Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML02070032410 May 2002Issuance of Amendment, Changing Technical Specifications Table 3.2.6 by Revising the Allowed Outage Times (Tac No. MB3430)Reactor Vessel Water Level
ML02085050523 April 2002Relief Request RR-V20, Revision 0, Related to the Inservice Testing Program (Tac No. MB3469)Stroke time
ML02129060614 August 2002License Amendment No. 209, Change Technical Specifications Re Operability of Alternate TrainsUltimate heat sink
ML02133001221 August 2002Issuance of Amendment No. 210, Primary Containment Isolation ValvesStroke time
ML02140058031 May 2002Relief Request RR-V20, Revision 0, Correction Letter Related to the Inservice Testing Program
ML02154033727 August 2002Issuance of License Amendment Control Rod Block InstrumentationHalf scram
Probabilistic Risk Assessment
Incorporated by reference
Scram Discharge Volume
Fuel cladding
ML02197011714 August 2002Safety Evaluation of Inservice Testing Relief Request for Safety Related PumpsIncorporated by reference
ML02210039531 July 2002Issuance of Amendment Transfer of Ownership and Operating Authority Under Facility Operating License to Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, IncSafe Shutdown
Offsite Dose Calculation Manual
Fire Protection Program
ML02220009426 August 2002Third 10-Year Interval Inservice Inspection Program Plan Request for Relief No. P-4Incorporated by reference
ML02248046918 September 2002License Amendment 212, Remove Existing Scram Function & Group 1 Isolation Valve Closure Functions of Main Steam Line Radiation Monitors
ML02276022918 November 2002Completion of Licensing Activity for Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, Vermont Yankee Nuclear Power Station (VY) (TAC No. M96880)
ML0303506004 February 2003License Amendment, Revised Definition of Operable in Technical Specification 1.0.K with Respect to Support System Requirements for Alternating Current Power Sources, MB4291
ML03057072827 February 2003Amendment 214 to License DPR-28, Generic Position Titles & Other Administrative Changes
ML03073004823 December 2003License Amendment, Issuance of Amendment, No. 216 Logic System Functional Test Dated 12/23/03
ML0313206862 June 2003Issuance of Amendment No. 215, Changing the Technical Specification by Extending the Primary Containment Integrated Leak Rate Testing Interval from 10 Years to No Longer than 10.6 Years on a one-Time BasisTemporary Modification
ML0320203886 October 2003Relief Request Nos. RR-P01, RR-P02, RR-P03, RR-P04, RR- V01, and RR-V02 (TAC Nos MB7489 Through MB7494)Incorporated by reference
Scaffolding
ML03318046922 December 2003Relief Requests for Fourth 10-year Inservice Testing Program Interval (TAC No. MB7489 Through MB7494)Incorporated by reference
Scaffolding
ML0403700665 March 2004Safety Evaluation of Relief Requests for the Fourth 10-Year Interval of the Inservice Inspection Program. (TAC Nos. MB8349 Through MB8358)Weld Overlay
Nondestructive Examination
Dissimilar Metal Weld
ML04062003629 March 2004License Amendment, Issuance of Amendment, Reactor Pressure Vessel Fracture Toughness and Material Surveillance RequirementsAnticipated operational occurrence
Hydrostatic
ML04063073222 March 2004Amendment 217 to License DPR-28 Revising Safety Limit Minimum Critical Power Ratio Values in Technical Specification 1.1.A.1 to Incorporate Results of cycle-specific Core Reload Analysis for Cycle 24 OperationSafety Limit Minimum Critical Power Ratio
Abnormal operational transient
ML04092035214 April 2004License Amendment, Revise Technical Specifications (Tss) to Reflect an Expanded Operating Domain Resulting from Implementation of Average Power Range Monitor, Rod Block Monitor Tss/Maximum Extended Load Line Limit Analysis (Arts/Mellla)Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
Fuel cladding
ML0410700886 July 2004Relief Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Case N-600
ML04128049029 March 2005License Amendment, Alternative Source TermSafe Shutdown
Boric Acid
Safe Shutdown Earthquake
Seismically rugged
Exemption Request
Earthquake
Fuel cladding
Weak link
Power Uprate
ML04211024330 September 2004Safety Evaluation, Relief Request for Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds in Accordance with BWRVIP-05 and GL 98-05Non-Destructive Examination
Hydrostatic
Incorporated by reference
ML0432204429 December 2004ANO, Units 1 & 2, Grand Gulf, River Bend, Waterford, Indian Point Units 1, 2, & 3; FitzPatrick, Pilgrim and Vermont Yankee - Revision to the Quality Assurance Program Manual (QAPM)
ML04336005914 December 2004License Amendment, Elimination of Requirements for Hydrogen/Oxygen MonitorsProbabilistic Risk Assessment
Fuel cladding
ML0504201651 June 2005License Amendment, Relocation of Inservice Testing Requirements to a Licensee - Controlled ProgramStroke time
Probabilistic Risk Assessment
ML05066029922 March 2005License Amendment, Elimination of Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports
ML05116009219 July 2005Safety Evaluation of Request to Amend Previous Approvals Granted Pursuant to 10 CFR 20.2002
ML0516700627 July 2005License Amendment, Extend Intermediate Range Monitor Surveillance Test FrequenciesSafe Shutdown
ML05187024725 July 2005Safety Evaluation of Request to Use Later Edition and Addenda of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) (Tac No. MC5850)Hydrostatic
VT-2
Incorporated by reference
ML05192013815 August 2005Issuance of License Amendment 226 Administrative ChangesSafe Shutdown
Internal Flooding
Probabilistic Risk Assessment
ML05200000331 August 2005License Amendment, Revise One-Time Extension of Integrated Leak Rate Test IntervalProbabilistic Risk Assessment
Large early release frequency
Moisture barrier
ML0522002265 August 2005E-Mail Ennis, NRR, to Abdullahi, NRR, Et. AL, VY EPU SE TemplateSafe Shutdown
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Coatings
Nondestructive Examination
Large early release frequency
Earthquake
Power-Operated Valves
Turbine Missile
Fuel cladding
Fire Protection Program
Power Uprate
ML05236000220 September 2005License Amendment, Drywell Spray Header and Nozzle Air Test FrequencyForeign Material Exclusion
ML05237024419 September 2005Safety Evaluation of Relief, Use Various Boiling Water Reactor Vessels Internal Program Guidelines as an Alternative to Certain Requirements of Section XI of ASME Code for Inservice Inspection of Reactor Vessel Internal (Rvi) ComponentsNondestructive Examination
Incorporated by reference
EVT-1
ML05256000619 September 2005Safety Evaluation of Relief Request B-5 - Vermont Yankee Nuclear Power StationVT-2
Incorporated by reference
Dissimilar Metal Weld
ML0600500282 March 2006Vermont Yankee, Safety Evaluation for Amendment 229 Regarding Extended Power UprateHot Short
Safe Shutdown
High winds
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Non-Destructive Examination
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Nondestructive Examination
Channel-control blade interference
Significance Determination Process
Feedwater Controller Failure
Large early release frequency
MELLLA
Severe Accident Management Guideline
Earthquake
Power-Operated Valves
Hardened vent
Turbine Missile
Fuel cladding
Liquid penetrant
Fire Protection Program
Flow Induced Vibration
Coast down
GOTHIC
Power Uprate
Overspeed trip
ML0608706502 May 2000Memo from Edwin Fox to James Clifford, Subject: Safety Evaluation for an Amendment to an Approved 10 CFR 20.2002 Application for the Vermont Yankee Nuclear Power StationOffsite Dose Calculation Manual
ML06088048815 April 2005Memo from Stephen Klementowicz, NRR, to Allen Howe, NRR, Subject: Safety Evaluation for an Amendment to an Approved 10 CFR 20.2002 Application for the Vermont Yankee Nuclear Power Station
ML0621201542 October 2006GGNS, IP-1, IP-2, IP-3, Pilgrim, River Bend, Vermont Yankee, and Waterford - Application to Use Effective Dose Equivalent Weighting Factors for External Exposure
ML0622302812 October 2006GGNS, IP1, IP2, IP3, Pilgrim, River Bend, Vermont Yankee, and Waterford - Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits - Letter to Entergy Operations, Inc. Enclosing Safety EvaluationMururoa
ML06286041915 November 2006Relief Request No (ISI)-013, Fourth 10-Year Interval Inservice Inspection Program PlanNon-Destructive Examination
Incorporated by reference
ML07053015926 March 2007Issuance of Amendment Adoption of Technical Specification Task Force (TSTF) Change TSTF-372, the Addition of Limiting Condition for Operation (LCO) 3.0.8 on the Inoperability of SnubbersProbabilistic Risk Assessment
Large early release frequency
Earthquake
ML0710201668 January 2001Memo from David Trimble to James Clifford, Subject: Safety Evaluation Input for Order Approving Transfer of Licensed Operating Authority for Vermont Yankee Nuclear Power Station
ML07116005515 January 2002Safety Evaluation by the Office of Nuclear Reactor Regulation Proposed Transfer of Operating License for Vermont Yankee and Conforming Amendments
ML07233022423 August 2007Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac No. MD4566)B.5.b
Severe Accident Management Guideline
Safeguards Contingency Plan
B.5.b Mitigating Strategies
ML07353047731 January 2008Relief Request No. ISI-PT-01, Alternate Pressure Testing for Buried Piping Components, Fourth Inservice Inspection IntervalVT-2
Incorporated by reference
Through-Wall Leak
ML08044017931 January 2008Safety Evaluation Report, Related to the License Renewal of Vermont Yankee Nuclear Power Station.
ML08056046225 February 20082008/02/25-Vermont Yankee-Exhibit 1 - Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station