Issue date | Title | Topic | |
---|---|---|---|
CP-201100609, Response to Request for Additional Information, Relief Request No. C-6 and C-7 | 21 April 2011 | Response to Request for Additional Information, Relief Request No. C-6 and C-7 | |
IR 05000445/2017007 | 8 February 2018 | Notification of Nrc Design Bases Assurance Inspection (Programs) (05000445/2017007 and 05000446/2017007) | Boric Acid Significance Determination Process Operability Determination |
ML023290215 | 22 November 2002 | RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 60-day Response (TAC MB4537 & TAC MB4538) | Boric Acid VT-2 Pressure Boundary Leakage |
ML040770247 | 22 January 2004 | Draft Information Inputs Preliminary RAI DC Electrical Power Technical Specifications Changes Pursuant to TSTF 360 - Attachment 7 | |
ML050390544 | 16 February 2005 | RAI, Request for Revision of TS 3.3.2 | |
ML051260281 | 17 May 2004 | LAR 02-06 Print-Ready TS Page Changes | Exemption Request |
ML060390301 | 9 February 2006 | GSI Letter RAI Response to GL 2004-02 (TAC Nos. MC4676 and 4677) | Mission time Coatings Scaffolding |
ML062560277 | 11 September 2006 | 9/11/2006 Fax to Licensee - Informal Request for Additional Information for Discussion Via Telephone - Risk-Informed Inservice Inspection Relief Request A-1 | Probabilistic Risk Assessment Nondestructive Examination |
ML070240464 | 24 January 2007 | E-Mail to Fred Madden and Timothy Hope, Txu Power, from Mohan Thadani, Nrc/Nrr - Request for Additional Information - Relief Request No. B-6 | Weld Overlay |
ML071700165 | 19 June 2007 | 6/19/07 E-mail from Mthadani, Nrr/Dorl/Lpliv, to Fmadden, Txu Power - RAI Re License Amendment Request for Extension of Completion Times for Offsite Circuits (TAC MD4068/4069) | High winds Internal Flooding Probabilistic Risk Assessment Offsite Circuit |
ML071770043 | 21 June 2007 | 6/21/07 E-Mail from M. Thadani, Nrr/Dorl/Lpliv, to F. Madden and T. Hope, Txu Power - Request for Additional Information on License Amendment Request on Extension of Completion Times (MD4066, MD4067) | Safe Shutdown Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency Offsite Circuit |
ML072070387 | 25 July 2007 | (E-MAIL) RAI Information Revision of TS 3.8.1, AC Sources-Operating Extension of Completion Times for Diesel Generators | High winds |
ML072080004 | 31 July 2007 | Memo to File Request for Additional Information Application for Order Approving Indirect Transfer of Control of Licenses & License Amendments to Reflect Proposed Licensee'S Name Change | |
ML072540641 | 24 September 2007 | Supplemental Request for Additional Information License Amendment Request Revision to Technical Specification 3.8.1, AC Sources - Operating, Ext of Completion Times for Offsite Circuits | Mission time Probabilistic Risk Assessment Offsite Circuit |
ML072690119 | 27 September 2007 | Request for Additional Information Regarding Request for Review and Approval of the Revised Emergency Plan | |
ML073030003 | 2 November 2007 | Request for Additional Information Related to License Amendment Request Associated with Methodology Used to Establish Core Operating Limits | |
ML073040003 | 2 November 2007 | Request for Additional Information Related to Review Associated with Large and Small Break LOCA Analyses (TAC Nos. MD6212 & MD6213) | Boric Acid |
ML073190286 | 19 November 2007 | Request for Additional Information Re LAR 07-006 to Revise Technical Specifications to Reflect Cycle-Specific Safety Analysis Assumptions Regarding Adoption of W* Methodologies | |
ML073310008 | 3 December 2007 | Request for Additional Information, Amendment to Revise TS Surveillance Requirement 13.3.33.2, Frequency of Cycles of High-Pressure and Low-Pressure Turbine Stop Control Valves | |
ML073440208 | 11 December 2007 | Request for Additional Information, License Amendment Request 07-004, Changes to Technical Specifications to Revise Thermal Power from 3458 Mwt to 3612 Mwt (TACs MD6615 & MD6616) | Safe Shutdown Shutdown Margin Fire Barrier Time Critical Operator Action Fire Protection Program |
ML080310869 | 8 February 2008 | Request for Additional Information, Iolb, Emcb, Eeeb Tech Branches, License Amendment Request 07-004, Changes to Technical Specifications to Revise Rated Thermal Power from 3458 Mwt to 3612 MWT.(MD6615/MD6616) | Unanalyzed Condition Operator Manual Action |
ML080320014 | 4 February 2008 | Request for Additional Information, License Amendment Request Associated with Methodology Used to Establish Core Operating Limits | |
ML080370199 | 5 February 2008 | Notification of Inspection (NRC Inspection Report 05000445-08-003 and 05000446-080-03) and Request for Information | Boric Acid Nondestructive Examination VT-2 |
ML080660224 | 12 March 2008 | Request for Additional Information Relief Request B-2 | |
ML080790545 | 31 March 2008 | Request for Additional Information, License Amendment Request 07-004, Changes to Technical Specifications to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt (De/Eeeb Follow-up RAI) | Mission time |
ML081780397 | 30 June 2008 | Request for Additional Information Related to Response to NRC Bulletin 2007-01, Security Officer Attentiveness | |
ML083050636 | 10 November 2008 | Request for Additional Information Relief Request P-2 for Inservice Testing Plan for Pumps and Valves | |
ML083120002 | 19 November 2008 | Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request | B.5.b Mitigating Strategies |
ML090630503 | 11 March 2009 | Request for Additional Information Regarding Steam Generator Tube Inservice Inspections During Refueling Outage 10 | |
ML090910442 | 8 April 2009 | Request for Additional Information Regarding Steam Generator Tube Inservice Inspections During the Thirteenth Refueling Outage | |
ML091660422 | 11 May 2009 | Request for Additional Information Supplemental Responses to Generic Letter (GL) 2004-02 Dated 02/29/2008 and 11/26/2008 | Mission time Coatings |
ML091670738 | 15 July 2009 | Request for Additional Information Supplemental Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Mission time Coatings |
ML092020579 | 23 July 2009 | Request for Additional Information Regarding the Permanent Alternate Repair Criteria License Amendment | Finite Element Analysis |
ML092150260 | 11 August 2009 | Request for Additional Information and Topics Discussed During 7/30/09 Conference Call, License Amendment Request Permanent Alternate Repair Criteria | Finite Element Analysis |
ML092640556 | 25 September 2009 | Request for Additional Information Related to Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | |
ML093480455 | 23 December 2009 | Request for Additional Information, Emergency Plan Changes to Implement Nuclear Energy Institute (NEI) 99-01, Revision 5, Methodology for the Development of Emergency Action Levels | |
ML100271802 | 29 January 2010 | Request for Additional Information Related to Request for Delaying Code of Record for Inservice Inspection Program | |
ML100960181 | 12 April 2010 | Request for Additional Information, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, to Extend Completion Time on a One-time Basis | Safe Shutdown Offsite Circuit |
ML101480994 | 28 May 2010 | CPSES - Licensed Operator Positive Fitness-for-Duty Test | Fitness for Duty |
ML102240517 | 12 August 2010 | E-mail TSTF -501 Amendment Request | |
ML110390700 | 7 February 2011 | Notification of Inspection (NRC Integrated Inspection Report 05000446-11-003) and Request for Information | Boric Acid Nondestructive Examination VT-2 |
ML110560831 | 2 March 2011 | Generic Request for Additional Information, License Amendment Request to Revise Facility Operating License and Approve the Cyber Security Plan | Cyber Security |
ML110960698 | 6 April 2011 | Email, Request for Additional Information, Relief Request (RR) C-6 & C-7 for Containment Spray Heat Exchanger and RR C-6 for Excess Letdown Heat Exchanger, Second 10-Year Inservice Inspection Interval | |
ML111260560 | 6 May 2011 | Request for Additional Information, Review of Biennial Decommissioning Report | |
ML111360885 | 16 May 2011 | Email, Request for Additional Information Relief Request (RR) B-11 for Piping Welds and RR B-10 for Safety Injection Piping, Second 10-Year Inservice Inspection Interval | |
ML111360998 | 16 May 2011 | Request for Additional Information, Relief Request (RR) B-11 for Piping Welds and RR B-10 for Safety Injection Piping, Second 10-Year Inservice Inspection Interval | |
ML111920132 | 11 July 2011 | Email, Request for Additional Information, Request for a Change to the Quality Assurance Plan Involving a Reduction in a Commitment | |
ML112990146 | 26 October 2011 | Request for Additional Information, Amendment Request to Adopt TSTF-425-A, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b. | Probabilistic Risk Assessment |
ML120250543 | 25 January 2012 | Email, Request for Additional Information Relief Request A-1 | Probabilistic Risk Assessment |
ML120270364 | 27 January 2012 | Correction to Email, Request for Additional Information, Relief Request A-1, Risk-Informed Alternative to Code Exam Requirements for Class 1 and 2 Piping Welds, Second 10-Year Inservice Inspection Interval | Probabilistic Risk Assessment |