Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-85-160, Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed | 13 April 1984 | Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed | Safe Shutdown |
IA-86-778, Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl | 31 July 1986 | Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl | Earthquake Backfit |
IA-86-855, Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl | 18 November 1986 | Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl | Backfit |
ML18096A871 | 17 June 1992 | Summary of 920602 Meeting W/Nrc & Pse&G Re Sea Turtle Conservation Plan.Major Points Discussed in Meeting Listed | |
ML18139B967 | 13 July 1982 | Trip Rept of 820512-14 Visit to Facilities Re Radiological Effluent Tech Specs | Offsite Dose Calculation Manual Process Control Program Backfit |
ML20040C060 | 12 May 1976 | Summary of 760512 Meeting W/Nrc to Summarize Background Info on Steam Generator Tube Denting at Facilities | Flow Induced Vibration |
ML20054F286 | 27 May 1982 | Summary of 820506 Meeting W/Util & Sargent & Lundy in Bethesda,Md Re Program for Seismic Qualification of Equipment | |
ML20054J030 | 17 June 1982 | Summary of 820430 Meeting W/Utils & Bechtel in Bethesda,Md Re Alternate Shutdown Panel & Related Fire Protection | |
ML20054K944 | 16 June 1982 | Summary of 820527 Meeting W/Util & GE in Bethesda,Md Re J Humphrey Concerns Regarding Mark III Containment Sys. Util Requested to Provide Addl Info | |
ML20056B416 | 17 August 1990 | Summary of 900615 Meeting W/Licensee at Site to Discuss Licensing Activities.List of Attendees,Meeting Agenda, Handout & Licensee Comments on Draft Safety Evaluation of Fire Protection Program Encl | Safe Shutdown Fire Barrier FLEX Earthquake Fire Protection Program |
ML20056C523 | 18 June 1993 | Summary of 930602 Meeting W/Util Re Plant Proposal for Removing 2C Emergency Diesel Generator from TS as Part of Farley Implementation of Station Blackout Rule.List of Attendees Encl | Offsite Circuit |
ML20056D666 | 1 June 1993 | Summary of Operating Reactors Events Briefing 93-19 on 930526 | |
ML20056E212 | 15 June 1993 | Summary of Operating Reactors Events Meeting 93-21 on 930609 | |
ML20056H572 | 5 August 1993 | Summary of Operating Reactors Events Meeting 93-28 on 930728 | |
ML20058G308 | 19 November 1993 | Summary of Operating Reactors Events Meeting 93-43 on 931117 | |
ML20058K184 | 4 December 1990 | Summary of 901107 Meeting W/Util in Rockville,Md Re Steam Generator Tube Collapse Under Combined LOCA & Safe Shutdown Earthquake Loads | Safe Shutdown Earthquake |
ML20058P449 | 15 December 1993 | Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md Re 931021 Submittal of Proposed Alternative to 10CFR50.55a(f) & (g),10-Year Inservice Insp & Inservice Testing Update. List of Attendees Encl | Incorporated by reference Backfit |
ML20059C404 | 27 December 1993 | Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Licensee Proposed Changes to Security Plans for Plant,Units 1 & 2.List of Attendees Encl | |
ML20059C832 | 21 July 1993 | Summary of 398th ACRS Meeting on 930610-11 in Bethesda,Md Re SECY-93-113,public Comments on Advanced LWR Severe Accident Plant performance,SECY-93-067 & Reactor Operating Experience Related to Salem Unit 2 & Indian Point Unit 3 | Reactor Vessel Water Level Probabilistic Risk Assessment Chernobyl |
ML20059H758 | 3 January 1994 | Summary of Operating Reactors Events Meeting 93-48 on 931222 | |
ML20062B558 | 26 July 1982 | Summary of 820714 Meeting W/Applicant,Ge,Bechtel & Consultants in Bethesda,Md Re Mark III Containment Concerns of J Humphrey.Details of Action Plan & Schedule & Tentative Agenda for ACRS 820729-30 Meeting Encl | |
ML20062H481 | 28 November 1990 | Summary of 901023 Meeting W/Util Re Control Room Emergency Filtration Sys.Proposed Change to TS 3/4.7.2 & Handout Encl | Stroke time |
ML20062K324 | 28 November 1980 | Summary of 801030 Meeting W/Util & Bechtel Re Means by Which Power Cables in Containment Are Protected from Overcurrent. Draft Response to NRC Position 040.15 Encl | |
ML20079R092 | 18 June 1979 | Agenda for 790618 Meeting W/Nrc to Discuss Facility Const & Licensing.Related Info Encl | |
ML20079R105 | 14 September 1979 | Agenda for 790918-20 Caseload Forecast Panel Site Visit. Related Info Encl | |
ML20079R110 | 25 July 1980 | Agenda for 800729 Caseload Forecast Panel Site Visit. Related Info Encl | Coatings |
ML20079R129 | 24 August 1981 | Agenda for 810825 Meeting W/Nrc Caseload Forecast Panel to Conduct Plant Tour.Related Info Encl | |
ML20084K275 | 27 January 1971 | Trip Rept of 710120 Visit to Plant Re Plans for Replacement of Dome Concrete & Review of Specs for Work.Concrete Removal Operation Satisfactory | |
ML20098D112 | 5 April 1982 | Summary of 820405 Special Meeting of WPPSS Executive Board in Richland,Wa Re Status of Projects,Selection of Cost Effectiveness Study Consultant,Bpa Draft Power Load Forecast & Units 4 & 5 Termination Program | Hydrostatic |
ML20098D137 | 23 April 1982 | Summary of 820423,28 & 29 Regular Meetings of WPPSS Board of Directors in Richland,Wa Re Units 4 & 5 Termination Program, Claim Vouchers & BPA Finance Proposal.Notice of Adjournment for 820423 Meeting Encl | |
ML20098D199 | 23 April 1982 | Summary of 820423 Special Meeting of WPPSS Executive Board in Richland,Wa Re Financial Problems W/Continued Const of Facilities.Notices of Adjournment Encl | |
ML20117M362 | 11 January 1984 | Agenda for Util 840111 Performance Overview | Reactor Vessel Water Level High Radiation Area Non-Destructive Examination Fire Barrier Weld Overlay Hydrostatic Nondestructive Examination Scram Discharge Volume Process Control Program Systematic Assessment of Licensee Performance Control of Heavy Loads Fire Protection Program Fire Watch Overexposure |
ML20126D813 | 1 May 1973 | Trip Rept of 730424-25 Site Visit to Obtain First Hand Knowledge of Site & Environs & to Discuss Possible Problem Areas.Attendance List Encl | |
ML20126L233 | 1 May 1981 | Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation | |
ML20127A700 | 5 June 1985 | Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl | |
ML20127B510 | 13 April 1984 | Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed | Safe Shutdown |
ML20127D132 | 12 January 1993 | Summary of Operating Reactors Events Meeting 93-01 on 930106 | |
ML20127D157 | 13 June 1985 | Summary of 850530 Operating Reactor Events Meeting to Brief Ofc Director,Div Directors & Representatives on Events Since 850515 Meeting.List of Attendees,Viewgraphs & Status of Assignments Encl | Shutdown Margin |
ML20127H555 | 7 June 1985 | Summary of 850416 Meeting W/Util & Sutherland,Asbill & Brennan in Atlanta,Ga Re Licensing Activities.List of Meeting Attendees,Meeting Agenda & Licensee Handout Encl | Stroke time Scram Discharge Volume |
ML20127J028 | 13 June 1985 | Summary of 850514-15 Meetings & Site Visit W/Util in North Carolina Re Audit of Spds.List of Attendees & Viewgraphs Encl | Post Accident Monitoring |
ML20127N902 | 24 June 1985 | Summary of Operating Reactors Events Meeting 85-10 on 850612.Only 3 of 17 Items Scheduled for Completion by 850531 Remain Incomplete.List of Attendees,Summary of Events Discussed & Status of Previous Assignments Encl | Scram Discharge Volume |
ML20128A011 | 25 November 1992 | Summary of 920727 Meeting W/Util,Westinghouse & Pnl in Rockville,Md Re Discussions on Steam Line Break Leakage Issues Relating to Licensees SG Tube Alternate Plugging Criteria Proposal.List of Attendees Encl | |
ML20128A906 | 13 May 1985 | Summary of 850507 Operating Reactors Events Meeting.List of Attendees,Events Discussed & Assignments Encl | |
ML20128C126 | 25 November 1992 | Summary of 921026 Meeting W/Util in Houston County,Al Re Future Submittals Planned by Util,Status of NRC Review of Previous Submittals,Responses to Generic Communications,Nrc Concerns & General Coordination of Licensing Activities | Stroke time |
ML20128C251 | 5 November 1973 | Summary of 731101 Meeting W/Util,Bechtel,Ssi,Southern Svcs, USGS & Dept of Army,Chief of Engineers in Bethesda,Md Re Geology & Subsurface Exploration of Plant Site.List of Attendees & Review Status as of 730531 Encl | |
ML20128K541 | 21 May 1985 | Summary of 850429 Meeting W/Util & Bechtel Re Soil Structure Interaction for Standby Svc Water Basin.Viewgraphs & Attendees List Encl | Safe Shutdown |
ML20128K749 | 12 July 1985 | Summary of Operating Reactor Events Meeting 85-11 on 850701. List of Attendees,Events Discussed,Significant Elements of Events & Assignment of Followup Review Responsibility Encl | Scram Discharge Volume |
ML20128N477 | 22 May 1985 | Summary of Operating Reactors Events 850515 Meeting.Div Directors or Representatives Briefed on Events Occurring Since 850507 Meeting.Assignment of Followup Review Responsibilities Discussed.Attendance List Encl | Shutdown Margin Scram Discharge Volume |
ML20128Q352 | 10 July 1985 | Summary of 850530 Meeting W/Util in Bethesda Re Scope & Scheduling of Licensing Activities to More Effectively Schedule Resources to Complete Activities.List of Attendees & Agenda Encl | Safe Shutdown Stroke time Systematic Assessment of Licensee Performance |
ML20128Q367 | 11 July 1985 | Summary of 850619 Meeting W/Utils,Bechtel & GE Re Containment Suppression Pool Swell Through Encroached Areas. List of Attendees,Slides & Handouts Encl |