Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20055A122 | 28 June 1982 | Ack Receipt of IE Insp Rept 70-1113/82-06 on 820310-11 & 0426.No Proprietary Info | |
ML20055C709 | 29 May 1990 | Submits 30-day Incident Rept Re Ammonium Diuranate (Adu) Clarifier Tank Pump Explosion on 900429.Weak Solution Ammonium Nitrate Found Concentrated in Pump Inadvertently Left in Operation.Startup of Adu Operations Initiated | |
ML20055C840 | 21 June 1990 | Responds to NRC Requesting Addl Info Re License SNM-1097 Renewal & GE Environ Rept Submitted in May 1989.Addl Data for Items 1-9 Noted in NRC Ltr & Explanation of Selected Tables to Facilitate NRC Review Encl | |
ML20055E628 | 15 June 1990 | Forwards Fnmc Plan Changes.Encl Withheld (Ref 10CFR2.790(d)) | |
ML20056A774 | 3 August 1990 | Submits Rept of 900708 Incident Involving Lightning Damage to GE Criticality Warning Sys,Per 10CFR20.403(b)(4). Criticality Warning Sys Repaired & Improved Design Configurations Installed | |
ML20056B354 | 24 August 1990 | Forwards Nonproprietary Version of 900802 Application for Amend to License SNM-1097 Re U Recovery from Lagoon Sludge | |
ML20056H394 | 19 August 1993 | Forwards Revised LEU Physical Inventory Summary Rept for Period 911011-920823.Rev Reflects Changes to Reported U Quantities of Prior Period Adjustment & Seid Limit,Resulting from Typo Change & Rounding Difference.Rept Withheld | |
ML20057B490 | 10 September 1993 | Requests Extension Until 931022 for Providing Response to Suppl 1 to NRC Bulletin 91-001 Re Compatibility or Rev of Licensee Reporting Procedures,As Result of Late Receipt of Bulletin & Schedule Conflicts | |
ML20058F270 | 22 November 1993 | Requests Rescheduling of Independent Radiation Safety Review Date Until After Implementation of Revised 10CFR20 Requirements.Review Will Be Conducted During Mar-May 1994 Time Frame | |
ML20058F897 | 14 July 1982 | Responds to NRC Re Violations Noted in IE Insp Rept 70-1113/82-10.Corrective Actions:Auditors to Be Instructed in Proper Survey Techniques W/Emphasis on Speed & Distance Considerations | |
ML20058K116 | 7 December 1993 | Informs Change of Name of GE Facility in Wilmington,Nc from Nuclear Fuel & Components Mfg to Nuclear Energy Production | |
ML20059A355 | 13 December 1993 | Notifies of Cancellation of Plans to Construct New Bldg Under License SNM-1097 | |
ML20059A733 | 20 October 1993 | Responds to NRC Bulletin 91-001,Suppl 1 Re Reporting Loss of Criticality Safety Controls.Confirms That Licensees Current Reporting Criteria & Mgt Implementation Procedures Meet Minimum Reporting Criteria Specified in Revised Bulletin | |
ML20059F965 | 20 August 1990 | Forwards Changes in Fnmc Plan.Changes Withheld (Ref 10CFR2.790) | |
ML20062J391 | 25 October 1993 | Forwards Addl Info Requested as Attachment to Ltr Re Limit on Intake or Derived Air Concentrations,In Response to Ltr & 931019 Telcon | |
ML20125C035 | 15 October 1992 | Forwards Revised Physical Inventory Summary Rept for LEU for 911011-920823.Rept Withheld (Ref 10CFR2.790) | |
ML20125D794 | 11 December 1992 | Responds to NRC Re Violation Noted in Insp Rept 70-1113/92-16 on 921012-16.Corrective Actions:Automated Database Established for Nuclear Safety Release/Requirements Logging,Data Recording,Insp & or Recordkeeping Requirements | |
ML20126A512 | 10 May 1985 | Forwards Justification for & Revs to Items 3,4 & 5 of Fundamental Nuclear Matl Control Plan for Approval.Encl Withheld (Ref 10CFR2.790) | |
ML20126A519 | 5 April 1985 | Requests Allowances Be Granted for Certain SNM Inventory Requirements Described in Encl.Encl Withheld (Ref 10CFR2.790) | |
ML20126J841 | 21 January 1981 | Forwards Revision to Fundamental Nuclear Matl Control Plan for License SNM-1097.Revision Withheld (Ref 10CFR2.790) | |
ML20127E759 | 28 February 1985 | Responds to NRC Re Violations Noted in Insp Rept 70-1113/84-18.Corrective Actions:Handwritten Instruction Identifying Immediate Notification W/Protective Action Recommendations Included in Director Manual | |
ML20127K015 | 1 March 1985 | Responds to NRC Re Violations Noted in Insp Rept 70-1113/84-17.Corrective Actions:Computerized Termination Dose Reporting Program Installed for Final Termination Repts as Soon as Info Available | |
ML20127K038 | 5 April 1985 | Responds to NRC Re Violations Noted in Insp Rept 70-1113/84-17.Corrective Actions:Routine Contamination Surveys Increased,Locations Tested for Fixed & Removable Radiation,Procedures Reworded & Filtration Hood Installed | |
ML20128C739 | 8 March 1985 | Responds to NRC Re Violations Noted in Insp Rept 70-1113/84-14.Corrective Actions Withheld (Ref 10CFR2.790) | |
ML20128G300 | 4 October 1996 | Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 70-1113/96-204 on 960805-09.Corrective Actions:Logs for Each Area Maintained in Separate Locked Storage Area | |
ML20128H109 | 7 October 1996 | Responds to NRC Re Violations Noted in Insp Rept 70-1113/96-202.Corrective Actions:Process Safety Mgt Descriptive Document Has Been Developed for GE-Wilmington Facility | |
ML20128K563 | 17 May 1985 | Ack Receipt of Insp Rept 70-1113/85-07 on 850414-19 | |
ML20128L621 | 19 June 1985 | Responds to Violations Noted in Insp Rept 70-1113/84-16. Corrective Actions:Fundamental Nuclear Matl Control Plan Will Be Revised | |
ML20128M569 | 1 February 1993 | Forwards Changes to Fundamental Nuclear Matl Control Plan. Encls Withheld (Ref 10CFR2.790).W/o Encls | |
ML20129B651 | 10 June 1985 | Forwards Revs to Fundamental Nuclear Matl Control Plan.Revs Withheld (Ref 10CFR2.790) | |
ML20129B725 | 27 September 1996 | Forwards Corrected semi-annual Effluent Rept for Period of Jan-June 1996.Single Stack Was Not Included in Total Gaseous Effluent Quantities Reported in 960826 Rept | |
ML20129E195 | 20 March 1985 | FOIA Request for 15 Specific Insp Repts,Jm Taylor/Mg Ratner & Motion to Institute Proceedings for Imposition of Civil Penalties Signed by MG Ratner |