ML20056H394

From kanterella
Jump to navigation Jump to search
Forwards Revised LEU Physical Inventory Summary Rept for Period 911011-920823.Rev Reflects Changes to Reported U Quantities of Prior Period Adjustment & Seid Limit,Resulting from Typo Change & Rounding Difference.Rept Withheld
ML20056H394
Person / Time
Site: 07001113
Issue date: 08/19/1993
From: Winslow T
GENERAL ELECTRIC CO.
To: Burnett
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19310D691 List:
References
NUDOCS 9309090247
Download: ML20056H394 (1)


Text

'

70 -N/A a-y

~

GENuclearEnergy Nacit=ar iael & Corrpturents Manufacticing j[ '

PO Boa 780, n71aungton. NC?MC2

' I f '_/

GeneraiDectac Corrmany i

i 919 675 5333

('

\\

FM@e August 19, 1993 ErfA4 Director Division of Fuel Cycle Safety & Safeguards U.S.

Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Burnett:

Subject:

Revised Physical Inventory Summary Report

Reference:

NRC License SNM-1097, Docket 70-1113 With regard to activities authorized under NRC License SNM-iO97, attached is a revised LEU Physical Inventory Summary Report for the General Electric' Company Nuclear Fuel and Components Manufacturing operation for the period of October 11, 1991.through August 23, 1992.

.This revision reflects changes.to the reported uranium quantities of prior period adjustment (line 8) ' and the SEID limit (line 12a).

These changes result from a typographical change to line 8, and a rounding difference to line 12a.

The attar hed summary contains 10 CFR -2.790-(d)"information.

General Electric Company therefore requests that this report be withheld from public disclosure.

Sincerely, GE NUCLEAR ENERGY

// &

0900.11 T. Preston winslow, Manager Licensing & Nuclear Materials Management i

/zb Attachment cc:

TPW-93-083 b

DR Joy h

9309090247 930819 4

PDR ADOCK'07001113

/-

C PDR 3