ML033230134

From kanterella
Jump to navigation Jump to search
Lt 05000483 - Revised Inspection Schedule Arising from Reorganization of the NRC Region IV Division of Reactor Safety
ML033230134
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/17/2003
From: Chamberlain D
Division of Reactor Safety IV
To: Randolph G
Union Electric Co
References
Download: ML033230134 (6)


Text

November 17, 2003 Garry L. Randolph, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

Subject:

REVISED INSPECTION SCHEDULE ARISING FROM REORGANIZATION OF THE NRC REGION IV DIVISION OF REACTOR SAFETY

Dear Mr. Randolph:

The U.S. Nuclear Regulatory Commission (NRC), Region IV, has reorganized its Division of Reactor Safety (DRS) effective December 28, 2003.

The Divisions inspection duties were formerly divided among three branches:

Operations Branch Plant Support Branch Engineering & Maintenance Branch

 Operator licensing  Security  Safety System Design and

 Identification and  Radiological Performance Capability Resolution of Controls  Permanent Plant Problems (PI&R)  Emergency Modifications Preparedness  Inservice Inspection Activities

 Evaluation of Changes, Tests or Experiments

 Fire Protection

 Heat Sink Performance

 Maintenance Effectiveness Beginning in January, 2004, there will be four DRS inspection branches with inspection responsibilities as follows:

Operations Branch Performance Evaluation Branch

 Initial Operator Licensing  PI&R Lead Responsibility

 Operator Requalification Program  Fire Protection

 Emergency Preparedness  Heat Sink Performance

 PI&R Support  Maintenance Effectiveness

Union Electric Company Engineering Branch Plant Support Branch

 Safety System Design and  Security Performance Capability  Radiological Controls

 Permanent Plant Modifications  PI&R Support

 Inservice Inspection Activities

 Evaluation of Changes, Tests or Experiments

 PI&R Support The reorganization of DRS and the reallocation of inspection duties required changes to the 2004 calendar year inspection schedule. The new DRS inspection schedule for your plant is attached.

Sincerely,

/RA/

Dwight D. Chamberlain, Director Division of Reactor Safety

Enclosure:

as stated Docket: 50-483 License: NPF-30 cc w/enclosure:

Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, MD 20855 John ONeill, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.

Washington, DC 20037 Mark A. Reidmeyer, Regional Regulatory Affairs Supervisor Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251

Union Electric Company Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, MO 65102 Ronald A. Kucera, Deputy Director for Public Policy Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102 Rick A. Muench, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130 Chris R. Younie, Manager Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251 Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102-0116 Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570 Keith D. Young, Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251

Union Electric Company David E. Shafer Superintendent, Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149

Union Electric Company Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (MSP)

Branch Chief, DRP/B (DNG)

Senior Project Engineer, DRP/B (RAK1)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

ADAMS:

  • Yes
  • No Initials: ______
  • Publicly Available
  • Non-Publicly Available
  • Sensitive
  • Non-Sensitive C:EMB C:OB C:PSB C:PBB D:DRS CSMarschall/lmb ATGody TWPruett DGraves DDChamberlain

/RA/ /RA/ /RA/ /RA/ /RA/

11/13/03 11/10/03 11/13/03 11/13/03 11/17/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax