Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000528/201200823 May 2012IR 05000528-12-008, 05000529-12-008 & 05000530-12-008, 11/13/2012 ;Palo Verde, Initial Information Request for NRC Triennial Baseline Component Design Bases Inspection NRC Inspection ReportProbabilistic Risk Assessment
Temporary Modification
ML0222101959 August 2002Request for Additional Information on Relief Requests (RR) - 20 & RR-21
ML02326018021 November 2002RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 15-Day & 60-Day ResponsesBoric Acid
VT-2
Pressure Boundary Leakage
ML04174010721 June 2004Request for Additional Information Security Plan Sections 10-19
ML04211008723 July 2004RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC Nos. MC2950, MC2951, and MC2952)
ML0424603061 September 2004Request for Additional Information Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors
ML04259023510 September 2004Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures
ML0515202672 June 20056/2/05, Palo Verde, RAI, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors
ML05167032828 June 2005RAI AC and DC Sources TS Amendment Request
ML0522004938 August 200505000528-05-012; 05000529-05-012, 05000530-05-012 - Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Information Request to Support the 95002 Inspection
ML05349019722 December 2005Request for Additional Information Regarding Steam Generator Tube Inspections
ML0603903509 February 2006RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4702, MC4703, and M4704)Mission time
Coatings
Foreign Material Exclusion
Scaffolding
ML06076007721 March 2006Request for Additional Information Regarding Technical Specification Amendment Submittal
ML06076027921 March 2006RAI, Revised Station Blackout Evaluation
ML0612301009 May 2006RAI Regarding Risk Informed Inservice Inspection Program Request (TAC Nos. MC9627/28/29)Probabilistic Risk Assessment
Dissimilar Metal Weld
ML06171046523 June 2006Request for Additional Information Regarding Technical Specification Amendment SubmittalProbabilistic Risk Assessment
Fire Watch
ML06286020218 October 2006Request for Additional Information Regarding Technical Specification Amendment Submittal
ML0705905576 March 2007RAI, Regarding Technical Specification 3.1.6, Shutdown Control Element Assembly (CEA) Insertion Limits, Amendment Submittal
ML07116043727 April 2007Request for Additional Information Regarding Withdrawal and Resubmittal of Emergency Plan and Implementing Procedure Requests
ML0727402309 October 2007Request for Additional Information Third 10 Year Interval Pump and Valve Inservice Test Program (Tac No. MD6404, MD6405 and MD6406)
ML0730903438 November 2007Request for Additional Information on the Response to GL 2007-01
ML0734605179 January 2008Request for Additional Information the 2006 Steam Generator Tube Inspections (Tac MD5981)
ML08261013424 September 2008Request for Additional Information, Second 10-Year Interval Inservice Inspection for Program Update and Relief Request 38
ML08343054916 December 2008Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water ReactorsMission time
Foreign Material Exclusion
ML09218044311 August 2009Request for Additional Information for the Palo Verde Nuclear Generating Station, License Renewal ApplicationCoatings
Aging Management
ML09247046330 September 200909/03/2009 Summary of Teleconference Call Between the NRC and Arizona Public Service Co. to Discuss Draft Request for RAI for Palo Verde, Units 1, 2, and 3, License Renewal ApplicationHigh winds
Probabilistic Risk Assessment
Large early release frequency
ML09247055130 September 2009RAI, for Environmental Review Renewal ApplicationHigh winds
Probabilistic Risk Assessment
Large early release frequency
ML0927501303 November 2009Summary of Telephone Conference Call Held on September 16, 2009 Between the U.S. NRC and Arizona Public Service Company, Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal ApplicationAging Management
ML0927502373 November 2009Request for Additional Information for the Review of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal ApplicationAging Management
ML0927903152 November 2009Request for Additional Information for the Review of the Palo Verde Nuclear Generating Station, Unit 1, 2, and 3, License Renewal ApplicationFire Barrier
Coatings
Aging Management
ML0928000152 November 2009Summary of Telephone Conference Call Held on October 1, 2009, Between the U.S. Nuclear Regulatory Commission and Arizona Public Service Company, Concerning Draft Requests for Additional Information Pertaining to the Palo Verde Nuclear GenerFire Barrier
Coatings
Aging Management
ML09289001112 November 2009Request for Additional Information for the Review of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal ApplicationFire Barrier
Aging Management
ML0930805573 December 2009Request for Additional Information for the Review of the Palo Verde Nuclear Generating Station, Units 1, 2 and 3, License RenewalBoric Acid
ML09309005713 November 2009Request for Additional Information for the Review of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal ApplicationFire Barrier
ML0931704283 December 2009Summary of Teleconference Call Held on 10/22/09, Btw the USNRC and Arizona Public Service Company, Concerning Draft Request for Additional Information Pertaining to the PVNGS, Units 1, 2, and 3, License Renewal ApplicationBoric Acid
ML0932004134 December 2009Correction to Request for Additional Information for the Review of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application
ML09329029814 January 2010RAI for the Review of the PVNGS Units 1, 2, and 3, License Renewal ApplicationWeld Overlay
Nondestructive Examination
Aging Management
ML09338005123 December 2009Request for Additional Information, License Renewal ApplicationSafe Shutdown
Aging Management
ML09349083029 December 2009Request for Additional Information for the Review of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application)Boric Acid
Coatings
Nondestructive Examination
Aging Management
EVT-1
Fire Protection Program
ML10015037828 January 2010Request for Additional Information for the Review of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application (TAC Nos. ME0254, ME0255, ME0256)Aging Management
ML10032004119 February 2010Summary of Telephone Conference Call Held on January 28, 2010, Between the U.S. NRC and Arizona Public Service Company, Concerning Draft RAIs Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal ApplicAging Management
ML1003602962 March 2010Request for Additional Information for the Review of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application (TAC Nos. ME0254, ME0255, and ME0256)Aging Management
Earthquake
ML1006805171 March 2010Response to January 28, 2020, Request for Additional Information (RAI) Regarding Reactor Internals, Half-Nozzle Repairs, Metal Fatigue, and Copper Alloy Piping, and Supplement to BalanceAging Management
ML1006805181 March 2010Response to January 14, 2010, Request for Additional Information Regarding Time Limited Aging Analyses (TLAA) for the Review of the PVNGS License Renewal ApplicationWeld Overlay
Nondestructive Examination
VT-2
Incorporated by reference
Aging Management
Through-Wall Leak
ML10085048626 March 2010Draft Request for Additional Information, Relief Request No. 45 from Certain ASME Code Class 1 Weld and Component Volumetric Exams of Reactor Vessel Outlet Nozzles for Second 10-Year Inservice Inspection. Interval
ML1009603678 April 2010Request for Additional Information for the Review of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application (TAC Nos. ME0254, ME0255, and ME0256)
ML10110045720 April 2010Draft Request for Additional Information, LAR, Technical Specification 3.8.7 Inverter Completion TimesSafe Shutdown
Probabilistic Risk Assessment
Large early release frequency
ML10116035728 April 2010Request for Additional Information - Palo Verde License Renewal ReviewAging Management
ML10116047126 April 2010Draft Request for Additional Information TS Changes on Minimum RWT Volume Setpoints
ML1013302522 June 20104-13-2010, Telecon Summary Re Draft Request for Additional Information Pertaining to the License Renewal ApplicationAging Management