Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML02325051922 November 2002Westinghouse, RAI, Topical Report on Modular Accident Analysis Program Version 5 (MAAP5) Pressurized Water Reactor (PWR) Large Dry Containment Model, WCAP-15844
ML07155011613 June 2007Request for Additional Information (RAI) Regarding Nuclear Energy Institute Topical Report (TR) WCAP-16294-NP, Rev. 0, Risk-Informed Evaluation of Changes to Technical Specification Required Action Endstates for Westinghouse NSSS PWRs.(MD51Mission time
ML07222012927 August 2007Request for Additional Information (RAI) Regarding Nuclear Energy Institute Topical Report (TR) WCAP-16308-NP, Pressurized Water Reactor Owners Group 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Station.Safe Shutdown
Probabilistic Risk Assessment
Large early release frequency
Severe Accident Management Guideline
ML10245061029 September 2010Westinghouse Electric Company (Westinghouse), Request for Withholding Information from Public Disclosure
ML10356039822 December 2010Meeting Announcement - Category 1 Public Meeting Predecisional Enforcement Conference Westinghouse Electric Company Docket No. 70-1151
ML11003076630 December 2010Responds to Notice of Violation and Proposed Imposition of Civil Penalty for Westinghouse Electric Company
ML11003077730 December 2010Response to Notice of Violation 70-1151-09-005-01
ML11010062622 December 2010Rescheduled Notice of Pre-decisional Enforcement Conference with Westinghouse Electric Company to Discuss Apparent Violations Associated with the Failure of Design Features of a Filter Press
ML1110105548 April 2011Westinghouse Electric Company LLC, Response for Additional Information Regarding Amendment Request for the Columbia Plant License ApplicationEarthquake
ML16161A4596 June 2016Request for Change in Applicant for the NRO Review of WCAP-16747, Appendices C and D, PPOLCA-T: System Analysis Code with Three-Dimensional Core Model
ML17338A4538 January 2018Verification Letter of the Approval Version of Westinghouse Electric Company Topical Report WCAP-17642-P/NP, Revision 1, Westinghouse Performance Analysis and Design Model(PAD5)
ML17352A01316 January 2018Request for Additional Information Westinghouse Electric Company WCAP-18032-P, Revision 0 and WCAP-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio Topical ReportMinimum Critical Power Ratio
ML17352A0188 January 2018Verification Letter of the Approval Version of Westinghouse Electric Company Topical Report WCAP-16996-P/WCAP-16996-NP, Volumes I, II, and III, Revision 1
ML18005A5365 January 2018Westinghouse - Response to Request for Additional Information (TAC # L33317)re License Renewal Application for Columbia Fuel Fabrication Facility
ML18018A00526 February 2018RAIs for WCAP-16096-P/NP, Revision 5 Software Program Manual
ML18022A07019 January 2018Westinghouse Electric Company - Nuclear Regulatory Commission Integrated Inspection Report No. 70-1151/2017-005
ML18025A62414 May 2018Westinghouse Electric Company, Request for Withholding Information from Public Disclosure WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement (Prop/Non-Pro
ML18039A0017 February 2018Westinghouse Public Meeting Summary February 2018
ML18064A1192 March 2018Westinghouse 2018 Lpr Letter
ML18073A22522 March 2018NRC Response - Threshold Determination
ML18087A40128 March 2018Westinghouse Consolidated Responses to Request for Additional Information with Revised SNM-1107 License Renewal Application
ML18089A06030 March 2018Westinghouse - NRC Inspection Report 07001151/2018006
ML18094A26030 April 2018Cover Letter Draft Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report WCAP-17203-P/WCAP-17203-NP, Revision 0-2, Fast Transient and ATWS (Anticipated Transient Without Scram) Methodology
ML18115A12725 April 2018Westinghouse Electric Company - Nuclear Regulatory Commission Integrated Inspection Report Number 7001151/2018002 and Notice of Violation
ML18120A2493 May 2018Acceptance of Westinghouse Electric Company, LLC - Application for Consent to Indirect Change of Control
ML18130A73310 May 2018Westinghouse Public Meeting Summary May 2018
ML18134A2838 May 2018Review of Draft Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18124-NP, Revision 0, Fluence Determination with RAPTOR-M3G and Ferret (CAC No. MF9141)
ML18137A44723 May 2018Letter to Mr. Sweeney - Westinghouse License Transfer: Request for Additional Information
ML18141A5998 June 2018U.S. NRC Revised Acceptance for Review of Topical Report WCAP-16747-P/WCAP-16747-NP, Appendices C and D, POLCA-T: System Analysis Code with Three Dimension Core Model, Appendices C and D
ML18144A99424 May 2018Westinghouse Electric Company, LLC - Response to Request for Additional Information Regarding Application for NRC Consent to License Transfer (EPID L-2018-LLM-0001)
ML18156A01815 June 2018Cover Letter for the Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18124-NP, Revision 0, Fluence Determination with Raptor M3G and Ferret
ML18162A11428 June 2018Letter to Sweeney: Transfer of Control Approval Letter
ML18164A34113 June 2018Request for Continuation of the NRC Review of WCAP-15942-P-A / WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies, and Submittal of Slides to Support a Closed Meeting on June 14, 2018 to Discuss
ML18172A28721 June 2018Westinghouse - Transmittal of License Renewal Application
ML18176A20525 June 20182019 West Inspection Schedule (Non-Safeguards)
ML18200A02918 July 2018Westinghouse - NRC Integrated Inspection Report 07001151/2018003, Rev 2Fire Watch
ML18204A00920 July 2018Transmittal of WCAP-18124-NP-A, Revision 0, Fluence Determination with RAPTOR-M3G and Ferret, Dated July 2018
ML18204A0319 August 2018Transmittal Letter Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17203-P/WCAP-17203-NP, Revision 0-2, Fast Transient and ATWS Methodology
ML18207A2269 August 2018Cover Letter Request for Additional Information Westinghouse Electric Company Topical Report WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate Method for Subcritical Reactivity Measurement
ML18215A0313 August 2018Reply to Westinghouse Electric Company - Submittal of the Performance Evaluation of the S-1030 Scrubber System
ML18220A85416 August 2018Verification Letter of the Approval Version of Westinghouse Electric Company Topical Report WCAP-18-18124-NP, Revision 0, Fluence Determination with Raptor-M3G and Ferret
ML18257A06213 September 2018Response to Request for Additional Information Westinghouse Electric Company WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement.
ML18257A06313 September 2018Application for Withholding Proprietary Information from Public Disclosure
ML18260A3581 October 2018NRC Response to Mr. T. Clements Regarding Westinghouse Fuel Fabrication Facility
ML18263A19724 September 2018Request for Additional Information Westinghouse Electric Co. WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate Method for Subcritical Reactivity Measurement TR - Second RoundAnticipated operational occurrence
ML18270A0292 November 2018Final Safety Evaluation for WCAP-16096-P/NP, Revision 5 'Software Program Manual for Common Qtm System'Safe Shutdown
Commercial Grade Dedication
Cyber Security
Earthquake
ML18271A1355 October 2018U.S. Nuclear Regulatory Commission'S Response to Ms. Greenlaw Regarding Westinghouse Fuel Fabrication Facility
ML18278A1975 October 2018Westinghouse Electric Co., NRC Integrated Inspection Report 07001151/2018004, and Notice of ViolationDecommissioning Funding Plan
ML18284A09511 October 2018Errata - Westinghouse Electric Company - Nuclear Regulatory Commission Integrated Inspection Report Number 70-1151/2018-004 and Notice of ViolationDecommissioning Funding Plan
ML18288A12615 November 2018Westinghouse Electric Company - Request for Withholding Information from Public Disclosure