Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000395/LER-2017-00124 July 2017C MAIN FFFDWATER PUMP FAILURE '1'0 TRIP RESUI,TS IN LOSS OF EMERGENCY FE,EDWATER AUTO START ACTUATION SIGNAL
LER 17-001-00 for V.C. Summer, Unit 1, Regarding C Main Feedwater Failure to Trip Results in Loss of Emergency Feedwater Auto Start Actuation Signal
Past operability
Power change
05000395/LER-2017-00225 August 2017Low Feedwater Flow to the 'B' Steam Generator Causes Automatic Reactor Trip
LER 17-002-00 for V.C. Summer, Unit 1, Regarding Low Feedwater Flow to the 'B' Steam Generator Causes Automatic Reactor Trip
Stroke time
Power change
05000395/LER-2017-00326 October 2017FAILED LIGHTNING ARRESTER ON MAIN TRANSFORMER CAUSES REACTOR TRIP
LER 17-003-00 For Virgil C. Summer Nuclear Station, Unit 1, Regarding Failed Lightning Arrester On Main Transformer Causes Reactor Trip
Large early release frequency
Fuel cladding
05000395/LER-2017-0049 November 2017ACTUATION OF 'A' EMERGENCY DIESEL GENERATOR
LER 17-004-00 for V.C. Summer, Unit 1, Regarding Actuation of 'A' Emergency Diesel Generator
High winds
Large early release frequency
05000395/LER-2017-00522 December 2017AUTOMATIC REACTOR TRIP DUE TO MAIN TURBINE TRIP
LER 17-005-00 for V.C Summer, Unit 1, Regarding Automatic Reactor Trip Due to Main Turbine Trip
Large early release frequency
05000395/LER-2017-00615 December 2017TECHNICAL SPECIFICATION ACTION NOT MET FOR INOPERABLE OXYGEN MONITOR
LER 17-006-00 for Virgil C. Summer, Unit 1, Regarding Technical Specification Action not Met for Inoperable Oxygen Monitor
Grab sample
IR 05000028/200640118 January 2007NRC Inspection Report 05000269-06-401, 05000270-06-401 and 0500028-06-401. Cover Letter OnlyAffidavit
IR 05000028/201941331 October 2019Security Insp Report 5000280/ 2019413 and 500028/2019413
IR 05000395/20010105 February 2004IR 05000395-01-010, on 01/10/2002 - 01/21/2004, for Virgil C. Summer Nuclear Station; Triennial Baseline Fire Protection Inspection - Unresolved Item Significance Determination ReviewSafe Shutdown
Job Performance Measure
IR 05000395/200200229 July 2002IR 05000395-02-002 on 03/31/2002 - 06/29/2002, South Carolina Electric & Gas Co., Virgil C. Summer Nuclear Station. Non-Routine Evolution and Events - Reactor TripFitness for Duty
High Radiation Area
Offsite Dose Calculation Manual
Contraband
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Emergency Lighting
Locked High Radiation Area
Significance Determination Process
Process Control Program
Moisture barrier
Exclusive Use
IR 05000395/200200324 October 2002IR 05000395-02-003, on 09/28/02 for Virgil C Summer Nuclear Station. Post-Maintenance Testing, Identification and Resolution of ProblemsSafe Shutdown
Packing leak
Fire Barrier
Internal Flooding
Temporary Modification
Significance Determination Process
Earthquake
Fire Protection Program
Siren
IR 05000395/200200431 January 2003IR 05000395-02-004 on 09/29/02 - 01/04/2003 for Virgil C. Summer Nuclear Station. Non-Cited Violations NotedBoric Acid
Stroke time
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Foreign Material Exclusion
Earthquake
Maintenance Rule Program
Control of Heavy Loads
Power change
IR 05000395/20020078 November 2002IR 05000395-02-007, on 9/23-10/11/2002, South Carolina Electric & Gas Co., Virgil C. Summer, Safety System Design and Performance Capabiltity Biennial Baseline InspectionPower Uprate
IR 05000395/200300230 April 2003IR 05000395-03-002 on 04/05/02 for Virgil C. Summer Nuclear StationCommercial Grade Dedication
Enforcement Discretion
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Power change
IR 05000395/200300318 July 2003IR 05000395-03-003, on 04/06 - 06/28/03, South Carolina Electric & Gas Co; Virgil C. Summer; Heat Sink, Maintenance Effectiveness, Occupational Radiation Safety, Identification & Resolution of Problems, & Followup to Temporary Instruction (Offsite Dose Calculation Manual
Stroke time
Contraband
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
Earthquake
Biofouling
IR 05000395/200300427 October 2003IR 05000395-03-004, on 06/29/2003 - 09/27/2003; Virgil C. Summer Nuclear Station; Event FollowupHigh winds
Fire Barrier
Internal Flooding
Past operability
Temporary Modification
Significance Determination Process
Job Performance Measure
IR 05000395/200300526 January 2004IR 05000395-03-005, on 09/28-12/27/2003, Virgil C. Summer Nuclear Station. Non-Cited Violations NotedBoric Acid
Non-Destructive Examination
Coatings
Temporary Modification
VT-2
Aging Management
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Moisture barrier
Liquid penetrant
Pressure Boundary Leakage
Pressure boundary leak
Through Wall Leak
Power change
Unidentified leakage
IR 05000395/200300624 April 2003IR 05000395-03-006, on 03/10-14/2003, V.C. Summer, Unit 1; South Carolina Electric and Gas Company; Temporary Instruction(Ti) 2515/148, Verification of Compliance with Interim CompensatoryB.5.b
IR 05000395/200400216 April 2004IR 05000395-04-002, on 03/27/2004, for South Carolina Electric & Gas Company, Jenkinsville, Sc, Routine Integrated ReportBoric Acid
Operator Manual Action
Temporary Modification
VT-2
Condition Adverse to Quality
Significance Determination Process
Siren
IR 05000395/200400315 July 2004IR 05000395-04-003 on 03/28/2004 - 06/26/2004 for Virgil C. Summer Nuclear Station; Routine Integrated ReportTemporary Modification
VT-2
Significance Determination Process
Earthquake
Pressure Boundary Leakage
IR 05000395/200400418 October 2004IR 050000395-04-004, on 06/24/2004 - 09/25/2004; Virgil C. Summer Nuclear Station, Routine Integrated Inspection ReportHigh winds
Stroke time
Temporary Modification
Significance Determination Process
Siren
IR 05000395/200400610 June 2004IR 05000395-04-006; 04/26-30/2004, 05/10-14/2004; Virgil C. Summer Nuclear Station; Biennial Baseline Inspection of the Problem Identification and Resolution ProgramCoatings
Significance Determination Process
Maintenance Rule Program
IR 05000395/200400730 July 2004IR 05000395-04-007, on 06/07/2004 - 06/11/2004 & 06/21/2004 - 06/25/2004, Virgil C. Summer Nuclear Station; Triennial Fire ProtectionHot Short
Safe Shutdown
Fire Barrier
Emergency Lighting
Condition Adverse to Quality
Significance Determination Process
Fire Protection Program
IR 05000395/200400922 December 2004IR 05000395-04-009 on 10/04/2004 - 10/08/2004, 10/25/2004 - 10/29/2004 and 11/08/2004 - 11/19/2004 for Virgil C. Summer Nuclear Station; Temporary Instruction 2515/158, Function Review of Low Margin/Risk Significant Components and OperatorSafe Shutdown
Ultimate heat sink
Stroke time
Tornado Missile
Probabilistic Risk Assessment
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Tornado Missile Protection
Time Critical Operator Action
Battery sizing
Operability Assessment
IR 05000395/200500219 April 2005IR 05000395-05-002, on 03/31/2005, V C Summer StationSignificance Determination Process
IR 05000395/200500329 July 2005IR 05000395-05-003, on 04/01-06/30/2005, Virgil Summer, Inservice Inspection Activities, Operator Performance During Non-Routine Evolutions and Events, and Refueling and Outage ActivitiesBoric Acid
High Radiation Area
Nondestructive Examination
VT-2
Locked High Radiation Area
Significance Determination Process
Process Control Program
Offsite Circuit
IR 05000395/200500428 October 2005IR 05000395-05-004 on 07/01/2005 - 09/30/2005 for South Carolina Electric & Gas (Sce&G) Company; Virgil C. Summer Nuclear Station; Routine Integrated ReportTemporary Modification
Significance Determination Process
Job Performance Measure
IR 05000395/200500524 January 2006IR 05000395-05-005, on 10/01/2005 - 12/31/2005; Virgil C. Summer Nuclear Station; Routine Integrated ReportCommercial Grade Dedication
Temporary Modification
Significance Determination Process
Through Wall Leak
Downpower
IR 05000395/200500614 January 2005EA-05-008, V. C. Summer, IR 05000395-05-006, Preliminary White FindingSafe Shutdown
High winds
Mission time
Significance Determination Process
Earthquake
Preliminary White Finding
IR 05000395/200500710 March 2005Final Significance Determination for a Green Finding (NRC IR 05000395/2005007 Virgil C. Summer Nuclear Station)Condition Adverse to Quality
Significance Determination Process
Preliminary White Finding
IR 05000395/200500917 October 2005IR 05000395-05-009, on 07/18/2005 - 07/22/2005 for South Carolina Electric & Gas Company; Virgil C. Summer Nuclear Station; Significance of Open Fire Protection IssuesHot Short
Safe Shutdown
Significance Determination Process
IR 05000395/200530119 June 2006NRC Exam Report 05000395/2005301Job Performance Measure
IR 05000395/200600224 April 2006V. C. Summer Integrated Inspection Report 05000395-06-002 and Annual Assessment SummaryTemporary Modification
Significance Determination Process
Downpower
IR 05000395/200600327 July 2006IR 05000395-06-003; 04/01/2006 - 07/01/2006; Virgil C. Summer Nuclear Station; Identification and Resolution of ProblemsSafe Shutdown
Boric Acid
Tornado Missile
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
IR 05000395/200600430 October 2006IR 05000395-06-004, on 07/01/2006 - 09/30/2006 for Virgil C. Summer, Operator Performance During Non-Routine Evolutions and Surveillance TestingHigh winds
Fire Barrier
Significance Determination Process
Job Performance Measure
Earthquake
Fire Protection Program
Power change
IR 05000395/200600525 January 2007IR 05000395-06-005, on 10/01/2006 - 12/31/2006 for Virgil C. Summer; Surveillance Testing and Event FollowupBoric Acid
High Radiation Area
Nondestructive Examination
VT-2
Locked High Radiation Area
Significance Determination Process
Code Reconciliation
IR 05000395/20060063 November 2006IR 05000395-06-006, for Virgil C. Summer Nuclear Station - NRC Safeguards Inspection ReportAffidavit
IR 05000395/200600728 April 2006IR 05000395-06-007; South Carolina Electric & Gas Company; 03/17/2006 - 03/31/2006; Virgil C. Summer Nuclear StationSafe Shutdown
Boric Acid
Packing leak
Stroke time
Internal Flooding
Missed surveillance
Significance Determination Process
License Renewal
Maintenance Rule Program
Pressure Boundary Leakage
Downpower
Unidentified leakage
Siren
IR 05000395/200600827 July 2006IR 05000395-06-008, on 05/22/2006 - 06/23/2006, Virgil C. SummerPast operability
Probabilistic Risk Assessment
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Time Critical Operator Action
Through Wall Leak
IR 05000395/20060099 March 2006IR 05000395-06-009; 1/9/2006 - 3/1/2006; Virgil C. Summer Nuclear Station; Radioactive Material Processing and TransportationOffsite Dose Calculation Manual
Hydrostatic
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
Preliminary White Finding
Exclusive Use
IR 05000395/200601019 June 2006IR 05000395-06-010, on 05/01/2006 - 05/05/2006 for Virgil C. Summer; For-Cause Training InspectionBoric Acid
Operability Determination
Generic Fundamentals Examination
Earthquake
IR 05000395/20060115 May 2006EA-06-046 Final Significance Determination for a White Finding and Notice of Violation (Virgil C. Summer Nuclear Station - NRC IR 05000395-06-011)Significance Determination Process
Preliminary White Finding
IR 05000395/20060121 September 2006IR 05000395-06-012, on 07/31/2006 - 08/04/2006, Virgil C. SummerSignificance Determination Process
Siren
IR 05000395/200601313 October 2006IR 05000395-06-013 on 9/11-15/2006, Virgil C. Summer Nuclear Station Supplemental Inspection for a White Finding in the Public Radiation Safety Cornerstone
IR 05000395/200630128 November 2006V.C. Summer - Exam Report 05000395/2006301
IR 05000395/200640111 October 2006IR 05000395-06-401, (Safeguards Removed) Virgil C. Summer Nuclear StationAffidavit
IR 05000395/200700230 April 2007IR 05000395-07-002; on 01/01/2007 - 03/31/2007 for South Carolina Electric & Gas Company; Virgil C. Summer Nuclear Station, Integrated Inspection Report and Annual Assessment Meeting SummaryOperating Basis Earthquake
Condition Adverse to Quality
Significance Determination Process
Power change
IR 05000395/200700325 July 2007IR 05000395-07-003, on 04/01/2007 - 06/30/2007; Virgil C. Summer Nuclear Station; Routine Integrated Inspection ReportHigh Radiation Area
Offsite Dose Calculation Manual
Locked High Radiation Area
Significance Determination Process
Process Control Program
IR 05000395/200700430 October 2007IR 05000395-07-004, on 07/01/2007 - 09/30/2007, Virgil C. Summer Nuclear Station, Surveillance TestingBoric Acid
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Operability Determination
Earthquake
IR 05000395/200700524 January 2008IR-05000395-07-005, on 10/01/2007 - 12/31/2007, Virgil C. Summer Nuclear Station, Examination of Activities Conducted Under License as Related to Safety and Compliance with Commission Rules and Regulations and License ConditionsGrab sample
Internal Flooding
Probabilistic Risk Assessment
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Earthquake
Unidentified leakage