Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML15322A08912 November 2015Response to Request for Additional Information Regarding Application for Amendment to Technical Specifications for Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (Ptlr)..Hydrostatic
Finite Element Analysis
Pressure and Temperature Limits Report
ML15322A09012 November 2015Enclosure 4, Non-Proprietary Version of the Epri/Bwrvip Information Requested in RAI 1Pressure and Temperature Limits Report
ML16060A32817 February 2016Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes EnclosFuel cladding
Minimum staff
ML16314A5053 November 2016Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1B of 1C
ML18088A08029 March 2018Response to Request for Additional Information for Alternative RR-V-11 Regarding Main Steam Safety Valve Testing Requirements
NL-15-0704, Regarding Response to Request for Additional Information on Multiple Technical Specification Changes4 May 2015Regarding Response to Request for Additional Information on Multiple Technical Specification Changes
NL-15-1114, Response to Request for Additional Information for Alternative Requests RR-P-11 and RR-P-1316 July 2015Response to Request for Additional Information for Alternative Requests RR-P-11 and RR-P-13
NL-15-1221, Withdrawal of RR-V-2 and Response to Request for Additional Information on RR-V-116 July 2015Withdrawal of RR-V-2 and Response to Request for Additional Information on RR-V-1Stroke time
NL-15-1535, GNF-002N9964-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Hatch 1 Cycle 2831 August 2015GNF-002N9964-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Hatch 1 Cycle 28Minimum Critical Power Ratio
Fuel cladding
NL-15-1621, Response to Request for Additional Information on Proposed In-Service Inspection Alternative to Install Four Full Structural Weld Overlays15 September 2015Response to Request for Additional Information on Proposed In-Service Inspection Alternative to Install Four Full Structural Weld OverlaysWeld Overlay
Liquid penetrant
Dissimilar Metal Weld
NL-15-1964, Response to Request for Additional Information on TSTF-500, DC Electrical Re-write.27 October 2015Response to Request for Additional Information on TSTF-500, DC Electrical Re-write.Internal Flooding
Large early release frequency
NL-15-2034, E.I. Hatch, Units 1 and 2 - Enclosure 4, Non-Proprietary Version of the Epri/Bwrvip Information Requested in RAI 112 November 2015E.I. Hatch, Units 1 and 2 - Enclosure 4, Non-Proprietary Version of the Epri/Bwrvip Information Requested in RAI 1Pressure and Temperature Limits Report
NL-15-2034, E.I. Hatch, Units 1 and 2 - Response to Request for Additional Information Regarding Application for Amendment to Technical Specifications for Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Repo12 November 2015E.I. Hatch, Units 1 and 2 - Response to Request for Additional Information Regarding Application for Amendment to Technical Specifications for Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits ReportHydrostatic
Finite Element Analysis
Pressure and Temperature Limits Report
NL-15-2047, Response to Second Request for Additional Information Regarding SNC License Amendment Request for TSTF-523, Revision 224 November 2015Response to Second Request for Additional Information Regarding SNC License Amendment Request for TSTF-523, Revision 2Surveillance Frequency Control Program
NL-15-2270, Response to Request for Additional Information for Alternative HNP-ISI-ALT-5-0116 December 2015Response to Request for Additional Information for Alternative HNP-ISI-ALT-5-01Weld Overlay
Nondestructive Examination
Incorporated by reference
NL-16-0169, Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes Encl17 February 2016Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes EnclosFuel cladding
Minimum staff
NL-16-0172, Response to Request for Information Regarding Changes to Technical Specification Section 1.0, 3.4.9, and 5.09 February 2016Response to Request for Information Regarding Changes to Technical Specification Section 1.0, 3.4.9, and 5.0Hydrostatic
Pressure and Temperature Limits Report
NL-16-0292, Response to Request for Additional Information on Revision to Secondary Containment Drawdown Time Technical Specifications Amendment Request16 March 2016Response to Request for Additional Information on Revision to Secondary Containment Drawdown Time Technical Specifications Amendment RequestSurveillance Frequency Control Program
NL-16-0628, Southern Nuclear Operating Company Response to Third Request for Additional Information Regarding Standard Emergency Plan: Cover Letter, Attachment 1 and Enclosures 1 - 109 June 2016Southern Nuclear Operating Company Response to Third Request for Additional Information Regarding Standard Emergency Plan: Cover Letter, Attachment 1 and Enclosures 1 - 10
NL-16-0655, Response to Request for Additional Information on Secondary Containment Drawdown Time Technical Specifications Amendment Request9 May 2016Response to Request for Additional Information on Secondary Containment Drawdown Time Technical Specifications Amendment Request
NL-16-0660, Response to Request for Additional Information on Secondary Containment Drawdown Time Technical Specification Amendment Request16 May 2016Response to Request for Additional Information on Secondary Containment Drawdown Time Technical Specification Amendment Request
NL-16-0739, Corrected Response to Second Request for Additional Information Regarding Standard Emergency Plan26 May 2016Corrected Response to Second Request for Additional Information Regarding Standard Emergency Plan
NL-16-1169, Response to Request for Additional Information on Technical Specifications - Revision Request to Implement TSTF-500, DC Electrical Re-Write.12 August 2016Response to Request for Additional Information on Technical Specifications - Revision Request to Implement TSTF-500, DC Electrical Re-Write.Surveillance Frequency Control Program
Battery sizing
NL-16-1830, Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1B of 1C3 November 2016Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1B of 1C
NL-16-1830, Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1C of 1C3 November 2016Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1C of 1CSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Safeguards Contingency Plan
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Backfit
Unidentified leakage
NL-16-2109, Response to Request for Additional Information on Technical Specifications Revision Request to Implement TSTF-500. DC Electrical Re-write16 November 2016Response to Request for Additional Information on Technical Specifications Revision Request to Implement TSTF-500. DC Electrical Re-writeSurveillance Frequency Control Program
Offsite Circuit
NL-16-2457, Supplemental Information Regarding Proposed Safety Limit Minimum Critical Power Ratio (SLMCPR) License Amendment18 November 2016Supplemental Information Regarding Proposed Safety Limit Minimum Critical Power Ratio (SLMCPR) License AmendmentMinimum Critical Power Ratio
NL-16-2494, Units 1 and 2 - Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...15 December 2016Units 1 and 2 - Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
NL-17-0063, Response to Verbal Request for Additional Information on Technical Specifications Revision Request to Implement TSTF-500, DC Electrical Re-write6 February 2017Response to Verbal Request for Additional Information on Technical Specifications Revision Request to Implement TSTF-500, DC Electrical Re-write
NL-17-0766, License Amendment Request to Revise Technical Specification Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies, Responses to NRC Second Set of Requests for Additional Information1 June 2017License Amendment Request to Revise Technical Specification Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies, Responses to NRC Second Set of Requests for Additional InformationHigh winds
Large early release frequency
Severe Accident Management Guideline
Containment Hardened Vent
Fuel cladding
NL-17-0917, Response to Request for Additional Information Regarding Relief Requests RR-16, RR-17. RR-21 and RR-2231 May 2017Response to Request for Additional Information Regarding Relief Requests RR-16, RR-17. RR-21 and RR-22Nondestructive Examination
NL-17-1161, License Amendment Request to Revise Technical Specification Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Supplemental Responses to NRC Second Set of Requests for Additional Information12 July 2017License Amendment Request to Revise Technical Specification Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Supplemental Responses to NRC Second Set of Requests for Additional InformationFLEX
Severe Accident Management Guideline
Containment Hardened Vent
NL-17-2015, Response to NRC RAIs Regarding Decommissioning Funding Status Reports22 January 2018Response to NRC RAIs Regarding Decommissioning Funding Status ReportsDecommissioning Funding Plan
NL-18-0085, Response to NRC RAIs Regarding Generic Letter 2016-015 February 2018Response to NRC RAIs Regarding Generic Letter 2016-01
NL-18-0211, Response to Request for Additional Information Regarding Alternative HNP-181-ALT-05-05 to Adopt Code Case N-70220 February 2018Response to Request for Additional Information Regarding Alternative HNP-181-ALT-05-05 to Adopt Code Case N-702
NL-18-0541, Response to Request for Additional Information for Alternative RR-V-11 Regarding Main Steam Safety Valve Testing Requirements17 April 2018Response to Request for Additional Information for Alternative RR-V-11 Regarding Main Steam Safety Valve Testing Requirements
NL-18-0639, Response to Request for Information Regarding Safety Relief Valve Main Valve Body Testing Extension10 May 2018Response to Request for Information Regarding Safety Relief Valve Main Valve Body Testing Extension
NL-18-1480, Response to NRC Request for Additional Information on Alternative Request (HNP-ISI-ALT-05-04)29 November 2018Response to NRC Request for Additional Information on Alternative Request (HNP-ISI-ALT-05-04)VT-2
EVT-1
NL-18-1514, Response to Request for Information Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-Shift.31 January 2019Response to Request for Information Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-Shift.
NL-19-0009, Supplemental Response to Alternative Request HNP-ISI-ALT-05-048 January 2019Supplemental Response to Alternative Request HNP-ISI-ALT-05-04
NL-19-0188, Emergency License Amendment Request for Technical Specification 3.8.1 Regarding Voltage Limit Increase for Emergency Diesel Generator Load Rejection Surveillance Test SNC Response to NRC Request...20 February 2019Emergency License Amendment Request for Technical Specification 3.8.1 Regarding Voltage Limit Increase for Emergency Diesel Generator Load Rejection Surveillance Test SNC Response to NRC Request...
NL-19-0698, License Amendment Request to Correct Non-Conservative Technical Specification Allowable Values for the Condensate Storage Tank Low Level Transfer Function SNC Response to NRC Request for ...12 June 2019License Amendment Request to Correct Non-Conservative Technical Specification Allowable Values for the Condensate Storage Tank Low Level Transfer Function SNC Response to NRC Request for ...Anticipated operational occurrence
NL-19-0850, Response to Request for Addition Information Regarding Application to Adopt Title 10 of Code of Federal Regulations (CFR) 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and ...16 July 2019Response to Request for Addition Information Regarding Application to Adopt Title 10 of Code of Federal Regulations (CFR) 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and ...Safe Shutdown
High winds
Mission time
Tornado Missile
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
FLEX
Significance Determination Process
Tornado Missile Protection
Large early release frequency
Flooding Focused Evaluation
Earthquake
Hardened vent
NL-19-1028, Response to NRC Request for Additional Information Concerning License Amendment Request for Technical Specifications 3.3.8.1 and 3.8.1 Regarding Unit 1 Degraded Voltage Protection28 August 2019Response to NRC Request for Additional Information Concerning License Amendment Request for Technical Specifications 3.3.8.1 and 3.8.1 Regarding Unit 1 Degraded Voltage Protection
NL-19-1203, Response to Request to Additional Information Regarding Application to Adopt National Fire Protection Association Standard 8057 October 2019Response to Request to Additional Information Regarding Application to Adopt National Fire Protection Association Standard 805Safe Shutdown
Probabilistic Risk Assessment
NL-19-1248, Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations - TSTF-51, SNC Response to NRC Request for Additional Information17 October 2019Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations - TSTF-51, SNC Response to NRC Request for Additional InformationProbabilistic Risk Assessment
Surveillance Frequency Control Program
Recently irradiated fuel
NL-20-0640, Response to Request for Additional Information for Exemption Request27 May 2020Response to Request for Additional Information for Exemption RequestExemption Request
NL-20-0670, Response to Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2 June 2020Response to Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsProbabilistic Risk Assessment
NL-20-1000, Responses to NRC Requests for Additional Information to License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC Sources - Operating, for One-Time Extension of Completion Time23 August 2020Responses to NRC Requests for Additional Information to License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC Sources - Operating, for One-Time Extension of Completion TimeSafe Shutdown
Internal Flooding
FLEX
Large early release frequency
Offsite Circuit
NL-20-1273, Response to NRC Requests for Information License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for20 November 2020Response to NRC Requests for Information License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times forHealth Physics Network
Pandemic
Coronavirus
Minimum staff