ML20086D554

From kanterella
Jump to navigation Jump to search
Telecopy Ro:On 771004,local Leak Rate Testing of HPCI Sys Discharge Isolation Check Valve HPCI-9 Indicated That Leakage Exceeded Tech Spec Acceptance Criteria.Cause Under Investigation
ML20086D554
Person / Time
Site: Monticello, 05000000
Issue date: 10/05/1977
From: Eliason L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19289B550 List:
References
NUDOCS 8312020380
Download: ML20086D554 (1)


Text

_

r~ p

, l')

v (v~') Qg NBRm NORTHERN STATES POWER COMPANY KO'vTTCTHD NUCLEAR GENERATING PLANT

!UNr10iLLO, Miteit.WTA SS.% Z ~h ]

October 5, 1977 Mr. J. G. Keppler, Director Region III Office of Inspection and Enforcanent United States Nuclear Regulatory Comnission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

1D!CICFED NOCLFAR GENERATING PIM Docket No. 50-263 License No. DPR-22 On October 4,1977, local Icah rate testing of the liigh Pressure Coolant Injection System discharge isolation check valve HPCI-9, indicated that the leakage exceeded the Technical Specification acce,ptance criteria for individual ,

isolation valves. The Incasured Icahage was approximately 67.0 SCF)l. The cause I of the high Icakage rate is being investigated.

Yours very tmly,

/ t f-L. R. Eliason Plant Manager LRE/kik cc: Director, Office of Management Infonnation G Program Control G Charnoff Minnesota Pollution Control Agency Attn: J W Feman File Copy sent by telecopier to Keppler.

8312020300 780426 PDR ADOCK 05000263 S PDs f LL. b h' Nb. [0