Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 70-1113/96-204 on 960805-09.Corrective Actions:Logs for Each Area Maintained in Separate Locked Storage Area
ML20128G300
Person / Time
Site: 07001113
Issue date: 10/04/1996
From: Reda R
GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9610080429
Download: ML20128G300 (2)


Text

.

j GE Nuclear Energy w.

cewu acma cem F 0 Bau 760. Vdl@mp:n NCIM0:

swww l

i October 4,1996 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 l

Subject:

REPLY TO NOTICE OF VIOLATION

References:

(1)

NRC License SNM-1097, Docket 70-1113 (2)

NRC Inspection Report 70-1113/96-204 Dated 9/5/96 l

Thank you for your letter reporting the results of the inspection conducted at our licensed l

fuel fabrication plant by Mr. D. L. Whaley and S. R. Caudill of your office on August 5-9, l

1996.

l t

l The inspection report comments and suggestions are helpful to us in our continuing efforts to improve our programs and ensure our compliance with NRC regulations and license conditions.

Pertaining to the items of apparent noncompliance with NRC requirements in your letter, the reply is given in the Attachment 1 to this letter.

l l

Please contact T. P. Winslow on (910) 675-5461, if you have any questions or would like to discuss the matter further.

Sincerely, GE N CLEAR EN L

R. Reda, Manager Fuels and Facility Licensing I

/zb I

attachment cc: RJR-96-114 G. L. Troup - Region ll I

y (j,7 [

P. Ting - Headquarters 9610080429 961004 PDR ADOCK 07001113 C

PDR

l i

s I

U.S. NRC Document Control Desk October 4,1996 Page 1 of 1 ATTACHMENT 1 l

The information given below refers to the items in Enclosure 3, " Notice of Violation", in the NRC Inspection Report 70-1113/96-204 dated September 5,1996.

l l

Violation 96-204-02:

I Section 6.2.6.2, " Tamper-Safe Seal Access," of the Fundamental Nuclear Material Control Plan (FNMCP) states the following:

l Tamper-safe seals are locked in storage cabinets or rooms and remain secured until issued to a user. Each user is required to maintain tamper-safe seals in a secured area when unattended.

l l

Contrary to the above, the licensee failed to maintain seals in a secured condition until issued to a user, in that inadequate key control was being maintained for the key 9 to the locks securing the seals. Those keys were not adequately secured to maintain appropriate controls.

This is a Severity ;evel IV violation (Supplement Ill).

GE RESPONSE I

l The inadequate key security observed for personnel with authorized access to tamper I

indicating devices (TIDs) was the result of inadequate training to sensitize the personnel in maintaining a high level of security for the key associated with the locked TIDs. In the Bundle Assembly / Packing area, the TID padlocks were replaced with combination l

padlocks prior to the conclusion of the NRC inspection on 8/9/96 to preclude the need to rely on physical key control for multi-authorized individuals. With respect to the Powder Pack area, separate single indiviouals are assigned responsibility for each locked TIDs l

storage location. For all TlO locations the personnel authorized for TID access have been instructed to maintain a high level of security by not providing the keys / combinations to non-authorized individuals, and to always maintain the combinations and/or keys in a secured manner that is not accessible to non-authorized individuals. Additionally, the logs for each area are now maintained in a separate locked storage area with equivalent high level of sensitivity for security of the combinations and/or keys. Based on these completed actions, GE is in full compliance to assure continued security of the TIDs.