ML080320014
| ML080320014 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/04/2008 |
| From: | Balwant Singal NRC/NRR/ADRO/DORL/LPLIV |
| To: | Blevins M Luminant Generation Co |
| Singal, Balwant, 415-3016, NRR/DORL/LPL4 | |
| References | |
| TAC MD5243, TAC MD5244 | |
| Download: ML080320014 (4) | |
Text
February 4, 2008 Mr. M. R. Blevins Executive Vice President
& Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs P. O. Box 1002 Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST ASSOCIATED WITH METHODOLOGY USED TO ESTABLISH CORE OPERATING LIMITS (TAC NOS. MD5243 AND MD5244)
Dear Mr. Blevins:
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated April 10, 2007, as supplemented by letters dated August 16 and November 15, 2007, TXU Generation Company LP (subsequently renamed Luminant Generation Company LLC) submitted a license amendment request for Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, to revise the requirements of Technical Specification (TS) 3.1, Reactivity Control Systems, TS 3.2, Power Distribution Limits, TS 3.3, Instrumentation, and TS 5.6.5b, Core Operating Limits Report (COLR), to incorporate standard Westinghouse-developed and NRC-approved analytical methods into the lists of methodologies used to establish the core operating limits.
Based on the review of the information submitted on November 15, 2007, the NRC staff has determined that the following additional information is required to complete the review of the application:
- 1.
Submit the Axial Offset Validity Criteria methodology and its technical basis for staff review and approval.
- 2.
Explain how CPSES, Units 1 and 2, will implement the burn-up dependency of the W(z) functions, where W(z) represents the largest expected increase in Fq (the heat flux hot channel factor) from allowed plant operation.
This request for additional information (RAI) was also sent to Mr. Jimmy Seawright via e-mail on January 31, 2008, and it was agreed that the licensee will provide the response to this request by February 15, 2008.
The NRC staff considers that timely responses to RAIs help ensure sufficient time is available for NRC staff to complete its review and contribute toward the NRCs goal of efficient and effective use of staff resources.
M. If you have any questions, please contact me at (301) 415-3016.
Sincerely,
/RA/
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446 cc: See next page
(*) Input memo dated OFFICE DORL/LPL4/PM DORL/LPL4/LA DSS/SRXB/BC DORL/LPL4/BC NAME BSingal JBurkhardt GCranston, SMiranda for THiltz DATE 2/4/08 2/1/08 2/4/08 2/4/08
Comanche Peak Steam Electric Station (10/2007) cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 2159 Glen Rose, TX 76403-2159 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq.
Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 County Judge P.O. Box 851 Glen Rose, TX 76043 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Ms. Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Anthony P. Jones Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711