ML20086D554

From kanterella
Jump to navigation Jump to search
Telecopy Ro:On 771004,local Leak Rate Testing of HPCI Sys Discharge Isolation Check Valve HPCI-9 Indicated That Leakage Exceeded Tech Spec Acceptance Criteria.Cause Under Investigation
ML20086D554
Person / Time
Site: Monticello, 05000000
Issue date: 10/05/1977
From: Eliason L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19289B550 List:
References
NUDOCS 8312020380
Download: ML20086D554 (1)


Text

_

l') (v~')

Qg r~

p v

NBRm NORTHERN STATES POWER COMPANY

!UNr10iLLO, Miteit.WTA SS.% Z

~h ]

KO'vTTCTHD NUCLEAR GENERATING PLANT October 5, 1977 Mr. J. G. Keppler, Director Region III Office of Inspection and Enforcanent United States Nuclear Regulatory Comnission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

1D!CICFED NOCLFAR GENERATING PIM Docket No. 50-263 License No. DPR-22 On October 4,1977, local Icah rate testing of the liigh Pressure Coolant Injection System discharge isolation check valve HPCI-9, indicated that the leakage exceeded the Technical Specification acce,ptance criteria for individual isolation valves.

The Incasured Icahage was approximately 67.0 SCF)l.

The cause of the high Icakage rate is being investigated.

Yours very tmly,

/

t f-L. R. Eliason Plant Manager LRE/kik cc:

Director, Office of Management Infonnation G Program Control G Charnoff Minnesota Pollution Control Agency Attn: J W Feman File Copy sent by telecopier to Keppler.

8312020300 780426 PDR ADOCK 05000263 S

PDs b

h' Nb.

[0 f LL.