Issuance of Amendment No. 215, Changing the Technical Specification by Extending the Primary Containment Integrated Leak Rate Testing Interval from 10 Years to No Longer than 10.6 Years on a one-Time Basis
ML031320686
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/02/2003
From: Pulsifer R
NRC/NRR/DLPM/LPD1
To: Thayer J
Entergy Nuclear Vermont Yankee
Pulsifer R M, NRR/DLPM, 415-3016
References
TAC MB6507
Download: ML031320686 (9)


Text

June 2, 2003 Mr. Jay K. Thayer Site Vice President - Vermont Yankee Entergy Nuclear Vermont Yankee, LLC P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500

SUBJECT:

VERMONT YANKEE NUCLEAR POWER STATION - ISSUANCE OF AMENDMENT RE: ONE-TIME EXTENSION OF APPENDIX J TYPE A INTEGRATED LEAKAGE RATE TEST INTERVAL (TAC NO. MB6507)

Dear Mr.Thayer:

The Commission has issued the enclosed Amendment No. 215 to Facility Operating License DPR-28 for the Vermont Yankee Nuclear Power Station, in response to your application dated October 4, 2002.

The amendment would change the Technical Specifications by extending the primary containment integrated leak rate testing interval from 10 years to no longer than 10.6 years on a one-time basis.

A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice.

Sincerely,

/RA/

Robert M. Pulsifer, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosures:

1. Amendment No. 215 to License No. DPR-28
2. Safety Evaluation cc w/encls: See next page

Vermont Yankee Nuclear Power Station cc:

Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. David R. Lewis Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, DC 20037-1128 Ms. Christine S. Salembier, Commissioner Vermont Department of Public Service 112 State Street Montpelier, VT 05620-2601 Mr. Michael H. Dworkin, Chairman Public Service Board State of Vermont 112 State Street Montpelier, VT 05620-2701 Chairman, Board of Selectmen Town of Vernon P.O. Box 116 Vernon, VT 05354-0116 Mr. Michael Hamer Operating Experience Coordinator Entergy Nuclear Vermont Yankee, LLC P.O. Box 250 Governor Hunt Road Vernon, VT 05354 G. Dana Bisbee, Esq.

Deputy Attorney General 33 Capitol Street Concord, NH 03301-6937 Chief, Safety Unit Office of the Attorney General One Ashburton Place, 19th Floor Boston, MA 02108 Ms. Deborah B. Katz Box 83 Shelburne Falls, MA 01370 Mr. Raymond N. McCandless Vermont Department of Health Division of Occupational and Radiological Health 108 Cherry Street Burlington, VT 05402 Mr. Gautam Sen Manager, Licensing Entergy Nuclear Vermont Yankee, LLC P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500 Resident Inspector Vermont Yankee Nuclear Power Station U. S. Nuclear Regulatory Commission P.O. Box 176 Vernon, VT 05354 Director, Massachusetts Emergency Management Agency ATTN: James Muckerheide 400 Worcester Rd.

Framingham, MA 01702-5399 Jonathan M. Block, Esq.

Main Street P.O. Box 566 Putney, VT 05346-0566 Mr. Michael R. Kansler Sr. Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.

Mail Stop 12A 440 Hamilton Ave.

White Plains, NY 10601 Mr. John J. Kelly Director, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

ML031320686; TS(s): ML ; Package: ML OFFICE PDI-2/PM PDI-2/LA SPLB/SC*

OGC*

PDI-2/SC NAME RPulsifer CRaynor SWeerakkody RHoefling JClifford DATE 5/29/03 5/29/03 05/06/03 05/23/03 5/30/03

ENTERGY NUCLEAR VERMONT YANKEE, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.

DOCKET NO. 50-271 VERMONT YANKEE NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 215 License No. DPR-28 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment filed by Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (the licensees), dated October 4, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-28 is hereby amended to read as follows:

(B)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 215, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 60 days.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: June 2, 2003

ATTACHMENT TO LICENSE AMENDMENT NO. 215 FACILITY OPERATING LICENSE NO. DPR-28 DOCKET NO. 50-271 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.

Remove Insert 265 265

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. TO FACILITY OPERATING LICENSE NO. DPR-28 ENTERGY NUCLEAR VERMONT YANKEE, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.

VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271

1.0 INTRODUCTION

By letter dated October 4, 2002, Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (the licensees), submitted a request to amend the Vermont Yankee Nuclear Power Station Technical Specifications (TSs). The proposed amendment would revise the TSs by extending the primary containment integrated leak rate testing (ILRT) interval from 10 years to no longer than 10.6 years on a one-time basis.

2.0 REGULATORY EVALUATION

Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix J, Option B requires that a Type A test be conducted at a periodic interval based on historical performance of the overall containment system. Vermont Yankee TS 6.7.C. requires that leakage rate testing be performed as required by 10 CFR Part 50, Appendix J, Option B, as modified by approved exemptions, and in accordance with the guidelines contained in Regulatory Guide (RG) 1.163, Performance-Based Containment Leak-Test Program, dated September 1995. This RG endorses, with certain exceptions, Nuclear Energy Institute (NEI) report 94-01, Revision 0, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J, dated July 26, 1995.

A Type A test is an overall (integrated) leakage rate test of the containment structure.

NEI 94-01 specifies an initial test interval of 48 months, but allows an extended interval of 10 years, based upon two consecutive successful tests. There is also a provision for extending the test interval an additional 15 months, but this should be used only in cases where refueling schedules have been changed to accommodate other factors. The most recent two Type A tests at Vermont Yankee have been successful, so the current interval requirement is 10 years.

The Vermont Yankee refueling outages happen to fall such that the next Type A test would have to be performed approximately 9 years after the most recent one, because the following refueling outage would be 10.6 years after the most recent Type A test, and the extension allowed by NEI 94-01 does not apply. Thus, the licensee is requesting a TS change to add one more operating cycle to the test interval.

The licensee is requesting additions to TS 6.7.C, Primary Containment Leak Rate Testing Program, which would indicate that they are allowed to take an exception from the guidelines of RG 1.163 regarding the Type A test interval. Specifically, the proposed TS states that the first Type A test after the April 1995 Type A test shall be performed no later than November 2005.

3.0 TECHNICAL EVALUATION

NEI 94-01 allows an additional 15 months to be added on to the 10-year interval at the discretion of the licensee, but with the restriction that it should be used only in cases where refueling schedules have been changed to accommodate other factors. The purpose of this restriction is to prevent a licensee from arbitrarily adding the 15 months on to every testing interval, which would effectively change the interval permanently to 11.25 years. The safety and risk significance of the 15-month extension has already been incorporated into the models used to determine the acceptability of the testing interval. In this case, the staff considers the short extension of 7 months to be a reasonable request, considering the Vermont Yankee testing history and other factors, discussed below.

The last two Type A tests at Vermont Yankee were conducted in 1992 and in 1995. The results of both tests were less than 50% of the allowable limit of 0.8% by weight/day. Additionally, there have been no permanent or temporary modifications to the containment structure, liner, or penetrations since the last Type A test that could adversely affect the Type A test results. No modifications that require a Type A test are planned prior to the 2005 refueling outage, when the next Type A test will be performed under this proposed change. Any unplanned modifications to the containment prior to the next scheduled Type A test would be subject to the special testing requirements of Section 9.2.4 of NEI 94-01 and Section XI of the ASME Boiler and Pressure Vessel Code. There have been no pressure or temperature excursions in the containment which could have adversely affected containment integrity. There is no anticipated addition or removal of plant hardware within the primary containment which could affect leak-tightness.

Actual test results of the previous Type A tests for the current service period showed no degradation in the ability of the containment to maintain leakage at, or below, the required limits. Type B and C Local Leak Rate Tests will continue to be performed at the frequency required by the TSs, with repairs being made as necessary.

Vermont Yankee has established procedures for performing visual examination of the accessible surfaces of the containment for detection of structural problems. RG 1.163, Regulatory Position C.3 specifies that these examinations should be conducted prior to initiating a Type A test and during two other outages before the next Type A test, if the interval for the Type A test has been extended to ten years, in order to allow for early detection of evidence of structural deterioration. These visual examinations have been completed, with no significant defects noted to date.

It is noted that a visual inspection is also conducted in accordance with the Containment Inservice Inspection (ISI) requirements, per 10 CFR 50.55a(b)(2)(vi) and Subsection IWE of Section XI of the ASME Boiler and Pressure Vessel Code.

Based on the foregoing evaluation, the staff finds that there are no significant increases in risk or reductions in safety resulting from the requested test extension, beyond those already considered in the establishment of the intervals allowed by RG 1.163 and NEI 94-01. Further, the Vermont Yankee containment has a good leakage rate history, has not been significantly modified or stressed, and has passed the required visual and ISI inspections. Therefore, the staff concludes that the requested TS change, increasing the Type A test interval one time to 10.6 years, is acceptable.

5.0 STATE CONSULTATION

In accordance with the Commissions regulations, the Vermont State official was notified of the proposed issuance of the amendment. The State official had no comments.

6.0 ENVIRONMENTAL CONSIDERATION

The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in amounts, and no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (67 FR 68736).

Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

7.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: J. Pulsipher Date: June 2, 2003