Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000000/LER-1986-009, Ro:On 860312,discovered That LER 2-86-04 & LER 86-009 Not Submitted to Nrc.Caused by Misplaced Repts.Repts Telecopied to Nrc.Procedure for Distribution of Repts Revised | 14 April 1986 | Ro:On 860312,discovered That LER 2-86-04 & LER 86-009 Not Submitted to Nrc.Caused by Misplaced Repts.Repts Telecopied to Nrc.Procedure for Distribution of Repts Revised | |
AECM-84-0204, Special Rept 84-017/0:on 840304,Fire Doors 1A401 & OC219 Blocked Open to Support Maint Activities.Fire Watches Established Until Doors Restored | 6 April 1984 | Special Rept 84-017/0:on 840304,Fire Doors 1A401 & OC219 Blocked Open to Support Maint Activities.Fire Watches Established Until Doors Restored | |
BECO-85-220, Partially Withheld Security Event Rept:On 851204 Vertical Pipe Chase Not Locked.Lock Removed When Surveys Indicated Radiation Level Below Requirement for Locked High Radiation Level.Pipe Chase Will Be Secured | 9 December 1985 | Partially Withheld Security Event Rept:On 851204 Vertical Pipe Chase Not Locked.Lock Removed When Surveys Indicated Radiation Level Below Requirement for Locked High Radiation Level.Pipe Chase Will Be Secured | |
BECO-86-016, Partially Withheld Security Event Rept:On 860215 Security Officer Appeared to Be Asleep at Post at Vital Area Penetration.Unathorized Entry of Vital Area Did Not Occurr. Security Officer Relieved of Duty & Suspended | 20 February 1986 | Partially Withheld Security Event Rept:On 860215 Security Officer Appeared to Be Asleep at Post at Vital Area Penetration.Unathorized Entry of Vital Area Did Not Occurr. Security Officer Relieved of Duty & Suspended | |
BECO-86-125, Partially Withheld Security Event Rept:On 860826,bomb Threat Received.Search Initiated.No Suspicious Objects Found | 29 August 1986 | Partially Withheld Security Event Rept:On 860826,bomb Threat Received.Search Initiated.No Suspicious Objects Found | |
BECO-86-171, Partially Withheld Security Event Rept:On 861106,temporary Vital Area Barrier Insp Found Barrier Could Be Breached. Barrier Modified & Compensatory Security Measures Released | 10 November 1986 | Partially Withheld Security Event Rept:On 861106,temporary Vital Area Barrier Insp Found Barrier Could Be Breached. Barrier Modified & Compensatory Security Measures Released | |
BECO-86-173, Partially Withheld Security Event Rept:On 861107,HVAC Duct, Penetrating Vital Area,Removed by Contracted Craft Workers Before Notifying Security.Cause Not Stated.Security Oversight of Subj Contract Work Intensified | 12 November 1986 | Partially Withheld Security Event Rept:On 861107,HVAC Duct, Penetrating Vital Area,Removed by Contracted Craft Workers Before Notifying Security.Cause Not Stated.Security Oversight of Subj Contract Work Intensified | |
ML20065R400 | 20 October 1982 | Ro:On 821006,malfunction of Eberline AMS-3 Continuous Air Monitor Pump Caused Pump to Be Inoperable for Approx 1-h.No Loss of Significant Signals Indicated.Pump Repaired.Changes to Procedures or Equipment Under Review | |
ML20070J858 | 1 October 1976 | RO 76-12:on 760909,low Pressure Alarm Occurred on Safety Injection Accumulator C,Resulting in Pressure Reduction. Caused by Partially Open HCV 1936 & Body to Bonnet Leaks on HCV 1898 & 1549.Valves Repaired & Accumulator Repressurized | |
ML20070J868 | 20 October 1976 | RO 76-13:on 760916,normal Boric Acid Makeup to Vol Control Tank Could Not Be Accomplished Due to Plugging of Chemical & Vol Control Sys Line 1-inch-CH-56-152.Cause Unknown.Line Will Be Inspected for Indications of Solidification | Boric Acid |
ML20070J880 | 24 September 1976 | RO 76-07:on 760913,monthly Average of Gaseous & Airborne Particulate Wastes for Previous 12 Months Found Greater than Tech Spec Limit.Caused by Interpretational Changes in Tech Spec Section 3.11.B.New Limit Approved | |
ML20070J896 | 29 September 1976 | RO 76-05:on 760915,pressurizer Level Fell Below 45% Level Setpoint,Resulting in Decreases of Pressurizer Pressure & Vol Control Tank Level.Caused by Leaking Tube in Steam Generator A.Cause of Tube Failure Will Be Evaluated | |
ML20071F086 | 25 September 1980 | Ro:On 800912,sample Analysis Taken from Hydrazine Addition Tank Indicated Sodium Chloride in Tank.Anonymous Telcon Indicated Salt May Have Been Added Prior to Labor Strike by Unknown Persons | |
ML20077B473 | 10 May 1991 | Ro:On 910507,operator Failed to Perform Surveillances & Channel Tests for All 6 Scram Channels & 2 Interlocks Prior to Reactor Operation.Caused by Personnel Error. Tailgate Meeting Held & Mods to Hardware Initiated | |
ML20083Q031 | 16 August 1972 | Ro:Problem W/Electromatic Relief Valve Discovered During Annual Insp Outage.Info Re Leakage Detailed in . Weld Sealed Instead of Stitch Welded.Valve Fully Operable | |
ML20083Q035 | 2 June 1972 | Ro:Problem W/Electromatic Relief Valves Disclosed During Annual Insp Outage.Caused When Locking Screw,Part 8,on 6-inch Consolidated Electromatic Relief Valve Came Unscrewed | |
ML20083Q953 | 22 November 1972 | Ro:On 721111,during Plant Cooldown Following Reactor Scram,A Isolation Condensor Did Not Isolate Upon Actuation & Condensate Return Valve V-14-37 Did Not Open After B Condensor Isolated.Condensate Steam Line Sensors Repiped | |
ML20083Q956 | 22 August 1972 | Ro:On 720809,during Plant Cooldown,Isolation Condensors Would Not Operate.Caused by Needle on Differential Pressure Gauge Caught on Indicator Overtravel Stop.Needle Removed | Overtravel |
ML20083Q967 | 11 August 1972 | Ro:On 720804,during Routine Surveillance,Isolation Condensor Steam Line High Flow Differential Pressure Instrument Failed to Trip at Normal Trip Point.Caused by Loss of Tongue Tube Preload.New Bellows Assembly Installed on Switch | |
ML20084B670 | 7 June 1972 | Ro:On 720529,four Hanger Bolts for Torus Suction Header Found Failed.Cause Under Investigation.Ge Planning to Install 20 Vibration Detecting Sensors & Conduct Tests to Monitor Containment Sys Vibration & Torus Movement | Liquid penetrant |
ML20084B676 | 29 May 1972 | Ro:On 720529,torus Suction Header Discovered to Have Hanger Damage & Was Displaced from Normal Position.Caused by Four Hanger Bolts Failing.Reactor Shut Down.Cause Under Investigation | |
ML20084B691 | 30 May 1972 | Ro:On 720529,torus Suction Header Discovered to Have Hanger Damage & Was Displaced from Normal Position.Caused by Four Hanger Bolts Failing.Cause Under Investigation | |
ML20084B746 | 23 June 1972 | Ro:On 720525,loss of Auxiliary Power Test Conducted.Review of Test Revealed Power Supply for Bus 28/29-5 Transferred Automatically from Bus 29 to 28.Caused by Wiring Error | |
ML20084B759 | 24 May 1972 | AO 2-72-9:on 720524,essential Svc Motor Generator Set Failed to Transfer from Normal Ac Supply to Backup Dc Supply.Feed Water Control Sys Inoperable Resulting in Low Reactor Water Level Scram | |
ML20084D010 | 11 June 1974 | Telecopy Message of Ro:On 740611,8 of 31 Bergen-Paterson Hydraulic Piping Restraints within Drywell Found Defective. Caused by Loss of Hydraulic Fluid & Vibration of Cleanup Sys Header within Drywell.Repairs Initiated | |
ML20084D018 | 11 June 1974 | Telecopy Message of Ro:On 740611,8 of 31 Bergen-Paterson Hydraulic Piping Restraints within Drywell Found Defective. Caused by Loss of Hydraulic Fluid & Vibration of Cleanup Sys Header within Drywell.Repairs Initiated | |
ML20084D040 | 13 February 1974 | Telecopy Message of Ro:On 740211,12 of 31 Bergen-Paterson Hydraulic Piping Restraints within Drywell Found Defective Caused by Loss of Hydraulic Fluid.Restraints to Be Overhauled | |
ML20084D978 | 17 July 1973 | Ro:On 730219,three Control Rod Drives Apparently Uncoupled When Withdrawn During Startup.Control Rod Drives Rebuilt. Postulated Sequence of Events Resulting in Possible Uncoupling Based on Finding One Inner Filter Disconnected | Overtravel |
ML20084D993 | 13 March 1973 | Ro:On 730219,three Control Rod Drives Apparently Uncoupled When Withdrawn During Startup.Cause Will Be Determined During Next Outage.Rept of Disassembly & Insp Findings to Be Submitted on 730430 | Overtravel |
ML20084E567 | 9 July 1971 | Ro:On 710630,MSIV Failed to Close on Signal.Solenoid Operators on MSIV 1A Removed & Inspected and All Parts | |
ML20084E856 | 14 October 1970 | Ro:On 701004,core Deluge Valve 852B Malfunctioned.Caused by Seizure of Stem Nut to Valve Stem.New Stem Nut Installed | |
ML20084E918 | 14 April 1972 | Telecopy of RO 1-72-6:during Startup Test on Unit 1 Diesel Generator,Unit Failed to Operate Due to High Crankcase Pressure | |
ML20084G160 | 14 October 1969 | Ao:On 691002,startup Test Program Did Not Meet Insertion Times of Control Rods.Wire Mesh Will Be Removed,External Filters Will Be Exchanged & Scram Insertion Times Will Be Monitored | |
ML20084H335 | 24 December 1969 | Ro:Rise in Rate of Pressure for MSIV Observed & Shutdown Planned by 700201 to Retest Valves | |
ML20084K741 | 19 September 1974 | Telecopy Ro:On 740913,plant Shut Down to Investigate Source of Unidentified Leak in Drywell.Caused by Small Crack Through Pipe Wall in 4-inch Bypass Line on B-recirculation Loop.Ge Investigation Initiated | Safe Shutdown |
ML20084K773 | 13 September 1974 | Telecopy Ro:On 740913,unit Shut Down Upon Discovery of Leak on 2B Recirculation Pump Loop at Junction of Discharge Line & Recirculation Loop Between Pump & Discharge Valve. Investigation Continuing | Time of Discovery |
ML20084Q985 | 6 December 1969 | Ro:On 691120,one Rod Failed to Scram within Tech Spec Limit of 5.32 Seconds.Other Control Rods Took Excessive Time to Scram.No Cause Stated.Different Size Mesh Inner Rod Drive Strainers Installed | |
ML20084T789 | 23 July 1970 | Ro:On 700603,two MSIV Valve Closure Times Exceeded Tech Spec Requirements.Closure Times Readjusted.Importance of Test Data Rapid Analysis & Transmittal to Operating Personnel & Mgt re-emphasized | |
ML20084T899 | 12 June 1970 | Ro:On 700605,turbine Tripped & Reactor Scram Occurred.Caused by Spurious Control Sys Signal.Following Reactor Scram, Safety Valves Inadvertently Opened.Two Valves Failed to Close Fully Releasing Primary Coolant to Containment | |
ML20084T979 | 22 June 1970 | Telecopy Ro:On 700605,safety Valves Actuated Following Turbine Trip & Scram | |
ML20085E953 | 4 July 1975 | Telecopy Message of Ro:On 750703,facility Became Inoperable Due to Governor Problems.Manual Operation Possible.Lee Gas Turbine Could Not Be Tied in Through Isolated Line to Supply & Buy Power.Investigation Continuing | |
ML20085G966 | 22 December 1973 | RO 50-293/73-21:on 731203,HPCI Inverter Failed.Caused by Increasing Dc Battery Sys a Voltage to 140 Volts.Station Personnel Advised Against Increasing Voltage Above 135 Volts & Caution Tags Placed on Battery Chargers | |
ML20085K063 | 27 December 1973 | Ro:On 731208,during Routine Surveillance,Hpci High Flow Switch DPIS 3-2353 Operated at 25 Inches of Water Above Limit.Caused by Friction on Dial Indicator.Excess Slack of Wires Inside Switch Reduced | |
ML20085M395 | 29 October 1973 | Ro:Describing Possible Backseating Disc Mislocation Problem on 2-inch Darling Valves on S-350 Wdd Welding End.Valves Repaired.Valve Stems Will Be Changed During Next Refueling Outage | |
ML20086B143 | 29 October 1971 | Ro:On 710514,0819 & 0924,reactor Trip Breakers Failed to Open When Trip Signal Applied.After Investigation, Westinghouse Determined Undervoltage Device Latch Spring Pressure Improperly Set.Devices Adjusted | |
ML20086D514 | 6 January 1978 | Telecopy Ro:On 780105,discovered That One of Two Nuclear Engineering Co Model B3-1 Shipping Casks Provided w/1-inch Diameter Lid Bolts Rather than 1-1/4 Inch Size Specified in Certificate of Compliance 6058 | |
ML20086D520 | 14 December 1977 | Telecopy Ro:Heating Steam Coil Leak in Reactor Bldg Ventilation Supply Unit V-AH-4A Resulted in Freezing of Condensate at Inlet to Unit & Subsequent Inoperability of Associated Secondary Containment Isolation Dampers | |
ML20086D537 | 14 October 1977 | Telecopy Ro:Insp of Internal Torus Catwalk Support Structure Revealed That Catwalk Mitered Sections Not All Attached to Horizontal Catwalk Support Plates in Some Manner.Attachment Locations Will Be Upgraded | |
ML20086D550 | 13 October 1977 | Telecopy Ro:On 771012,local Leak Rate Testing of MSIV AO-2-80A & Nitrogen Instrument Air Sys Isolation Valve CV-7436 Indicated That Leakage Exceeded Tech Spec Acceptance Criteria.Cause Under Investigation | |
ML20086D554 | 5 October 1977 | Telecopy Ro:On 771004,local Leak Rate Testing of HPCI Sys Discharge Isolation Check Valve HPCI-9 Indicated That Leakage Exceeded Tech Spec Acceptance Criteria.Cause Under Investigation |