Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000277/2002301 | 24 July 2002 | IR 05000352-02-301, IR 05000353-02-301, IR 05000277-02-301, IR 05000278-02-301; May 31, June 3 - 6, 2002; Limerick Generating Station & Peach Bottom Atomic Power Station; Initial Limited Operator Licensing Examination | |
IR 05000277/2002302 | 6 November 2002 | IR Peach Bottom, Units 1 and 2, Reactor Operator and Senior Reactor Operator Initial Examination Report No. 50-277/02-302; 50-278/02-302 Dtd 11/6/02 | Job Performance Measure |
IR 05000277/2009302 | 18 January 2010 | NRC Examination Report 05000277-09-302; 05000278-09-302 | |
IR 05000277/2013301 | 9 May 2013 | Er 05000277-13-301 & 05000278-13-301, March 25-28, 2013, and April 4, 2013, Peach Bottom Atomic Power Station, Units 2 and 3, Initial Operator Licensing Examination Report | |
IR 05000277/2015301 | 18 May 2015 | Er 05000277/2015301; 05000278/2015301; March 23-30, 2015 and April 16, 2015; Peach Bottom Atomic Power Station, Units 2 and 3; Initial Operator Licensing Examination Report | |
IR 05000277/2017301 | 23 May 2017 | Initial Operator Licensing Examination Report 05000277/2017301 and 05000278/2017301 | |
IR 05000352/2002302 | 20 November 2002 | IR Limerick Generating Station Reactor Operator and Senior Reactor Operator Initial Examination Report No. 50-352/02-302; 50-353/02-302 | |
IR 05000352/2010302 | 8 November 2010 | Correction to Report Number: Limerick Generating Station, Units 1 and 2 - NRC Examination Report 05000352-10-302 and 05000353-10-302 | |
IR 05000352/2015301 | 14 May 2015 | NRC Initial Operator Licensing Examination Report Nos.05000352/2015301 and 05000353/2015301 | |
IR 05000352/2016301 | 21 March 2016 | Er 05000352/2016301 and 05000353/2016301; January 19 to 29, 2016; Limerick Generating Station, Units 1 and 2; Initial Operator Licensing Examination Report | |
IR 05000352/2017301 | 13 March 2017 | Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 | |
LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) | 9 April 2021 | 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) | |
ML011430172 | 4 May 2001 | Final - Section B Operating (RO & SRO) | Safe Shutdown Squib |
ML021500435 | 30 May 2002 | Senior Reactor and Reactor Operator Initial Examinations, Peach Bottom Atomic Power Station, Units 2 and 3, Dtd 5/30/02 | |
ML021690502 | 24 May 2002 | Draft - NRC Comments | Job Performance Measure |
ML021690527 | 24 May 2002 | Draft - Outlines (Facility Ltr Dtd 3/15/02) | Shutdown Margin Double blade guide |
ML021690565 | 24 May 2002 | Draft - Lsro Written | Shutdown Margin High Radiation Area Half scram Double blade guide Fuel cladding Power change |
ML021690605 | 24 May 2002 | Draft - Section a Operating (All Procedures Are with Final - Section a) | |
ML021690648 | 24 May 2002 | Draft - Section C Operating | Double blade guide |
ML021700213 | 24 May 2002 | Draft - Section B Operating | Double blade guide |
ML021700258 | 17 April 2002 | Final - Outlines (Change Summaries - Optical) | Shutdown Margin Double blade guide |
ML021700508 | 24 May 2002 | Final - Lsro Written | Shutdown Margin Reactor Vessel Water Level High Radiation Area Half scram Grab sample Squib Double blade guide Scram Discharge Volume Overtravel Power Operated Valves Fuel cladding Power change |
ML021700671 | 24 May 2002 | Final - Lsro Section a Operating | Safe Shutdown Shutdown Margin Offsite Dose Calculation Manual Operating Basis Earthquake Temporary Modification Double blade guide Foreign Material Exclusion Earthquake |
ML021710133 | 24 May 2002 | Final - Lsro Section B Operating (Limerick Category B) | Shutdown Margin Ultimate heat sink Test box Double blade guide Foreign Material Exclusion |
ML021710186 | 24 May 2002 | Final - Section C Operating | Safe Shutdown Offsite Dose Calculation Manual Operating Basis Earthquake Double blade guide Earthquake Deep Dose Equivalent |
ML021710497 | 24 May 2002 | Final - Lsro Section B Operating (Peach Bottom Category B) | Shutdown Margin Test box Double blade guide Foreign Material Exclusion Overtravel Control of Heavy Loads Loctite Locktite Flow Induced Vibration |
ML022030083 | 15 July 2002 | NRC Ltr Transmitting Certificates Dtd 07/15/2002 | |
ML022100226 | 24 May 2002 | Final - Qa/Related Forms | Job Performance Measure |
ML022970074 | 23 September 2002 | Final Qa/Related Forms | Job Performance Measure |
ML022970109 | 23 September 2002 | Draft - NRC Comments | |
ML022970126 | 23 September 2002 | Draft - Outlines (Facility Ltr Dtd 08/08/02) | |
ML022970174 | 23 September 2002 | Draft - RO & SRO Written | Safe Shutdown Packing leak High Radiation Area Grab sample Stroke time Time to boil Squib Scram Discharge Volume |
ML022970200 | 23 September 2002 | Draft - Section a Operating | Job Performance Measure Scaffolding |
ML022970219 | 23 September 2002 | Draft - Section B Operating | Job Performance Measure |
ML022970234 | 23 September 2002 | Draft - Section C Operating | Half scram Power change Downpower |
ML022970271 | 5 September 2002 | Final - Outlines (Change Summaries - Optional). Initial License Exam NRC Review Comments for 09/23/2002 Peach Bottom Exam | High Radiation Area |
ML022970351 | 23 September 2002 | Final - RO & SRO Written | Safe Shutdown Packing leak High Radiation Area Grab sample Stroke time Time to boil Squib Scram Discharge Volume |
ML022970354 | 30 May 2002 | Final - Section a Operating | Job Performance Measure Scaffolding |
ML022970359 | 30 May 2002 | Final - Section B Operating | Job Performance Measure |
ML022970361 | 30 May 2002 | Final - Section C Operating | Half scram Power change Downpower |
ML022970462 | 23 October 2002 | NRC Exam Notification Letter Dated 10/23/2002 | |
ML022980097 | 24 October 2002 | NRC Exam Notification Ltr Dtd 10/24/2002 | |
ML023100059 | 24 October 2002 | Final Qa/Related Forms | Job Performance Measure |
ML023100083 | 4 October 2002 | Draft - NRC Comments | |
ML023100110 | 17 July 2002 | Draft - Outlines (Facility Ltr. Dtd 07/17/02) | Squib Fuel cladding |
ML023100172 | 4 October 2002 | Draft - RO & SRO Written | Safe Shutdown High Radiation Area Half scram Stroke time Squib Scram Discharge Volume Overtravel Fuel cladding Continuous fire watch Hourly Fire Watch |
ML023100202 | 4 October 2002 | Draft - Section a Operating | Offsite Dose Calculation Manual Fire Watch |
ML023100225 | 4 October 2002 | Draft - Section B Operating | Squib |
ML023100238 | 4 October 2002 | Draft - Section C Operating | |
ML023100265 | 4 October 2002 | Final - Outlines (Change Summaries - Optional) | Fire impairment Squib Fuel cladding |