Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-85-160, Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed13 April 1984Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria ConfirmedSafe Shutdown
IA-86-778, Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl31 July 1986Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee EnclEarthquake
Backfit
IA-86-855, Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl18 November 1986Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info EnclBackfit
ML18096A87117 June 1992Summary of 920602 Meeting W/Nrc & Pse&G Re Sea Turtle Conservation Plan.Major Points Discussed in Meeting Listed
ML18139B96713 July 1982Trip Rept of 820512-14 Visit to Facilities Re Radiological Effluent Tech SpecsOffsite Dose Calculation Manual
Process Control Program
Backfit
ML20040C06012 May 1976Summary of 760512 Meeting W/Nrc to Summarize Background Info on Steam Generator Tube Denting at FacilitiesFlow Induced Vibration
ML20054F28627 May 1982Summary of 820506 Meeting W/Util & Sargent & Lundy in Bethesda,Md Re Program for Seismic Qualification of Equipment
ML20054J03017 June 1982Summary of 820430 Meeting W/Utils & Bechtel in Bethesda,Md Re Alternate Shutdown Panel & Related Fire Protection
ML20054K94416 June 1982Summary of 820527 Meeting W/Util & GE in Bethesda,Md Re J Humphrey Concerns Regarding Mark III Containment Sys. Util Requested to Provide Addl Info
ML20056B41617 August 1990Summary of 900615 Meeting W/Licensee at Site to Discuss Licensing Activities.List of Attendees,Meeting Agenda, Handout & Licensee Comments on Draft Safety Evaluation of Fire Protection Program EnclSafe Shutdown
Fire Barrier
FLEX
Earthquake
Fire Protection Program
ML20056C52318 June 1993Summary of 930602 Meeting W/Util Re Plant Proposal for Removing 2C Emergency Diesel Generator from TS as Part of Farley Implementation of Station Blackout Rule.List of Attendees EnclOffsite Circuit
ML20056D6661 June 1993Summary of Operating Reactors Events Briefing 93-19 on 930526
ML20056E21215 June 1993Summary of Operating Reactors Events Meeting 93-21 on 930609
ML20056H5725 August 1993Summary of Operating Reactors Events Meeting 93-28 on 930728
ML20058G30819 November 1993Summary of Operating Reactors Events Meeting 93-43 on 931117
ML20058K1844 December 1990Summary of 901107 Meeting W/Util in Rockville,Md Re Steam Generator Tube Collapse Under Combined LOCA & Safe Shutdown Earthquake LoadsSafe Shutdown Earthquake
ML20058P44915 December 1993Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md Re 931021 Submittal of Proposed Alternative to 10CFR50.55a(f) & (g),10-Year Inservice Insp & Inservice Testing Update. List of Attendees EnclIncorporated by reference
Backfit
ML20059C40427 December 1993Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Licensee Proposed Changes to Security Plans for Plant,Units 1 & 2.List of Attendees Encl
ML20059C83221 July 1993Summary of 398th ACRS Meeting on 930610-11 in Bethesda,Md Re SECY-93-113,public Comments on Advanced LWR Severe Accident Plant performance,SECY-93-067 & Reactor Operating Experience Related to Salem Unit 2 & Indian Point Unit 3Reactor Vessel Water Level
Probabilistic Risk Assessment
Chernobyl
ML20059H7583 January 1994Summary of Operating Reactors Events Meeting 93-48 on 931222
ML20062B55826 July 1982Summary of 820714 Meeting W/Applicant,Ge,Bechtel & Consultants in Bethesda,Md Re Mark III Containment Concerns of J Humphrey.Details of Action Plan & Schedule & Tentative Agenda for ACRS 820729-30 Meeting Encl
ML20062H48128 November 1990Summary of 901023 Meeting W/Util Re Control Room Emergency Filtration Sys.Proposed Change to TS 3/4.7.2 & Handout EnclStroke time
ML20062K32428 November 1980Summary of 801030 Meeting W/Util & Bechtel Re Means by Which Power Cables in Containment Are Protected from Overcurrent. Draft Response to NRC Position 040.15 Encl
ML20079R09218 June 1979Agenda for 790618 Meeting W/Nrc to Discuss Facility Const & Licensing.Related Info Encl
ML20079R10514 September 1979Agenda for 790918-20 Caseload Forecast Panel Site Visit. Related Info Encl
ML20079R11025 July 1980Agenda for 800729 Caseload Forecast Panel Site Visit. Related Info EnclCoatings
ML20079R12924 August 1981Agenda for 810825 Meeting W/Nrc Caseload Forecast Panel to Conduct Plant Tour.Related Info Encl
ML20084K27527 January 1971Trip Rept of 710120 Visit to Plant Re Plans for Replacement of Dome Concrete & Review of Specs for Work.Concrete Removal Operation Satisfactory
ML20098D1125 April 1982Summary of 820405 Special Meeting of WPPSS Executive Board in Richland,Wa Re Status of Projects,Selection of Cost Effectiveness Study Consultant,Bpa Draft Power Load Forecast & Units 4 & 5 Termination ProgramHydrostatic
ML20098D13723 April 1982Summary of 820423,28 & 29 Regular Meetings of WPPSS Board of Directors in Richland,Wa Re Units 4 & 5 Termination Program, Claim Vouchers & BPA Finance Proposal.Notice of Adjournment for 820423 Meeting Encl
ML20098D19923 April 1982Summary of 820423 Special Meeting of WPPSS Executive Board in Richland,Wa Re Financial Problems W/Continued Const of Facilities.Notices of Adjournment Encl
ML20117M36211 January 1984Agenda for Util 840111 Performance OverviewReactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Fire Barrier
Weld Overlay
Hydrostatic
Nondestructive Examination
Scram Discharge Volume
Process Control Program
Systematic Assessment of Licensee Performance
Control of Heavy Loads
Fire Protection Program
Fire Watch
Overexposure
ML20126D8131 May 1973Trip Rept of 730424-25 Site Visit to Obtain First Hand Knowledge of Site & Environs & to Discuss Possible Problem Areas.Attendance List Encl
ML20126L2331 May 1981Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation
ML20127A7005 June 1985Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl
ML20127B51013 April 1984Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria ConfirmedSafe Shutdown
ML20127D13212 January 1993Summary of Operating Reactors Events Meeting 93-01 on 930106
ML20127D15713 June 1985Summary of 850530 Operating Reactor Events Meeting to Brief Ofc Director,Div Directors & Representatives on Events Since 850515 Meeting.List of Attendees,Viewgraphs & Status of Assignments EnclShutdown Margin
ML20127H5557 June 1985Summary of 850416 Meeting W/Util & Sutherland,Asbill & Brennan in Atlanta,Ga Re Licensing Activities.List of Meeting Attendees,Meeting Agenda & Licensee Handout EnclStroke time
Scram Discharge Volume
ML20127J02813 June 1985Summary of 850514-15 Meetings & Site Visit W/Util in North Carolina Re Audit of Spds.List of Attendees & Viewgraphs EnclPost Accident Monitoring
ML20127N90224 June 1985Summary of Operating Reactors Events Meeting 85-10 on 850612.Only 3 of 17 Items Scheduled for Completion by 850531 Remain Incomplete.List of Attendees,Summary of Events Discussed & Status of Previous Assignments EnclScram Discharge Volume
ML20128A01125 November 1992Summary of 920727 Meeting W/Util,Westinghouse & Pnl in Rockville,Md Re Discussions on Steam Line Break Leakage Issues Relating to Licensees SG Tube Alternate Plugging Criteria Proposal.List of Attendees Encl
ML20128A90613 May 1985Summary of 850507 Operating Reactors Events Meeting.List of Attendees,Events Discussed & Assignments Encl
ML20128C12625 November 1992Summary of 921026 Meeting W/Util in Houston County,Al Re Future Submittals Planned by Util,Status of NRC Review of Previous Submittals,Responses to Generic Communications,Nrc Concerns & General Coordination of Licensing ActivitiesStroke time
ML20128C2515 November 1973Summary of 731101 Meeting W/Util,Bechtel,Ssi,Southern Svcs, USGS & Dept of Army,Chief of Engineers in Bethesda,Md Re Geology & Subsurface Exploration of Plant Site.List of Attendees & Review Status as of 730531 Encl
ML20128K54121 May 1985Summary of 850429 Meeting W/Util & Bechtel Re Soil Structure Interaction for Standby Svc Water Basin.Viewgraphs & Attendees List EnclSafe Shutdown
ML20128K74912 July 1985Summary of Operating Reactor Events Meeting 85-11 on 850701. List of Attendees,Events Discussed,Significant Elements of Events & Assignment of Followup Review Responsibility EnclScram Discharge Volume
ML20128N47722 May 1985Summary of Operating Reactors Events 850515 Meeting.Div Directors or Representatives Briefed on Events Occurring Since 850507 Meeting.Assignment of Followup Review Responsibilities Discussed.Attendance List EnclShutdown Margin
Scram Discharge Volume
ML20128Q35210 July 1985Summary of 850530 Meeting W/Util in Bethesda Re Scope & Scheduling of Licensing Activities to More Effectively Schedule Resources to Complete Activities.List of Attendees & Agenda EnclSafe Shutdown
Stroke time
Systematic Assessment of Licensee Performance
ML20128Q36711 July 1985Summary of 850619 Meeting W/Utils,Bechtel & GE Re Containment Suppression Pool Swell Through Encroached Areas. List of Attendees,Slides & Handouts Encl