ML20056B354
| ML20056B354 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 08/24/1990 |
| From: | Winslow T GENERAL ELECTRIC CO. |
| To: | Haughney C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20056B355 | List: |
| References | |
| NUDOCS 9008280172 | |
| Download: ML20056B354 (3) | |
Text
p a
f, l
GE Nuclear Energy,
i ksor fuel & Ccmpootws AWatruwg.
i:
' &mem! Ekctnc Cctrpy
' PO Bax 763 \\Winngtort NC 28G St.9 6754000 August 24, 1990 Director Office of Nuclear Material Safety and Safeguards
-U.S.
Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr.
C.
J. Haughney, Chief Fuel Cycle Safety Branch OWFN, Room 6D23, Mail 6Hi
Dear Sir:
Subject:
Non-Proprietary Version of GE's 8/2/90 Submittal'
~
References:
(1) Lotter, TP Winslow to RM Bernero, 5/23/89 (2) Letter, TP Winslow to uJ Haughney, 8/2/90 On August 2, 1990, General Electric Company's Nuclear Fuel and
" Components Manufacturing (NF&CM) submitteC.a license amendment request:for permission to utilize the Uranium Recovery From Lagoon
= Sludge (URLS) project facility for the purpose of conducting
~
-uran.um recovery development and' processing.
In order to provide
-the;NRC with a clear understanding of the proposed process, the submittal contained information of a proprietary nature and was
, requested to be withheld from^public disclosure.
NF&CM hereby submits a non-proprietary version of the 8/2/90 submittal as committed in the application.
- Since this is a major addition to our current licensed activities,
'e have prepared this non-proprietary version in a format and page w
numbering sequence for insertion into Part I and Part II of our License Renewal Application dated 5/22/89.
900828o172 900824 gfPDR ADOCK0700ggg3 ec i
IWlyi
g.y ki.
...q.
yi g ~ L* b t
+
e h(
Id Director-ONMSS*-
l" p,
< August L 24,7.19 9 0.-
[;
-Paged 2-7; F
t
. Attachment 1 contains a descr1ption of the requestedLrevisions_.and.-
F-
! Attachment 2 is_the' revised pages.
m General Electric personnel would be' pleased'toidiscuss--this. matter-
.s
.further with you and:.your: staff.as-you may deem necessary,.
-[
~ Sincerely, e
y,
.GE NUCLEAR ENERGY h
I T. Preston Winslow, Manager.
Licensing.& Nuclear Materials Management
- i
/sbml 1
Attachment 0
- .i
~cc:
SD Ebneter - Region.II J-l TPW-90-121
{-
i-i
'l
_:)
?!!-.
f A
~
{ ; :p J-h,.[
~
p v
ung g
. Aj.
- =
- ', [ pf
$4 l
F Mr. C. J. Haughney J Il L
'. August: 24,:1990 h i
- Page 1 of.1 1 i
T F
ATTACHMENT 1
?-
' DESCRIPTION'OF REQUESTED' REVISIONS-
' /
Pace (s)-
Description 6,
Rag l sed to reflect the addition of Section-15.22.
7 Revised to reflect (1) the' addition of Section 15.22 on page 6, (2) the. addition of Section 1.5.1.4 on page I-1.5, and (3) to change necessary subsequent page numbers due to the.
L. "'
addition.
L 12 Revised-to reflect the addition of Section-15.22 on pages II-15.146 through II-15.-176.
- f~)L-i I-l'.5 Revised to include new Section 1.5.1.4 for the
" t, Uranium Recovery from Lagoon Sludge (URLS)'
[,-
project.
J-1,6 These pages have been' renumbered with no chan,a g..
I-1.17-to the content.
.II-15.146 -
Added to include the Safety Demonstration.of the:
II-15.176.
'URLS Project
. i:1 l l:
o e
l'
- y i
t 6
\\
u