MONTHYEARML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20195F4011998-11-13013 November 1998 Summary of 980915 Meeting with NEI License Renewal Task Force in Rockville,Md Re Prioritization of Generic License Renewal Issues for Resolution.List of Meeting Attendees, Resolution Criteria & List of Issues Encl ML20211A0161997-09-16016 September 1997 Summary of 970828 Meeting W/B&Wog Re Mgt of Aging Effects for Reactor Vessel Internals & Activities Related to Baffle Bolting Integrity Issues.List of Attendees & Their Affiliation & Handouts Encl ML20134P2561997-02-20020 February 1997 Summary of Operating Reactors Events Briefing 97-01 on 970212.List of Attendees,Significant Elements of Discussed Events & Reactor Scram Statistics for Listed Wks Encl ML20129K3791996-11-21021 November 1996 Summary of 961016 Meeting W/Dpc at Plant Re Ongoing Current Licensing Issues & Safety Initiatives at Three Nuclear Stations.Meeting Attendees,Agenda & Handouts Encl ML20129G3141996-10-23023 October 1996 Summary of Operating Reactors Event Briefing 96-12 on 961016.List of Attendees,Significant Elements of Discussed Events & Reactor Scram Statistics for Wks Ending 960922,29 & 1006 & 13 Encl ML20057F1471993-10-0606 October 1993 Summary of Operating Reactors Events Meeting 93-37 on 930929 ML20057D0761993-09-27027 September 1993 Summary of 930903 Meeting W/Util in Rockville,Md Re Ways Util Might Improve Quality & Completeness of Plant Licensing Submittals.List of Meeting Attendees & List of Specific Licensing Submittals Discussed During Meeting Encl ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20248K3761989-04-10010 April 1989 Summary of Operating Reactors Events Meeting 89-014 on 890405.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams for Wk Ending 890402 Encl ML20247F1991989-03-24024 March 1989 Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20245H8011989-02-23023 February 1989 Summary of Operating Reactors Events Meeting 89-08 on 890222.Attendee List & Events Discussed & Significant Elements of Events Encl ML20235M1671989-02-17017 February 1989 Summary of Operating Reactors Events Meeting 89-07 on 890215.List of Attendees,List of Events Discussed,Summary of Events for Long Term Followup or Input to NRC Performance Indicator Program & Summary of Reactor Scrams Encl ML20196B9821988-12-0101 December 1988 Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20195H0271988-11-25025 November 1988 Summary of Operating Reactor Events Meeting 88-46 on 881122 ML20206E3591988-11-10010 November 1988 Summary of Operating Reactors Events Meeting 88-44 on 881108.List of Meeting Attendees,Significant Events & Summary of Reactor Scrams Encl.One Significant Event Identified for Input to Performance Indicator Program ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML20207M0771988-10-0505 October 1988 Summary of Operating Reactors Events Meeting 88-39 on 881004.List of Attendees & Viewgraphs Encl ML20207K9461988-10-0404 October 1988 Summary of 880830 Meeting W/Util in Rockville,Md Re Fire protection-related Issues.Draft Fire Protection Engineering Evaluation, Cables on Svc Bldg Outside Wall & List of Attendees Encl ML20245D8411988-09-28028 September 1988 Summary of Operating Reactors Events Meeting 88-38 on 880927 Re Events Which Occurred Since Last Meeting on 880920 ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20154F7971988-09-15015 September 1988 Summary of 880901 QA Meeting W/Util in Rockville,Md to Discuss Rev 2 of Util Operational QA Plan for Plants.Agenda & List of Participants Encl ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153G6331988-08-30030 August 1988 Summary of Operating Reactor Events Meeting 88-35 on 880830, Including Summary of Reactor Scrams for Wk Ending 880828. Significant Event Identified for Input to NRC Performenance Indicator Program ML20153C1861988-08-23023 August 1988 Summary of Operating Reactors Events Meeting 88-34 on 880823 1999-06-29
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20195F4011998-11-13013 November 1998 Summary of 980915 Meeting with NEI License Renewal Task Force in Rockville,Md Re Prioritization of Generic License Renewal Issues for Resolution.List of Meeting Attendees, Resolution Criteria & List of Issues Encl ML20211A0161997-09-16016 September 1997 Summary of 970828 Meeting W/B&Wog Re Mgt of Aging Effects for Reactor Vessel Internals & Activities Related to Baffle Bolting Integrity Issues.List of Attendees & Their Affiliation & Handouts Encl ML20134P2561997-02-20020 February 1997 Summary of Operating Reactors Events Briefing 97-01 on 970212.List of Attendees,Significant Elements of Discussed Events & Reactor Scram Statistics for Listed Wks Encl ML20129K3791996-11-21021 November 1996 Summary of 961016 Meeting W/Dpc at Plant Re Ongoing Current Licensing Issues & Safety Initiatives at Three Nuclear Stations.Meeting Attendees,Agenda & Handouts Encl ML20129G3141996-10-23023 October 1996 Summary of Operating Reactors Event Briefing 96-12 on 961016.List of Attendees,Significant Elements of Discussed Events & Reactor Scram Statistics for Wks Ending 960922,29 & 1006 & 13 Encl ML20057F1471993-10-0606 October 1993 Summary of Operating Reactors Events Meeting 93-37 on 930929 ML20057D0761993-09-27027 September 1993 Summary of 930903 Meeting W/Util in Rockville,Md Re Ways Util Might Improve Quality & Completeness of Plant Licensing Submittals.List of Meeting Attendees & List of Specific Licensing Submittals Discussed During Meeting Encl ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20248K3761989-04-10010 April 1989 Summary of Operating Reactors Events Meeting 89-014 on 890405.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams for Wk Ending 890402 Encl ML20247F1991989-03-24024 March 1989 Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20245H8011989-02-23023 February 1989 Summary of Operating Reactors Events Meeting 89-08 on 890222.Attendee List & Events Discussed & Significant Elements of Events Encl ML20235M1671989-02-17017 February 1989 Summary of Operating Reactors Events Meeting 89-07 on 890215.List of Attendees,List of Events Discussed,Summary of Events for Long Term Followup or Input to NRC Performance Indicator Program & Summary of Reactor Scrams Encl ML20196B9821988-12-0101 December 1988 Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20195H0271988-11-25025 November 1988 Summary of Operating Reactor Events Meeting 88-46 on 881122 ML20206E3591988-11-10010 November 1988 Summary of Operating Reactors Events Meeting 88-44 on 881108.List of Meeting Attendees,Significant Events & Summary of Reactor Scrams Encl.One Significant Event Identified for Input to Performance Indicator Program ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML20207M0771988-10-0505 October 1988 Summary of Operating Reactors Events Meeting 88-39 on 881004.List of Attendees & Viewgraphs Encl ML20207K9461988-10-0404 October 1988 Summary of 880830 Meeting W/Util in Rockville,Md Re Fire protection-related Issues.Draft Fire Protection Engineering Evaluation, Cables on Svc Bldg Outside Wall & List of Attendees Encl ML20245D8411988-09-28028 September 1988 Summary of Operating Reactors Events Meeting 88-38 on 880927 Re Events Which Occurred Since Last Meeting on 880920 ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20154F7971988-09-15015 September 1988 Summary of 880901 QA Meeting W/Util in Rockville,Md to Discuss Rev 2 of Util Operational QA Plan for Plants.Agenda & List of Participants Encl ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153G6331988-08-30030 August 1988 Summary of Operating Reactor Events Meeting 88-35 on 880830, Including Summary of Reactor Scrams for Wk Ending 880828. Significant Event Identified for Input to NRC Performenance Indicator Program ML20153C1861988-08-23023 August 1988 Summary of Operating Reactors Events Meeting 88-34 on 880823 ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed 1999-06-29
[Table view] |
Text
} pge *'Err, o OC V'd H P UNITED STATES
'o$
" . ' l ' , 3 . ,. q NUCLEAR REGULATORY COMMISSION
' $,[,' , jh{} f 101 M arf E1 T A ST., N W., Suli! 1100 f A TL AN T A, t.E(sRGf A 30141 AUG 011979 SSINS 50-269, 270, 287 MEMORANDUM FOR: Files TilRU: i
. E. Murphy, Chief, RC&ES Branch A. R. Herdt, Chief, ESS # 2, RC&ES Branch FROM: L. Modenos, Reactor Inspector, ESS # 2, RC6ES Branch
SUBJECT:
DUKE POWER COMPANY MEETING - RE - IE BULLETIN 79-14 (DOCKET 50-269, 270 and 50-287)
On July 20, 1979, IE RII RC&ESB and RONS staff met with Duke Power Company (DPC) representatives to discuss DPC intentions and questions regarding IE Bulletin 79-14. Enclosure (1) is a listing of the DPC questions and answers provided by IE RII either at the meeting or on subsequent conversations.
Enclosure (2) is a listing of attendees at the meeting.
~
R v C.L L. Modenos, Reactor Inspector, ESS # 2 RC&ES Branch
Enclosures:
As Stated 8507270010 850610 PDR FOIA HERRMAN85-301 PDR
(' )
- 5
- i. i
't
^N 3 ENCI.OSURE (1)
Duke Power Company Questions Regarding IE Bu11etin.19-14
- 1. Q. Can any relief be provided for multiple units of a multiple unit site?
A. . Work aust be performed for each unit within the time frame of the Bulletin. Must Justify any deviation f rom the time f rame of the Bulletin.
- 2. Q. What inspections are required for verifying " Support and Restraint Design".
A. Verify that the physical configuration complies with appitcable drawings. In the case of special materials, verify material conformance with applicable requirements.
- 3. Q. What inspections are required for verifying embedments?-
.- A. Verify conformance with' support and restraint drawings. Structural Dwgs and U. T. are not required.
- 4. Q. Do seismic inputs or spectrum curves required as a source? q A. No. Only physical sources are required.
- 5. Q. Does the Bulletin apply to 4" diameter pipe analyzed by alternate methods?
A. Yes. 2 and above muat be met.
- 6. Q. Does the Bulletin apply to systems that have been upgraded to safety related but not had been seismically nnalyzed?
A. Must be looked at or justify. utherwise.
- 7. Q. Can spring, rod hangers and other supports that do not contribute to seismic support be disregarded?
A. Yes.
- 8. Q. Reactor Coolant Piping Supports are on components - not on piping -
Do they have to inspect this piping?
- A. Yes. The piping configuration.
- 9. Q. What are the guidelines for removal of insulation?
A. Remove insulation on all supports that are attached to safety related pipe. Remove as much insulation as possible elsewhere to verify l as built condition. Justification must be provided for insulation l not removed.
t
\.
e
- 10. Q. Component supports do they have to be inspected?
A. If nozzle is assumed to be an anchor verify that the nozzle would function as it was intended to be. Component supports should be verified.
t 9
1 M
e i.
A
a, .
a ENCLOSURE (2)
July 20 79-14 Bulletin (DPCO)
Nick Economos, Acting Chief, Engineering Support Section #2 Charles E. Murphy, Chief, Reactor Construction and Engineering Support Branch R. L. Gill, Licensing, Duke Power Company
' D. L. Rehn, Civil Engineer, Duke Power Company R. B. Priory, Civil Engineer, Duke Power Company W. H. Scheffler, M/N, Duke Power Company A. L. Snow, M/N, Duke Power Company L. Modenos, Reactor Inspector, U. S. Nuclear Regulatory Commission W. P. Ang, Reactor Inspector, U. S. Nuclear Regulatory Commission R. C. Lewis, Chief, RONS Branch, U. S. Nuclear Regulatory Commission E. H. Verdery, Chief, Reactor Projects Section #2, U. S. Nuclear Regulatory Commission
~
6 i.
//h SetSMic AMALYSIS AtJb AS-EulLT LEAdlN45 AC~l oM SCHEhJLE j SSU E 30 "'1T [lDENT:pv EULLE TI4 ^ l U S PECTlDM ELEMEklTS %-
4 AS-BUILf 4Nh 30 d 95 g 5 EEAAJA LY SIS PI20 GRAM lM5PECT OTHGR U
HALP 0F AccSsstBLE -
6odos ~
luSPECT HAL=
OK. S457EHC $ ALL n,z, cp AccGSSIELE coau4cw wAccess- m ILuc sysreus
/ Nor cle [ Nor cK- -
I u ASAP 3
\
1 .
Y SArl5:Y TEC.H &
l b y S P E c. A c r i o t4 I
- STAR 5k13tJT *
}
{
Reset ve 1 b N OM to4 por<.M ANCE
/
1 M- Ee.f.o(Y So MIE.C.
cp Acan TN3 in Ise 79-14