Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML18029A39827 February 1985Responds to RM Diggs 850117 & 0211 Ltrs Re Determination of Fees for Const Extension Requests.Util Supports NRC Determination & Will Submit Fees
ML19207B11215 August 1979Forwards Deficiency Rept Re Unacceptable QA Documentation for Glazer Steel Matl
ML19207B14916 August 1979Forwards Final Deficiency Rept Re Defective Type GE SB-12 Auxiliary Switches in safety-related Switchgear
ML19207B96830 August 1979Forwards First Interim Deficiency Rept Re Containment Anchor Bolt Chain Weld Deficiencies
ML19207B97929 August 1979Forwards Final Deficiency Rept Re GE Design Deficiency in safety-relief Valve Control Sys
ML19208B25731 July 1979Responds to NRC 790706 Ltr Re Violations Noted in IE Insp Repts 50-518/79-12,50-519/79-12,50-520/79-12 & 50-521/79-12. Corrective actions:CEP-2.01 Deleted from Manual,Welder Terminated & SOP-34 Drafted to Define Requirements
ML19208D13131 August 1979Responds to IE Bulletins 78-12,12A & 12B, Atypical Weld Matl in Reactor Pressure Vessel Welds. CB&I Submitted Generic Rept on 790501 & C-E Submitted Generic Rept on 790608,satisfying Required Action
ML19208D40824 September 1979Notifies That Util Does Not Plan to Conduct Any Drift Deposition Studies If NRC Concurs.Fee for Proposed Amends Is Determined to Be Class III for Unit 1 & Class I for Units 2-4.Fee Forwarded Separately
ML19209C88811 October 1979Forwards Final Deficiency Rept Re Invalid Heat Treatment of Reactor Pressure Vessel Pedestal Studs
ML19209D1241 October 1979Forwards Final Deficiency Rept Re Faulty Welding by Lakeside Bridge & Steel on Drywell Vent Structure & Reactor Pressure Vessel Pedestal
ML19209D1751 October 1979Forwards Interim Deficiency Rept
ML19210D07513 August 1979Forwards Second Interim Deficiency Rept Re Tensile Anchor Capacities Lower than Assumed in Design Allowables
ML19210D10426 October 1979Forwards Final Deficiency Rept Re Tensile Anchor Capacities Lower than Assumed in Design Allowables
ML19210D34016 November 1979Forwards Interim Rept 1 Re Grit Blasting of Fabricated Pipe Assemblies
ML19210D42326 October 1979Responds to NRC 791005 Ltr Re Violations Noted in IE Insp Repts 50-518/79-22,50-519/79-22,50-520/79-22 & 50-521/79-22. Corrective Actions:Three Point Compaction Tests Performed on Soil Fill & Personnel Instructed to Perform Tests
ML19224D48827 April 1979Submits Rept Re Incorrect Welding of Structural Steel Used in Reactor Pressure Vessel Shield Wall.Corrective Action Includes Radiographing All Joints Incorrectly Cut & Repaired by Welding
ML19241A7861 June 1979Forwards Deficiency Rept Re Spray Pond Central Support Earthfill Moisture Content Being Outside of Acceptable Limits
ML19242B5599 July 1979Forwards Supplemental Response to IE Bulletin 78-12B Concerning Atypical Weld Matl in Reactor Pressure Vessel Welds.Final Responses Will Be Provided After Util Reviews CB&I & C-E Generic Repts
ML19242D1915 July 1979Forwards First Interim Deficiency Rept Re Faulty Welding by Lakeside Bridge & Steel Co on Drywell Vent Structure & Reactor Pressure Vessel Pedestal.Final Rept to Be Forwarded by 791001
ML19249A55016 August 1979Forwards Final Deficiency Rept Re Use of non-ASME Components on Primary Containment Personnel Access Airlocks
ML19249C55110 August 1979Forwards Final Response to IE Bulletin 79-07 Re Seismic Stress Analysis of safety-related Piping.For All Five Benchmark Problems Pisys Results for Frequencies & Model Participation Are in Agreement W/Nrc Problem Definition
ML19249D90917 September 1979Advises of Intent to Implement Proposed TVA 790522 Changes Re Fire Protection Sys Design,To Resolve NRC Concerns Expressed During 790822 Meeting
ML19249E39529 June 1979Forwards Final Deficiency Rept on Breakdown in QC Program at Industrial Engineering Works Re Reactor Pressure Vessel Shield Wall.Initial & Interim Repts Submitted on 790417 & 0517,respectively
ML19250C58421 November 1979Forwards First Interim Deficiency Rept Re Rebar Bending
ML19253A21427 April 1979Requests Info Re Safety & Emergency Planning Requirements
ML19254F7399 November 1979Forwards Socio-economic Monitoring & Mitigation Rept.
ML19256E72125 October 1979Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Table Listing Manufacturer,Model Number,Flow & Plant Application Encl
ML19257A2776 December 1979Forwards Final Deficiency Rept Re Fuel Pool Cooling & Cleanup Lines Pressure Tested Above ACI-318-71 Limits on 791109
ML19257A2826 December 1979Forwards Final Deficiency Re Use of Incorrect Weld Acceptance Criteria on Reactor Pressure Vessel Pedestal Welds
ML19257A32712 December 1979Forwards Second Interim Deficiency Rept Re Use of Incorrect Concrete Mix in Shield Bldg Wall
ML19257A78331 December 1979Forwards Final Deficiency Rept Re Condensate Header Vortex Breakers Omitted from Piping Arrangement Drawings
ML19257B91211 January 1980Forwards Second Interim Deficiency Rept Re Containment Anchor Bolt Chair Weld
ML19259A86013 December 1978Clarifies Previous 781129 Ltr to NRC Re Impacts on Caves of Hartsville Nuclear Power Plant Transmission Line Corridors. Also Requests Copy of Citation of Study Used by NRC to to Determine That TVA Will Protect Cavern Sys from Impacts
ML19259C21617 May 1979Submits Interim Deficiency Rept:Breakdown in QC Program at Industrial Engineering Works on Reactor Pressure Vessel Shield Wall.Initial Rept to M Gouge on 790417.Final Rept to Be Transmitted 790702Nondestructive Examination
ML19260D04431 January 1980Forwards Final Deficiency Rept Re Grit Blasting of Fabricated Piping Assemblies
ML19261B9188 February 1979Responds to NRC 790118 Ltr Re Violations Noted in IE Insp Repts 50-518/79-03,50-519/79-03,50-520/79-03 & 50-521/79-03. Corrective Actions:Decision to Be Made Soon to Either Delete Deviation Request from QA or Establish Firmer Control
ML19261D52925 May 1979Forwards Deficiency Rept Re Const of Piping Elbows W/Unspecified Matl
ML19262C3621 February 1980Forwards Final Deficiency Rept Re Rebar Not Bending in Accordance W/Specs
ML19263B30819 December 1978Responds to NRC 781122 Ltr Re Violations Noted in IE Insp Repts 50-518/78-12,50-519/78-12,50-520/78-12 & 50-521/78-12. Corrective Actions:Will Discuss Excursions of Ph in Rept for Second Year of Const,Jan 1979
ML19263C4912 February 1979Forwards Hartsville Nuclear Plants Special Const Effects Monitoring Study,Rept for Second Year of Const, Dtd Jan 1979 W/Encl 781222 EPA Ltr & Natl Pollutant Discharge Elimination Sys Permit No TN0027740
ML19263C72815 February 1979Follows Up 781006 Rept(Ncr CHT/PB-78-1)on Use of non-ASME Components on Primary Containment Personnel Access Airlocks. Expects Final Rept to Be Transmitted by 790816.Sufficient Info Not Yet Available
ML19263D7015 March 1979Responds to NRC 790208 Ltr Re Violations & Deviations Noted in IE Insp Repts 50-518/79-01,50-519/79-01,50-520/79-01 & 50-521/79-01.Corrective Actions:Reemphasize Proper Cold Weather Protection Procedures & Follow ANSI Requirements
ML19269B9247 December 1978Forwards Deficiency Rept Re HPCS Motor Control Center Wiring Discrepancies(Nrc HNP-A-013)
ML19271A88730 June 1980Responds to NRC 800611 Telcon Re Violations Noted in IE Insp Repts 50-518/80-07,50-519/80-07,50-520/80-07 & 50-521/80-07. Corrective Actions:Special Task Force Formed to Investigate Welding Program
ML19271A8914 June 1980Responds to NRC 800509 Ltr Re Violations Noted in IE Insp Repts 50-518/80-07,50-519/80-07,50-520/80-07 & 50-521/80-07. Corrective Actions:Welders Will Be Issued Temp Indicating Device to Measure Preheat Temp
ML19273B41928 February 1979Suppl to Final Rept on Reportable Deficiency Re High Pressure Core Spray Motor Control Center Wiring Discrepancies.Corrective Actions Should Be Completed by 790928,rather than 790301 as Indicated Earlier
ML19274D34812 January 1979Forwards Reasons for Decision to Remove Charcoal Filtration Equipment on Containment Exhaust.Requests Notification by 790401 If Disagreement W/Action Exists
ML19290B72415 November 1979Forwards Final Deficiency Rept Re Design Deficiency of T- Head Section of Anchor/Darling Gate Valves
ML19290C9416 December 1979Responds to NRC 791116 Ltr Re Violations Noted in IE Insp Repts 50-518/79-24,50-519/79-24,50-520/79-24 & 50-521/79-24. Corrective Actions:Revision Requested Eliminating Requirement for Traceability of Weld Matl to Production
ML19290E67618 January 1980Responds to NRC 800107 Ltr Re Violations Noted in IE Insp Repts 50-518/79-24,50-519/79-24,50-520/79-24 & 50-521/79-24. Corrective Actions:Alternative QC Method Will Be Used to Insure Highest Std of Electrodes