Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-86-855, Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl18 November 1986Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info EnclBackfit
ML17276A1762 November 1981Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl
ML20039G12929 December 1981Forwards Pertinent Matls Re Radiation Safety Task Force Activities.Related CorrespondenceEarthquake
ML20054F28627 May 1982Summary of 820506 Meeting W/Util & Sargent & Lundy in Bethesda,Md Re Program for Seismic Qualification of Equipment
ML20054J03017 June 1982Summary of 820430 Meeting W/Utils & Bechtel in Bethesda,Md Re Alternate Shutdown Panel & Related Fire Protection
ML20058E68824 July 1981Summary of 810714 Meeting Re Status of Independent Verifications at Facility & to Further Elaborate Plans. Action Plan Will Be Developed to Define Detail,Schedule & Indicate Personnel/Organization Assignments
ML20058M18622 September 1993Summary of Operating Reactors Events Meeting 93-35 on 930915
ML20127A7005 June 1985Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl
ML20127D15713 June 1985Summary of 850530 Operating Reactor Events Meeting to Brief Ofc Director,Div Directors & Representatives on Events Since 850515 Meeting.List of Attendees,Viewgraphs & Status of Assignments EnclShutdown Margin
ML20127J02813 June 1985Summary of 850514-15 Meetings & Site Visit W/Util in North Carolina Re Audit of Spds.List of Attendees & Viewgraphs EnclPost Accident Monitoring
ML20127N90224 June 1985Summary of Operating Reactors Events Meeting 85-10 on 850612.Only 3 of 17 Items Scheduled for Completion by 850531 Remain Incomplete.List of Attendees,Summary of Events Discussed & Status of Previous Assignments EnclScram Discharge Volume
ML20128A90613 May 1985Summary of 850507 Operating Reactors Events Meeting.List of Attendees,Events Discussed & Assignments Encl
ML20128C2515 November 1973Summary of 731101 Meeting W/Util,Bechtel,Ssi,Southern Svcs, USGS & Dept of Army,Chief of Engineers in Bethesda,Md Re Geology & Subsurface Exploration of Plant Site.List of Attendees & Review Status as of 730531 Encl
ML20128K74912 July 1985Summary of Operating Reactor Events Meeting 85-11 on 850701. List of Attendees,Events Discussed,Significant Elements of Events & Assignment of Followup Review Responsibility EnclScram Discharge Volume
ML20128N47722 May 1985Summary of Operating Reactors Events 850515 Meeting.Div Directors or Representatives Briefed on Events Occurring Since 850507 Meeting.Assignment of Followup Review Responsibilities Discussed.Attendance List EnclShutdown Margin
Scram Discharge Volume
ML20128Q5691 August 1979Summary of 790720 Meeting W/Util Re IE Bulletin 79-14.List of Util Questions & Answers & List of Attendees Encl
ML20132B7769 February 1981Summary of 810108 Meeting W/Util in Bethesda,Md to Discuss Results of Insp & Addl Testing Re Cadweld Splices.Supporting Documentation Encl
ML20132F08220 September 1982Summary of 820915 Meeting W/Util in Chicago,Il Re Proposed Util Investigation Into Gap Allegations Concerning Facilities.Util Agreed to Delay Investigation Until NRC Completes Investigation.Related Info Encl
ML20133E06625 July 1985Summary of 850628 Meeting W/Utils & Westinghouse Re Status of Development of New Upper Plenum Injection Evaluation Model.List of Attendees & Agenda Encl
ML20133E4631 October 1985Summary of Operating Reactors Events Meeting 85-17 on 850923.List of Attendees & Viewgraphs EnclScram Discharge Volume
ML20133F9947 October 1985Summary of Operating Reactors Events Meeting 85-16 on 850916 Re Briefing of Director,Div Directors & Representatives on Events Occurring Since 850909 Meeting.List of Attendees & Viewgraphs Encl
ML20133Q4175 September 1985Summary of 850823 Meeting W/Util in Atlanta,Ga Re Development of Scaling Factors for 10CFR61.55 Compliance. Attendance List Encl
ML20134B40629 January 1974Summary of 740117 Meeting W/Applicant in Chevy Chase,Md Re Remaining Areas of Concern on Mechanical Design of Facilities
ML20134B4329 April 1974Summary of 740405 Meeting W/Applicant in Bethesda,Md Re Design of Reactor Cavity for Facilities.List of Attendees EnclHydrostatic
Coatings
ML20136C51411 November 1985Summary of Operating Reactors Event Meeting 85-21 on 851028.List of Attendees,Events Discussed & Completion Dates Assigned Encl
ML20136G90815 November 1985Summary of 850522 Meeting W/Kansas Gas & Electric Co,Union Electric Co & Snupps in Bethesda,Md Re Snupps Spds.List of Attendees & Proposed Agenda Encl
ML20137K54717 January 1986Summary of 851218 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Combustible Gas Control Emergency Procedure Guideline.Attendees List,Draft Emergency Procedure Guideline & Viewgraphs EnclSafe Shutdown
ML20137X50929 November 1985Summary of Operator Reactor Events Meeting 85-24 on 851125 Re Briefing of Ofc Directors & Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851118.List of Attendees Encl
ML20138L44715 February 1984Summary of 840120 Meeting W/B Garde in Bethesda,Md Re Garde Concerns Expressed to J Axelrad Re Enforcement Action Against Midland for Violation of Board-ordered CP Conditions
ML20138M41517 October 1985Summary of 851004 Meeting W/B&W Owners Group Transient Assessment & Availability Committees in Bethesda,Md Re Operating Experience of Operating Reactors & Plans to Improve Experience.Viewgraphs EnclPacking leak
ML20138M92812 December 1985Summary of Operating Reactor Events Meeting 85-25 on 851202 Re Listed Events.Attendee List,Summary of Events Discussed & Viewgraphs EnclGrab sample
ML20138N55217 December 1985Summary of 851120 Meeting W/Hydrogen Control Owners Group Re Status & Results of Hydrogen Combustion Tests in quarter- Scale Test Facility (Mark Iii).Attendee List & Handouts Encl
ML20138N98419 December 1985Summary of 851122 Meeting W/Licensees & Westinghouse to Present Status of Program for Developing New Upper Plenum Injection Evaluation Model.Nonproprietary Viewgraphs,List of Attendees & Agenda EnclFuel cladding
ML20138P00821 October 1985Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007Half scram
ML20140B35017 January 1986Summary of 851219 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Heat Sink Modeling.List of Attendees & Viewgraphs Encl
ML20140B7176 October 1981Summary of 810917 Meeting w/C-E in Bethesda,Md Re Staff Positions on Accident & Transient Analyses for FacilityFuel cladding
ML20140G2644 October 1976Summary of 760921 Meeting W/Ge & Inel in Bethesda,Md Re Areas of Concern Developed During Review of Safety Relief Analytical Model Described in NEDE-20942-P.Attendance List Encl
ML20140G4979 February 1978Summary of 780119 Meeting W/Mark II Owners Group,Ge & BNL Re Status of safety-relief Valve Related Loads on Mark II Containment.Meeting Agenda,Attendee List & Presentation Matls Encl
ML20140G86823 April 1970Summary of 700422 Meeting W/Util & Dow Chemical Co Re Radioactivity of Process Steam to Be Exported to Dow.Fda Recommended Detector to Continuously Monitor Activity of Steam.Related Info Encl
ML20140G9061 May 1970Summary of Briefing of ACRS Subcommittee Chairman L Squires on AEC Requirements/Plans Re Licensing of Midland &/Or Dow Chemical Co for Use of Secondary Steam from FacilityGrab sample
Turbine Missile
ML20140G95124 May 1976Summary of 760521 Meeting W/Util in Bethesda,Md Re Proposed High Energy Line Break Analysis.Agenda Encl
ML20140H07130 September 1985Summary of ACRS Ad Hoc Subcommittee on Midland 820429 Meeting W/Util & Consultants in Washington,Dc Re Foundation Problems & Remedial ActionTornado Missile Protection
Earthquake
Control of Heavy Loads
Turbine Missile
ML20141E55226 September 1985Summary of ACRS Subcommittee on Reactor Operations 850910 Meeting in Washington,Dc to Discuss Recent Operating Occurrences.Fr Notice,Meeting Schedule & List of Meeting Slides Encl
ML20141E95018 November 1985Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda EnclScram Discharge Volume
ML20141F04630 December 1985Summary of Operating Reactors Events Meeting 85-28 on 851223.List of Attendees & Viewgraphs Encl
ML20141F40910 April 1986Summary of Operating Reactors Events Meeting 86-10 W/Ofc Director,Div Directors & Representatives Re Events Since 860324.Viewgraphs & Supporting Documentation Encl
ML20141G2907 April 1986Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl
ML20141N3189 November 1972Summary of 721102 Meeting W/Ge to Discuss BWR Torus Ring Header Hanger Failure,Design,Design Testing & Design Alteration ConsiderationsEarthquake
Liquid penetrant
ML20141N34720 May 1977Summary of 770411 Meeting W/Mark I Owners Group & GE to Discuss Structural Acceptance Criteria for Mark I Containment long-term Program.List of Attendees Encl
ML20141N35810 July 1978Summary of 780628 Followup Meeting W/Util,Ge Nutech,S&W & Sargent & Lundy Re Plans to Select & Install Quencher Safety/Relief Valve Discharge Device & Pool Dynamic Closure Rept.Attendance List & Viewgraphs Encl