ML20056B354

From kanterella
Jump to navigation Jump to search
Forwards Nonproprietary Version of 900802 Application for Amend to License SNM-1097 Re U Recovery from Lagoon Sludge
ML20056B354
Person / Time
Site: 07001113
Issue date: 08/24/1990
From: Winslow T
GENERAL ELECTRIC CO.
To: Haughney C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20056B355 List:
References
NUDOCS 9008280172
Download: ML20056B354 (3)


Text

p a

f, l

GE Nuclear Energy,

i ksor fuel & Ccmpootws AWatruwg.

i:

' &mem! Ekctnc Cctrpy

' PO Bax 763 \\Winngtort NC 28G St.9 6754000 August 24, 1990 Director Office of Nuclear Material Safety and Safeguards

-U.S.

Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr.

C.

J. Haughney, Chief Fuel Cycle Safety Branch OWFN, Room 6D23, Mail 6Hi

Dear Sir:

Subject:

Non-Proprietary Version of GE's 8/2/90 Submittal'

~

References:

(1) Lotter, TP Winslow to RM Bernero, 5/23/89 (2) Letter, TP Winslow to uJ Haughney, 8/2/90 On August 2, 1990, General Electric Company's Nuclear Fuel and

" Components Manufacturing (NF&CM) submitteC.a license amendment request:for permission to utilize the Uranium Recovery From Lagoon

= Sludge (URLS) project facility for the purpose of conducting

~

-uran.um recovery development and' processing.

In order to provide

-the;NRC with a clear understanding of the proposed process, the submittal contained information of a proprietary nature and was

, requested to be withheld from^public disclosure.

NF&CM hereby submits a non-proprietary version of the 8/2/90 submittal as committed in the application.

Since this is a major addition to our current licensed activities,

'e have prepared this non-proprietary version in a format and page w

numbering sequence for insertion into Part I and Part II of our License Renewal Application dated 5/22/89.

900828o172 900824 gfPDR ADOCK0700ggg3 ec i

IWlyi

g.y ki.

...q.

yi g ~ L* b t

+

e h(

Id Director-ONMSS*-

l" p,

< August L 24,7.19 9 0.-

[;

-Paged 2-7; F

t

. Attachment 1 contains a descr1ption of the requestedLrevisions_.and.-

F-

! Attachment 2 is_the' revised pages.

m General Electric personnel would be' pleased'toidiscuss--this. matter-

.s

.further with you and:.your: staff.as-you may deem necessary,.

-[

~ Sincerely, e

y,

.GE NUCLEAR ENERGY h

I T. Preston Winslow, Manager.

Licensing.& Nuclear Materials Management

i

/sbml 1

Attachment 0

.i

~cc:

SD Ebneter - Region.II J-l TPW-90-121

{-

i-i

'l

_:)

?!!-.

f A

~

{ ; :p J-h,.[

~

p v

ung g

. Aj.

  • =
', [ pf

$4 l

F Mr. C. J. Haughney J Il L

'. August: 24,:1990 h i

Page 1 of.1 1 i

T F

ATTACHMENT 1

?-

' DESCRIPTION'OF REQUESTED' REVISIONS-

' /

Pace (s)-

Description 6,

Rag l sed to reflect the addition of Section-15.22.

7 Revised to reflect (1) the' addition of Section 15.22 on page 6, (2) the. addition of Section 1.5.1.4 on page I-1.5, and (3) to change necessary subsequent page numbers due to the.

L. "'

addition.

L 12 Revised-to reflect the addition of Section-15.22 on pages II-15.146 through II-15.-176.

f~)L-i I-l'.5 Revised to include new Section 1.5.1.4 for the

" t, Uranium Recovery from Lagoon Sludge (URLS)'

[,-

project.

J-1,6 These pages have been' renumbered with no chan,a g..

I-1.17-to the content.

.II-15.146 -

Added to include the Safety Demonstration.of the:

II-15.176.

'URLS Project

. i:1 l l:

o e

l'

y i

t 6

\\

u