IA-81-223, Forwards Evaluation of Sacrificial Shield Wall Hardship Exemption Request.Nineteen of 21 Weld Joints Should Be Accepted as Is W/O Further Repair.Weld W3-92 Should Be Repaired & W130-197 Should Not Be Accepted | 23 March 1981 | Forwards Evaluation of Sacrificial Shield Wall Hardship Exemption Request.Nineteen of 21 Weld Joints Should Be Accepted as Is W/O Further Repair.Weld W3-92 Should Be Repaired & W130-197 Should Not Be Accepted | Exemption Request |
IA-84-658, Notes That Util Aware of Tech Spec Errors as of 820816. Errors Documented in Plant Quality Deficiency Repts | 5 March 1984 | Notes That Util Aware of Tech Spec Errors as of 820816. Errors Documented in Plant Quality Deficiency Repts | Systematic Assessment of Licensee Performance Exemption Request |
IA-84-940, Notification of 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma,To Review & Inspect Installation of Test Equipment in 1/4 Scale Test Facility | 11 December 1984 | Notification of 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma,To Review & Inspect Installation of Test Equipment in 1/4 Scale Test Facility | |
IA-84-942, Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl | 19 November 1984 | Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl | |
IA-85-261, Documents That Appropriate Corrective Actions Taken by Dow Chemical Co in Response to 780113 Immediate Action Ltr,Per 780207 Enforcement Conference at Facility | 3 March 1978 | Documents That Appropriate Corrective Actions Taken by Dow Chemical Co in Response to 780113 Immediate Action Ltr,Per 780207 Enforcement Conference at Facility | |
IA-85-362, Submits Board Questions Re Identification of Alternate User for Site.Board Will Reschedule Conference Call or Establish New Procedure for Response to Questions | 21 February 1985 | Submits Board Questions Re Identification of Alternate User for Site.Board Will Reschedule Conference Call or Establish New Procedure for Response to Questions | |
IA-85-419, Notification of Significant Meeting on 831118 W/Util in Atlanta,Ga to Discuss Util Program for Recertification of Facility Operating Personnel.Summary of 831111 Meeting W/ Util Encl | 14 November 1983 | Notification of Significant Meeting on 831118 W/Util in Atlanta,Ga to Discuss Util Program for Recertification of Facility Operating Personnel.Summary of 831111 Meeting W/ Util Encl | |
IA-85-452, Forwards Region III 840611 Proposed Enforcement Guidance for QA Program Violations Based on Experiences at Braidwood & Fermi Plants,For Review & Comment.Response Requested by 840720.W/o Enforcement Guidance | 9 July 1984 | Forwards Region III 840611 Proposed Enforcement Guidance for QA Program Violations Based on Experiences at Braidwood & Fermi Plants,For Review & Comment.Response Requested by 840720.W/o Enforcement Guidance | |
IA-85-516, Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities | 31 December 1980 | Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities | Boric Acid Systematic Assessment of Licensee Performance |
IA-85-562, Responds to 850129 Request to Review Pending OL Cases to Determine Impact by Impending Mandate in Ucs Vs NRC Re Exclusion of Results of Emergency Preparedness Exercises from Hearings.Seabrook & Shoreham Will Be Impacted | 20 February 1985 | Responds to 850129 Request to Review Pending OL Cases to Determine Impact by Impending Mandate in Ucs Vs NRC Re Exclusion of Results of Emergency Preparedness Exercises from Hearings.Seabrook & Shoreham Will Be Impacted | |
IA-85-563, Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning | 2 May 1985 | Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning | Safe Shutdown Earthquake Earthquake |
IA-85-602, Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl | 26 April 1982 | Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl | |
IA-85-665, Discusses Seismic Design of Nuclear Power Plants,Including Const of Nuclear Plants in Seismically Active Zones | 25 February 1964 | Discusses Seismic Design of Nuclear Power Plants,Including Const of Nuclear Plants in Seismically Active Zones | Earthquake |
IA-85-668, Partially Withheld Notice of Board Meeting 85-10 | 12 April 1985 | Partially Withheld Notice of Board Meeting 85-10 | |
IA-86-197, Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V | 22 August 1985 | Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V | |
IA-86-280, Forwards Matls Engineering Branch Sser Input to Section 6.2.7 Re Fracture Prevention of Containment Pressure Boundary.Valves Will Comply W/Gdc 51 Based on Util 850312 Commitments | 4 April 1985 | Forwards Matls Engineering Branch Sser Input to Section 6.2.7 Re Fracture Prevention of Containment Pressure Boundary.Valves Will Comply W/Gdc 51 Based on Util 850312 Commitments | |
IA-86-656, Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested | 8 March 1982 | Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested | |
IA-86-793, Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets | 22 September 1986 | Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets | |
IA-87-111, Submits Rept on Plant,As Discussed in ACRS 150th Meeting on 721012-14.Listed Items Can Be Resolved During Const & Facility Can Be Constructed W/Reasonable Assurance for Operation W/O Undue Risk to Public Safety | 19 October 1972 | Submits Rept on Plant,As Discussed in ACRS 150th Meeting on 721012-14.Listed Items Can Be Resolved During Const & Facility Can Be Constructed W/Reasonable Assurance for Operation W/O Undue Risk to Public Safety | Safe Shutdown |
IA-87-121, Discusses Inservice Test Programs Re Full Stroke Exercising of Normally Closed Swing or Tilting Disk Check Valves Per 10CFR50.55a & Section XI of ASME Code | 24 June 1982 | Discusses Inservice Test Programs Re Full Stroke Exercising of Normally Closed Swing or Tilting Disk Check Valves Per 10CFR50.55a & Section XI of ASME Code | |
IA-87-244, Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by Utils | 14 July 1983 | Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by Utils | Internal Flooding Backfit |
IA-87-413, Outlines Plan for Review & Evaluation of Issue Specfic Action Plan Results Rept Isap VII.a.6 (Rev 1), Exit Interviews | 24 February 1987 | Outlines Plan for Review & Evaluation of Issue Specfic Action Plan Results Rept Isap VII.a.6 (Rev 1), Exit Interviews | High Radiation Area |
IA-87-449, Submits Daily Staff Notes for 870709.Licensee Presented Results of Investigations & Proposed Corrective Action Re 870626 Unplanned Heatup Event Resulting in Operating Mode Change from Cold to Hot Shutdown on 870707 in Chicago,Il | 10 July 1987 | Submits Daily Staff Notes for 870709.Licensee Presented Results of Investigations & Proposed Corrective Action Re 870626 Unplanned Heatup Event Resulting in Operating Mode Change from Cold to Hot Shutdown on 870707 in Chicago,Il | |
IA-87-535, Forwards Ofc of Inspector & Auditor Rept Documenting Investigation of Alleged Misconduct by Two NRC Employees. Investigation Did Not Identify Any Misconduct | 23 January 1986 | Forwards Ofc of Inspector & Auditor Rept Documenting Investigation of Alleged Misconduct by Two NRC Employees. Investigation Did Not Identify Any Misconduct | |
IA-87-830, Forwards Assessment of Radiologicals Controls Program at Facility for Period from 860501-1031.W/o Encl | 19 November 1986 | Forwards Assessment of Radiologicals Controls Program at Facility for Period from 860501-1031.W/o Encl | Systematic Assessment of Licensee Performance |
IA-88-129, Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR | 21 March 1988 | Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR | |
IA-88-165, Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl | 9 March 1988 | Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl | Stroke time |
IA-88-356, Forwards SER Supporting Util 870311 & 0407 Requests for Proposed Mods to MSIV Actuation Control Sys.Mods Comply W/ 10CFR50.55a(h) & GDC 21.SALP Input Also Encl | 4 May 1987 | Forwards SER Supporting Util 870311 & 0407 Requests for Proposed Mods to MSIV Actuation Control Sys.Mods Comply W/ 10CFR50.55a(h) & GDC 21.SALP Input Also Encl | |
IA-88-497, Forwards Safety Evaluation Accepting Proposed Reracking of Spent Fuel Storage Pools from Criticality Standpoint.Fuel Enrichment May Be in Conflict W/Table 54 of 10CFR51 & Data Used by Util to Assess Environ Effects.Salp Input Also Encl | 24 June 1988 | Forwards Safety Evaluation Accepting Proposed Reracking of Spent Fuel Storage Pools from Criticality Standpoint.Fuel Enrichment May Be in Conflict W/Table 54 of 10CFR51 & Data Used by Util to Assess Environ Effects.Salp Input Also Encl | |
IA-88-566, Requests NRR Clarification of Licensee Requirements Re Alerting & Assembling Fire Brigade When Unplanned Fire Alarm Received on Control Room Annunciator Panel | 22 February 1988 | Requests NRR Clarification of Licensee Requirements Re Alerting & Assembling Fire Brigade When Unplanned Fire Alarm Received on Control Room Annunciator Panel | Fire Protection Program |
IA-89-226, Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 | 16 September 1987 | Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 | |
IA-92-447, Discusses Util Review Plan Re Shut Down Due to Anchoring Deficiencies | 24 July 1992 | Discusses Util Review Plan Re Shut Down Due to Anchoring Deficiencies | Scram Discharge Volume |
IA-96-492, Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants | 25 November 1996 | Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants | |
IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission | 18 April 1997 | Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission | Safe Shutdown Fitness for Duty Packing leak High Radiation Area Ultimate heat sink Fire Barrier Contraband Emergency Lighting Battery sizing Deep Dose Equivalent Fire Protection Program Fire Watch Scaffolding |
IR 05000117/2004015 | 25 July 1985 | Updates Operating Experience for Plant for 850415-0715. Review Updates Encl 850129 & 0426 Reviews for 841026-850117 & 850117-0415,respectively | |
IR 05000275/1984007 | 21 June 1984 | Forwards Special Insp Rept 50-275/84-07 Re Performance of Plant Operating Crews,Conducted by Region V,Lll & Eg&G Idaho,Inc.Performance Above Average Compared to Similar Licensed Facilities | |
IR 05000275/1985036 | 30 December 1985 | Requests NRR Assume Lead Responsibility for Evaluation & Resolution of Unresolved Item 50-275/85-36-04 Re Fire Dampers | Safe Shutdown Fire Barrier Emergency Lighting Continuous fire watch Fire Watch Hourly Fire Watch |
IR 05000324/1986007 | 28 July 1986 | Forwards Insp Repts 50-325/86-06,50-324/86-07,50-400/86-43, 50-325/86-18,50-324/86-19 & One Internal Document Re Results of Technical Review Re Region II Actions on Miriello Cases.W/O Encl | |
IR 05000354/1997008 | 19 February 1998 | Forwards NRC Operator Licensing Exam Rept 50-354/97-08 (Including Completed & Graded Tests) for Tests Administered on 970929-1002 | Reactor Vessel Water Level Job Performance Measure Failure to Scram |
IR 05000373/1987003 | 4 March 1987 | Forwards Rh Lasky Findings from Special Environ Qualification Insp on 870202-06 for Input to Insp Repts 50-373/87-03 & 50-374/87-04.Insp Checkoff Sheets Also Encl | |
IR 05000373/1993033 | 23 November 1993 | Notification of 931130 Enforcement Conference in Region III Ofc to Discuss Fitness for Duty Issue as Discussed in Insp Repts 50-373/93-33 & 50-374/93-33 | Fitness for Duty |
IR 05000397/1986012 | 25 August 1986 | Notification of 860828 Meeting W/Util in Walnut Creek,Ca to Discuss Apparent Violations Involving Equipment Qualification (50-397/86-12),Region V Team Insp 50-397/86-11 & Control of Combustible Matls | |
IR 05000397/1987006 | 1 July 1987 | Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept | |
IR 05000400/1985048 | 14 July 1986 | Notifies of Ofc of Investigations Discontinuance of Inquiry Q2-85-021 & Related Area of Interest as to Matter Contained in Insp Rept 50-400/85-48.Insp Rept & Notice of Violation May Be Released | |
IR 05000410/1983006 | 2 December 1983 | Discusses 830422 Anonymous Allegation Re Deficiencies in Emergency Diesel Generator Sys,Radiation Containment Sys & Qualifications of Contract Personnel (Allegation Rept Q-1-83-012,based on Insp Rept 50-410/83-06) | |
IR 05000416/1998301 | 26 May 1998 | Forwards NRC Operator Licensing Exam Rept 50-416/98-301 for Tests Administered on 980330-0403 | |
IR 05000416/1999002 | 10 September 1999 | Notification of Significant Licensee Meeting with Entergy Operations,Inc on 991018 to Discuss Listed Topics Identified in NRC Insp Repts 50-416/99-02,99-03 & 99-06 | |
IR 05000445/1978020 | 9 February 1979 | Corrects Notice of Deviation Re Insp Rept 50-445/78-20,per Util 790209 Response | |
IR 05000454/1983038 | 27 January 1984 | Identifies Addl Insp Repts 50-454/83-38 & 50-455/83-28 Re Reinsp Program,Per 840120 Memo | |
IR 05000482/1983013 | 26 July 1983 | Informs That Allegation 4-83-A-17 Re Improper Use of white-out Unsubstantiated.Forwards Insp Rept 50-482/83-13. Engineering Section Insp to Be Conducted.W/O Encl |