Summary of 850628 Meeting W/Utils & Westinghouse Re Status of Development of New Upper Plenum Injection Evaluation Model.List of Attendees & Agenda Encl
ML20133E066
Person / Time
Site: Point Beach, Prairie Island, 05000000
Issue date: 07/25/1985
From: Di Ianni D, Diianni D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-08350, TAC-8350, NUDOCS 8508070560
Download: ML20133E066 (6)


Text

c July 25, 1985

[ h Docket Nos. 50-282 and 50-306 FACILITIES: Prairie Island Unit Nos. I and 2 Point Beach Unit Nos. I and 2 LICENSEES: Northern States Power Company Wisconsin Electric Power Company

SUBJECT:

SUMMARY

OF JUNE 28, 1985 MEETING WITH LICENSEES AND WESTINGHOUSE REGARDING UPPER PLENUM INJECTION On June 28, 1985, the NRC staff met with Northern States Power Company (NSP), the licensee for Prairie Island Nuclear Generating Plant Unit Nos. I and 2, Wisconsin Electric Power Company (WEP), the licensee for Point Beach Unit Nos. I and 2, and Westinghouse, the contractor for developing a new Upper Plenum Injection (UPI) Evaluation Model (EM) for the two loop Westinghouse plants. The meeting was requested by the licensees to present the status on the development of a new Upper Plenum Injection Evaluation Model (UPI-EM). This meeting also served to resolve any of our concerns related to the program plans for developing UPI-EM that was submitted by the licensees' letters dated March 11 and April 19, 1985 for Northern States Power and Wisconsin Electric Power Company, respectively.

Copies of the viewgraphs and handouts are not included with this summary because of the proprietary nature of the material. A list of attendees and the agenda are enclosed (Enclosures 1 and 2).

By letters dated February 12 and 13, 1985 we issued an evaluation guidance to licensees identifying numerous deficiencies in the previous UPI-EM. The licensees responded to our evaluation guidance by the submittal of a program plan on March 11 and April 19, 1985 describing the development of a new ECCS evaluation model that would better account for UPI thermal and hydraulic effects.

Westinghouse, under contract to NSP and WEP, is developing a new UPI-EM using the methodology described in Commission Paper SECY-83-472. This meeting is the first of several meetings that will occur to keep the staff advised of the progress, resolve any problem areas and discuss any assumptions during develop-mental stages of the new UPI-EM. The objectives of the UPI development plan are to (1) address NRC's technical concerns on UPI ECCS behavior, (2) develop a new UPI LOCA model which complies with 10 CFR 50.46 and Appendix K requirements, and (3) identify LOCA margin for UPI ECC systems per SECY 83-472. Westinghouse will produce a realistic base case analysis for a generic UPI plant. Subsequent analyses would be corrected for biases and uncertainties according to the SECY 83-472 guidance. This will be followed by plant specific Apper. dix K calculations showing peak clad temperature (PCT) margin. The plant specific Appendix K calculation would also be compared to the calculation using the statistical methodology recommended in the Commission Paper, SECY 83-472. The staff finds that plans as submitted by letters dated March 11 and April 14, 1985 for Prairie Island and Point Beach and discussed in this meeting are acceptable.

However the following comments should be considered.

8508070560 850725 PDR ADOCK 05000266 P PDR

1. The generic realistic base case calculation should not show the PCT rising above 1600 F. If analyses show PCT rising above 1600"F, then the matter should be brought to the staff's attention.
2. The next status report meeting is scheduled for Mid-September 1985.

This meeting date could be advanced if progress in the program deems it so.

Westinghouse should consider the use of a statistician in the 3.

statistical analysis of the most difficult parameters for the sen-sitivity studies that would be applied to generic base case curves Westinghouse will take this comment under advisement.

4. A clear statement of criteria should be developed for the COBRA-TRAC code validations of the Japanese cylindrical core test facility data.
5. The plant specific analysis for Point Beach would be submitted 6 months after receipt of the NRC safety evaluation on the generic realistic base case methodology. The staff finds this planned schedule for submitting the plant specific analysis acceptable.

Dominic C. Di Ianni, Project Manager Operating Reactors Branch #3, DL

Enclosures:

As stated

! -0RB#3:DL ORB #3:DL OR d l P er DDi Ianni:dd E uteier l 7/ /85 7/g5/85 I

..,e- - . - - - -

v- -, - - - ,

Mr. D. M. Musolf Prairie Island Nuclear Generating Northern States Power Company . Plant cc:

. Gerald Charnoff. Esq.

Shaw, Pittman, Potts and-Trowbridge 4

1800 M Street, NW Washington, DC 20036 Executive Director Minnesota Pollution Control Agency 1935 W. County Road, B2-Roseville, Minnesota 55113 Mr. E. L. Watzl, Plant Manager Prairie Island Nuclear Generating Plant Northern States Power Company Route 2 Welch, Minnesota 55089 Jocelyn F. Olson, Esq.

Special Assistant Attorney General Minnesota Pollution Control Agency 1935 W. County Road, 82 Roseville, Minnesota 55113 U.S. Nuclear Regulatory Commission Resident Inspector's Office.

Route #2, Box 500A i Welch, Minnesota 55089 Regional-Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road s Glen Ellyn, Illinois 60137 Mr. William Miller, Auditor

.Goodhue County Courthouse Red Wing, Minnesota 55066 J

J.

Enclosure 1 JUNE 28, 1985 MEETING UPI ATTEUUEES David Langford NRC/NRR/ DST /RSB Tom . Parker NSP.

Michael Young Westinghouse L. E. Hochreiter Westinghouse Sue Dederer Westinghouse

~ R.K. Hanneman Wisconsin Electric Power Company Rick J. Kohrt Wisconsin Electric Power Company Ken Wolfe MPR Jimmy Chow Westinghouse Dom Di Ianni NRC/DL/0RB3 Jose' Reyes NRC/RSAB Richard Lee NRC/RES Harry Balukjian NRC/CPB i Tim Collins NRC/TSIP Gerry Neils NSP 4

p y,-- y ,

soc lChur e 2

~

WISCONSIN ELECTRIC POWER COMPANY'S AND NORTHERN STATES POWER COMPANY'S MEETING WITH THE NRC STAFF ON THE STATUS OF THE UPI MODEL DEVELOPMENT June 28, 1985 I. Introduction - 10 min T Parker II. Overview of Westinghouse UPI Plan - 45 min L Hochreiter III. Status of Specific Tasks A. Detailed UPI Model - 30 min J Chow B. Production UPI Model - 30 min S Dederer IV. COBRA / TRAC Validation - 30 min L Hochreiter V. Sensitivity Studies to Assess Uncertainty - 15 min M Young VI Conclusions G Neils

MEETING

SUMMARY

DISTRIBUTION Licensees: Northern States Power Wisconsin Electric Power Company

  • Copies also sent to those people on service (cc) list for subject plant (s).

Docket File NRC PDR L PDR ORB #3 Meeting Sumary File DDilanni TColburn EButcher BGrimes OELD EJordan, IE

-ACRS-10 PMorriette HThompson Glainas.

MFairtile CMiller NRC Meeting

Participants:

DLangford JReyes TCollins HBalukjian RLee

.