Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000483/20040013 March 2004Annual Assessment Letter - Callaway Plant (NRC Report 05000483-04-001)Fitness for Duty
Siren
IR 05000483/20050012 March 2005Annual Assessment Letter - Callaway Plant (Report 05000483/2005001)
IR 05000483/20060012 March 2006Annual Assessment Letter - Callaway Plant (NRC Inspection Report 05000483-06-001)
IR 05000483/20070012 March 2007Annual Assessment Letter - Callaway Plant (NRC Inspection Report 05000483-07-001)
IR 05000483/20100013 March 2010(NRC Inspection Report 05000483-10-001)B.5.b
IR 05000483/20110014 March 2011Annual Assessment Letter for Callaway Plant (Report 05000483-11-001)
IR 05000483/20120015 March 2012Annual Assessment Letter for Callaway Plant (Report 05000483/2012001)
IR 05000483/20120064 September 2012Mid-Cycle Performance Review and Inspection Plan - Callaway Plant (05000483/2012006)
IR 05000483/20128014 March 2013Annual Assessment Letter for Callaway Plant (Report 05000483/2012801)
IR 05000483/20130014 March 2014Annual Assessment Letter for Callaway Plant (Report 05000483/2013001)
IR 05000483/201340526 September 2013Callaway Plant - Notification of TI-186 Inspection (NRC Inspection Report 05000483-13-405) and Request for Information
IR 05000483/20140062 September 2014Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2014006)Spent Fuel Pool Instrumentation
IR 05000483/20144022 September 2014Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2014402)
IR 05000483/20150051 September 2015Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2015005)B.5.b
IR 05000483/20150062 March 2016Annual Assessment Letter for Callaway Plant (Report 05000483/2015006)Spent Fuel Pool Instrumentation
IR 05000483/201600512 September 2016Errata for Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005)Spent Fuel Pool Instrumentation
IR 05000483/20160061 March 2017Annual Assessment Letter for Callaway Plant (Report 05000483/2016006)Spent Fuel Pool Instrumentation
IR 05000483/201640131 August 2016Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2016401)
IR 05000483/201700528 August 2017Updated Inspection Plan (Report 05000483/2017005)Spent Fuel Pool Instrumentation
IR 05000483/20170061 March 2018Annual Assessment Letter for Callaway Plant (Report 05000483/2017006)Enforcement Discretion
Cyber Security
Functionality Assessment
Open Phase Condition
Operability Determination
IR 05000483/20180064 March 2019Annual Assessment Letter for Callaway Plant (Report 05000483/2018006)Enforcement Discretion
Cyber Security
IR 05000483/201900530 August 2019Updated Inspection Plan for Callaway Plant Unit 1, Report No. 05000483/2019005Fitness for Duty
Cyber Security
IR 05000483/20190063 March 2020Annual Assessment Letter for Callaway Plant (Report 05000483/2019006)Fitness for Duty
Operator Manual Action
Open Phase Condition
IR 05000483/20200051 September 2020Updated Inspection Plan for Callaway Plant (Report 05000483/2020005)Cyber Security
Exemption Request
Coronavirus
IR 05000483/20210051 September 2021Mid-Cycle Inspection Plan Transmittal Letter for Callaway Plant (Report 05000483/2021005)Cyber Security
Exemption Request
Power-Operated Valves
COVID-19
IR 05000483/20210062 March 2022Annual Assessment Letter for Callaway Plant (Report 05000483/2021006)Fitness for Duty
Enforcement Discretion
Cyber Security
Exemption Request
Power-Operated Valves
COVID-19
IR 05000483/202200523 August 2022Updated Inspection Plan for Callaway Plant (Report 05000483/2022005)Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
Power-Operated Valves
COVID-19
IR 05000483/20220061 March 2023Annual Assessment Letter for Callaway Plant (Report 05000483/2022006)Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
IR 05000483/202300523 August 2023Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
IR 05000483/202401224 October 2023Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012)Cyber Security
ML02240075126 August 2002Midcycle Performance Review and Inspection Plan - Callaway PlantCondition Adverse to Quality
ML03132080324 January 2003Inspection Plan, End of Cycle Review Meeting - CY- 2002
ML03239074027 August 2003Midcycle Performance Review and Inspection Plan - Callaway PlantCondition Adverse to Quality
ML03323013417 November 2003Lt 05000483 - Revised Inspection Schedule Arising from Reorganization of the NRC Region IV Division of Reactor Safety
ML03350015317 November 2003Revised Inspection Schedule Arising from Reorganization of the NRC Region IV Division of Reactor Safety
ML04244053330 August 2004Midcycle Performance Review and Inspection Plan - Callaway Plant
ML05243008930 August 2005Midcycle 2005 Performance Review and Inspection Plan - Callaway Plant
ML07243075731 August 2007Mid-Cycle Performance Review and Inspection Plan - Callaway Plant
ML0806301543 March 2008Annual Assessment End of Cycle Letter for 2007
ML0824204962 September 2008Midcycle Performance Review and Inspection Plan, Report 22
ML0906308024 March 2009Annual Assessment Letter and Inspection Plan 2008
ML0924001421 September 200909/1/2009 Callaway - Midcycle Performance Review and Inspection Plan
ML1024403441 September 2010Mid-Cycle Performance Review and Inspection Plan - Callaway
ML1124401771 September 2011Mid-Cycle Performance Review and Inspection Plan - Callaway Plant
ML13246A2823 September 2013Mid-Cycle Assessment Letter 2013
ML13269A43726 September 2013Notification of TI-186 Inspection (NRC Inspection Report 05000483-13-405) and Request for Information
ML14027A27927 January 2014Information Request for NRC Triennial Baseline Component Design Bases Inspection NRC Inspection Report 05000483-14-007Temporary Modification
ML15023A09623 January 2015Notification of Conduct of a Triennial Fire Protection Baseline IR 05000483/2015007 and Request for InformationSafe Shutdown
Fitness for Duty
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Emergency Lighting
Job Performance Measure
Thermoset
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Exemption Request
Maintenance Rule Program
Fire Protection Program
ML15244B0921 September 2015Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2015401)
ML16237A03331 August 2016Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005)Spent Fuel Pool Instrumentation