE ROTN (RAD) GLOP NE3LIGIBLE Ib 42 5? ANCH GLOR UI FOPC (LR) GLOP 242.11 DPEt9*) I ? . 7 f- OpFIF+3 7.4a rLpsgMen

?4".40 FLPS 4.P8 ft 7.4R FLTP 24f.*P Flip 5.37 39E II 118.*5 UP' -l ?. 76 DPE 4.79 yes

-64*.l* FLrt  ?.gl ye

-1.71 op

-7'*.r? FLTe 2.11 PpS GD

-1.71 NPS -7*%.5? (*% 1 11 Ne 9

RAGE u EDS touCLEAk E t4C .

SUPERPIPE VERS.11/IS/79 62/04/2(.. 17.33.3).

COMMONJEALTH EDIMON [0S PAnn NO: Gl 'TGA-0!C EDM J00 r.0: 3 %# ;.- 71

  • GuAD CITIES UNIT I REVISION 1 STANDRY CAS PIPING ,

LDAD SET SPECIFICATION ]

SET COMB NAME TYPE LIST OF CASES IN GROUP TITLE NORM PRIFARy NP DFLT DJ

'T1 0FLT THER THERNAL CAST NP OFLT DW THER NORM PRIM

  • SECONDARY UPS OFLT DW OBE THER UPSET PR19eSECOND FLPS DFLT DW DBC THER FAULTED PRIMeSECOND.

DBE OFLT D8E 000 FLTP DFLT DW DBE FAULTED PPIMAPV i

h

205 NUCLEAR JNr. .

SUPEOPIPE VlaS. 15C '6/2M/P28 SYSTEP EDS - NOS PAGE 6

  • 82/08/27. 14.39.18.

COMMONJEALTH E31.*04 En CDS PROB NO:01-RHRS-028 CDS J00 NO:3590-003 - ,'

() 3UA0 CITIES UNIT I REVISION 4

  • RESIDil&L HEAT REPOWAL.SYSTEP/FROP RHR$ HEAT ENCHANGIR 18-tfP3 TO ANCHORS ON 121N AND 141N RHR3 PUMP PIPING AND 70 SEAL WELD PENET4ATIONS AT C.R. WALLS O

SJPPO4T LOAD SUMM&tf SJPP34T L3AD SUMMA 4Y CHECKING REGION INDICATOR = FULL (ALL SUPPORTS)

() OUTPUT DETAIL INDICATOR = DETL (DETAILED P4INTOUT)

COMMENTARY INDICATOR = COMM (COMMENTARY TO BC P4XNTED) .

LOAD CASE INDICATOR = NEWC (NEW CASES TO BC SPECIFIED8

'() PRES $URE DISTRIBUTION INDICATOR =

(N0 DISTRIBUTIONS TO BE SPECIFIED)

(-'

TEMPERATURE DISTRIBUTION INDICATOR =

(N0 DISTRIBUTIONS TO BE SPECIFIED) .

[) DESIGN CHECK COMMENTARY 9

,D I

SUPP04T LOAD COMBINATIONS COMB. NAME LOAD COMBINATION I CODE DESCRIPTION N8 GRAVITY ALogE T1 NORMAL PRIMA 47 THERMAL ALONE

) 12 THERMAL ALONE THERMAL CASE 1 ,.%

N#S THERMAL CASE 2 ~*

GRAVITveTHERMAL NORMAL PRIMARY

) GRAVITY *THERNAL*0BE UPSET PRIMARY

  • SECONDARY FLPS GRAVITY
  • THERMAL *DBE:'

DOC FAULTED P48944Y* SECONDARY 30E ALONE OBE FLTP GRAVITY *DBE l FAULTED PRIMARY 5

s j

ii I

e

EDS NUCLFAn *.C.

SUPERPIPC VE*S. PAGE R -

15C (6/?3/A28 Sv5 TEM EDS - 005 ',

82/08/27. 14 39 18.

O .

COMMONWTALTH EDISON 00 CDS PROS NO:01-RHRS-028 EDS JOB NO:0590-OC3 QUAD CITIES UNIT 1 REVISION 4 O

RESrDuAt HEAR REMO<At SvSTEa/FRon RHR$ HEAT ExCHAncta la-io03 To A=CHORS ON -

121I AND 341N RHRS PurP PIPIN3 AND To SFAL WELD PENciaATIONS AT C.R. WALLS O

LOAD SET SPECIFICATION ,

SET COM8 O NAnt TvPE L ST Or CASES N caouP T Tot O =P DrLT DW NORn PRinARv T1 DFLT THR1 THERMAL CASE 1 ,

T2 DFLT ,

THR2 THERMAL CASE 2 ~~

O NPS orLr DW THat THR2 NaRn PRin.SECONDARv UPS OFLT DW 08E THR1 THR2 UPSET PRIM *SECOND FLPS DFLT DW DBE THR1 THa2 FAULTED PRIM *SECOND.

O o8C oFLT 08C D8E FLTP OFLT DW 08E FAULTED PRIMARv O . .

O O

O .,

1 O

O

' ~

O .

O

, O 1

i O

!O -.

_ ' () '

[0S NUCLEAR INC.

SUPCRPIPC VE85. 15C s6/28/823 SYSTEp EDS - NOS PAGE 10 .

82/08/27. 14.39 14.

CoaMo4 WEALTH EDIS0N Co EDS PROB N0101-RNRS-028 CDS JOB N010590-OC3 -

() 00A0 C17tr$ HNIT 1 REVISION 4 ,

RESIDUAL HEAT RE90 VAL SYSTEM /FROM RH45 HE A T ENCH ANGIR 18-1033 70 ANCHORS ON 121N AND 143N RH4% PUMP PIPIN3 AND TO SEAL WELD PENETRATIONS AT C.R. WALLS O

SUPPORT LOAD SUMMA 4f

() SUPP SUPP SUPP DIRN RESULT RESULT Ax!S LOA 0 LOAD NAME LOCN TTPC CODE TYPE U41T TfPE LOAD N-ANIS SET Y-ANIS SET Z-AX15 SET O

A8 A8 ANCH GLOS FORC (LB) GLOS 750 27 FLPS(M*3

() 615 12 UPS 144.58 100.68 DBE(M.)

T2 286.87 FLPS(M*)

642 54 T2 286 87 FLTP 100.48 T1 277.25 DSC -

602 33 71

() 519.95 HPS 148 25 9 63 UPS

() 14F.93 FLTP 427.81 FLPS 9.63 NP

~528.49 FLTP

-2.3A i

() -2 3M NPS NP

=572.39

~673.06

~ NPS NP

-267.62 FLTP

-2.38 NP

-277 25 DSC

-673.86 NP -726.39 NPS

?'.54 -673.06

() -150.31 UPS DBE -745.35 NPS UPS

-735 88 T1

-152.69 -736.82 T2 4 FLTP -817.64 FLTP -865.81 UPS O -152.69 FLPS(M-) -817.64 FLPS(M-3 -1883.64 FLPSIM-)

MOMT (LR.FT) GLOB 1748.65 FLPS(M+)

1526 35 370.49 FLPS(M*3 1e62.15 FL P S ('M

  • 3

() 1304.05 UPS NPS 331.84 3OR.RO UPS T2 956 00 UPS 858.96 T1 1944.86 T2 388.88 ft 858.96 T2

() 3049.60 T1 293.28 NPS 849.84 NPS 699.88 FLTP 77.21 DME 212.31 08C 444.61 DPE 61 69 FLTP 255.19 Nr5 211.19 FLTP

() 255.19 NP 255 19 NP -15.52 NPS -1 12 MPS

() 32 89 UPS -13.52

-15.52 NP NP

-1 12 NP

-1.12 NP

-54 13 UPS -187.2A UPS

-189.42 FLTP

() --189.42 FLPS

-77 21

-92.73 DBE FLTP

-212.31 D8[

-213.43 FLTP

-44t.61 DBE(M-3 , -92 73 FLPS(M-3 -213.93 FLPS(M-3 i

() OIEP (IN) GLOB NEGLIGISLQ ROTN (RAD) GLO6 NEGLIGISLQ

()

, C)

, C3 _ _

l.

() LOS NUCLlak U. C .

. *-us .-

C2/CC/27, 14.34.18.

SUPERPIPC VERS. 15C L6 /.'4 / N21 SYSTEM [Ds - Not **

O COPMONJEALTH EDISO4 CD EDS PR04 ND:01-pHRS-328 EDS J0E NO:C5*6-003 GUAD CITIES UNIT 1 REVI% ION 4 .

() PfSIDUAL HEAT REH0 VAL SYSTEM /FPO* RHR$ HEAT EMCHANGER 18-1003 TO ANCHORS ON ,

121N AND 1414 RHRS PUMP PIPING AND To SEAL WELD PENETPAYIONS AT C.R. WALLS O (CONTD.)

SUPPORT LOAD SUMMA 4Y Load LOAD LOAD

() SUPP SUPP SUPP DIAN RESULT RESULT AMIS NAME LOCN TYPE CODE TYPE UNIT TYPE X-AXIS SET Y-AMIS SET 2-ANIS SET O .316 08E 42Y . 3 R f, FLTP (CONTD.) .310 FLTP

.3T3 DDE

() .193 UPS .194

.042 UPS T1

.00T NP

.036 NPS

.30T NPS /**

() 007 NP .034

.006 T2 NPS +-

.008 T2

.006 NP

. 's Nes 4

() .018 ft . 006

.164 NP UPS

. 19R UPS

.367 FLTP .316 08E

() .3T3 08E .322

.322 FLTP FLPStMan

.385 FLPSIM-l O

C32A C32A HANG Y CLO8 -534.00 NPS EL83

() FORC -534.00 NPS

-534.00 UPS

-534.10 UPS

() -534.00 FLPS

-534.00 FLPS

-534.00 NP I

() -534.94 NP

-534.00 FLTP

-534.00 FLTP(M-1

() FLPS(Mel .036 FLP$tM+)

DISP (IN) GLOP .142 FLPSIM*) .261

.142

() .142 FLTP .149 T2 NPS

.036

.014 FLTP UPS

.4T1 UPS .149

.312 DOC

() .112 FLTP

.111 T1

.s22 T2

, .00R T2

() .n14 NPS .s26

.026 NPS T1

.014 T1

.985 UPS .0%6 UPS .036 FLTP

() .142 FLTP .112 FLPt . 036

.C45 08E UPS i .14? DPF .112 FLTP

.157 FLPSt9-3 .112 D8 Eta-3 .063 FLPSIM-)

()

() .

II ____ _ __ - __

~

C) -

EDS NUCLEAR ICC. '

O $UPERPIPE VEcs. 15C 06/28/828 SYSTEM EDS - N05 PAGF 19 82/08/27. 14 39 14.

CopMONWEALTH EDiton Cn EDS PROS N0*nt-pH45-3PR EDS' Joe N019596-G03

() GUA0 CITIES UNIT I REVISION 4 ret 10nAL HEAT ArMotAL SYSTEH/FROP 12IN AND 1914 RHRS PUMP PIPIN3 Ah3PHes HEAT [mCHANGER In-len2 TO ANCHORS ON TO SEAL WELD PENETRATIONS AT C.R. UALLS O

SGPPO4T LOAD SUMMA 4Y (CONTD.)

, () SUPP SUPP SUPP _DIRN RFSULT PESULT A515 LOAD NAME LOCN TYPE C00C TYPE UNIT TVPE M-ANIM SET LOAo LOAD Y-4X15 SET Z-AXIS O SET SSX d5 SNGL X FORC

() (L8) GLOS 1013.P4 FLPStMe) 930.11 DDE 904.55 FLTP ,.

() ,

547.98 104.39 UPS 71 82.93 NPS

() 42.64

-25.46 T2 NPS

-25.46 NP

() -25.46

-490.51 NP UPS

-930 11 DDE

() -955.57 FLTP

-9ss.51 rLeSeM-)

() O!sP (IN) GLOR

.22A FLPS(Me)

.172 UPS

.138

() .116 T2 NPS

.112 DBE

.105 T1

() .090 FLTP

. 022 NPS

.o22 NP

() =.022 NP e

.07A UPS ~'

.112 OPE

() * .134 FLTP

.134 FLPS(M-)

() 55Z 55 SNGL 2 FORC (LB) GLOB '

() 2199.74 FLPS(Me) 2180.84 FLTP 2C48.54 DBE

() 1175.46 191 19 UPS hpS 132.30 MP

() 132.30 78.42 NP NPS l 18.89 T1

() -s3.8a r2

1 f C)

[0S NUCLEAR INC. PACE 20 l SUPECPIPE v [ P e. . ISC 96/28/828 SYSTre FDS - NOS ,

() 82/08/27. 14.39 18. -

COMMONJEALTH EDIS0N C.0 EDS PROB N0:01-RHRS-028 EDS JCB ND:0590-003 .

9U40 CITIrs UNIT I RTyls!ON 4

() RESIDUAL HEAT PCHOWAL SYSTE*/FNOM RHks HEAT EFCHANGER 10-l'F3 TO ANCHORS ON

{ ,

121N,4ND 14IN RHRS PUMP PIP!h5 AND TO SE AL WELD PENETR ATIONS AT C.R. WALLS

()

$JPP34T LOAD SUMMatt (CONTD.)

() SUPP SUPP SUPP DIRN RESULT RESULT ANI L0a0 LOAD LOAD NAME LOCN TYPE CODE TYPE UNIT TYPE X-ANIS SET Y-AXIS SET Z-AXIS SET I () '

55Z '

(CONTD.)

() -945.85

-1916.24 UPS FLIP

-1970.12 FLPS

) =2048 54 08EtM-9 C) f., , '

DISP IINI GLOB .228 FLPS(Mel

.172 1 () .138 UPS 12 l .116 NPS

.112 e

() .105 DBE T1 G

.090 FLTP

=.022 1

() .022 NPS NP

.022 NP i .078

() .112 UPS DBC

.134 FLTP -

O .134 FLPS(M-1 65Z 65 SNGL 2

, () FORC (LB) GLOB 669.62 FLPS(M.)

669 62 FLTP

()

654 85 DBE I 342 19 UPS 14.76 NP

() 14 76 14 76 NPS NP

-337 79 NPS

() -348 57

-352.55 T2 T1

-640.09 FLTP

() -654.85

-665.21 00E UPS

-992 64 FLPSEM-)

() DISP (INI GLOD .013 DP[tM.) a

.013 FLPS

. *13 FLTP

() .!16 UPS

.a13 Der O

__m