Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML19249C10328 August 1979Responds to 790730 Request for Submittal of New or Amended Physical Security Plan Pursuant to 10CFR73.47 Re Snm.Info Withheld (Ref 10CFR2.790)
ML19254D64724 October 1979Forwards Executed Amend 13 to Indemnity Agreement E-30
ML19263B3383 January 1979Responds to NRC 781220 Ltr Re Violations Noted in IE Insp Rept 50-160/78-05.Corrective Actions:More Rigorous Schedule for bi-weekly Analysis & Reactor Operation Staff Will Perform Measurement of Shim Safety Reactivity Worths
ML19263C05723 January 1979Answers Questions Raised by NRC in Response to Ga Tech 780913 Request for Mod of App a to License R-97.Answers Concern Organizational Changes & shim-safety Blade MaintShutdown Margin
ML19269E31822 June 1979Forwards Amend 12 to Indeminty Agreement E-30
ML19294A80914 March 1979Responds to 790312 Ltr Requesting Info Re Reactivity Worths for the Shim Safetys in the Reactor.Describes Discrepancies Between Differential Worth Curves Due to Measuring Reactor Under Different Circumstances
ML19305E4769 April 1980Responds to NRC 800321 Ltr Re Violations Noted in IE Insp Rept 50-160/80-01.Corrective Actions:First Portion of Current Audit Conducted on 800324 & Schedule for Remaining Portion Will Be Developed in Apr
ML19305E47813 July 1971Repsonds to Questions 3,4,6,7 & 13 Per Div of Reactor Licensing Request Re Proposed Amend to Operate at 5 Mw. Existing Cooling Tower for Secondary Water Is two-cell Unit. Collection Basin & Pump Suction Well Common to Both UnitsEmergency Lighting
ML19309F0934 April 1980Notifies That 30-day LER for 800305 Event Will Be Forwarded on 800411 Due to Continuing Problem W/Coolant Flow Anomoly
ML19318B32523 June 1980Forwards Proposed Physical Security Plan. Plan Withheld (Ref 10CFR2.790)
ML19323G42927 May 1980Requests Extension Until 800625 to Complete Necessary Changes for Submittal of Amended Security Plan. Implementation of Plan Would Be Accomplished within 30 Days Following NRC Approval
ML19332C09016 November 1989Forwards Response to Violations Noted in Insp Rept 50-160/89-05.Response Withheld (Ref 10CFR2.790(d))
ML20004F94419 June 1981Forwards Revised Pages for Proposed Physical Security Plan, Per 810522 Request.Plan Withheld (Ref 10CFR2.790)
ML20005F8776 January 1990Responds to Violations Identified in Insp Rept 50-160/89-02. Corrective Actions:Procedure 4000 Revised & Being Reviewed Against Stds ANS 7.60 & Procedure 7247 Drafted to Cover Area & Is Undergoing Review
ML20006A5143 January 1990Forwards Mod to Security Plan.Mod Withheld (Ref 10CFR2.790(d))
ML20006D5359 February 1990Forwards Addl Response to Violations Noted in Insp Rept 50-160/89-05.Encl Withheld (Ref 10CFR2.790(d))
ML20009A18430 June 1981Forwards Annual Operating Repts for 1978-80,in Response to NRC Request
ML20011F41127 February 1990Forwards Proposed Rev to Physical Security Plan.Rev Withheld (Ref 10CFR2.790)
ML20011F4201 March 1990Forwards Mod to Physical Security Plan.Mod Withheld (Ref 10CFR2.790)
ML20012A17727 February 1990Forwards Proposed Changes to Georgia Tech Research Reactor Physical Security Plan. Changes Withheld (Ref 10CFR2.790)
ML20012A35026 January 1990Comments on Three Questions from 900123 Senior Reactor Operator & Reactor Operator Written Exams
ML20027E0805 October 1982Submits Public Version of Request for Exemption from Emergency Plan Requirements.Reactor de-energized & in Shutdown Since June 1979.Plan Would Delay Preparation of Decommissioning Plans
ML20040B2364 December 1981Forwards Response to NRC 811106 Ltr Re Violations Noted in IE Insp Repts 50-160/81-02 & 50-276/81-02.Encls Withheld (Ref 10CFR2.790)
ML20055G27917 July 1990Responds to Violations Noted in Insp Rept 50-160/90-02. Corrective Actions:Procedure 9310,Posting of Radiological Control Areas & Matls, Revised to Clarify Requirement for Positive Control Over High Radiation AreaHigh Radiation Area
ML20055H83120 July 1990Approves Public Release of 900606 Request for Tech Spec Amend
ML20056A10431 July 1990Responds to NRC 900720 Request for Addl Info Re 900605 Request for Amend to License R-97Shutdown Margin
ML20063M91920 August 1982Responds to NRC Re Violation Noted in IE Insp Rept 50-160/82-01.Corrective Actions:Importance & Specified Requirement to Perform Heat Balance Every Wk Whenever Reactor Is Operated at Above 1 MW Discussed W/Staff
ML20065D9773 September 1982Forwards Public Version of Draft Proposed Emergency Plan
ML20065N8164 October 1982Responds to NRC Re Violations Noted in IE Insp Rept 50-160/82-02.Corrective Actions:Personnel CounseledHigh Radiation Area
ML20066G4923 November 1982Forwards Public Version of Proposed Emergency Plan
ML20072V03910 March 1983Responds to NRC Re Violations Noted in IE Insp Rept 50-160/82-01.Corrective Actions:Data Will Be Logged in Immediately Upon Reaching Desired Power & Procedure 2000 Revised to Require Recording of More Complete Set of Data
ML20082T7927 October 1983Responds to NRC Re Violations Noted in IE Insp Rept 50-160/83-01.Corrective Actions:All Radiological Safety Personnel Advised to Take More Care in Labeling Radioactive Matl Containers
ML20091A95526 April 1984Responds to NRC Re Violations Noted in IE Insp Rept 50-160/84-01.Corrective Actions:Procedure 7202 Revised to Incorporate Instrument Setup Instructions & Procedure 4000 Revised to Include Containment Bldg Test Steps
ML20091E08525 May 1984Forwards Dismantling & Disposal Plan for AGN-201 Training Reactor.Fuel Will Be Removed Per Plan Procedures, Packaged in Approved Containers & Moved to Storage Vault. Comprehensive Radiation Survey Performed
ML20091R62211 June 1984Forwards Organization Chart Effective on 840701 & Advises of Appointment of RA Karam as Director of Nuclear Research Ctr. Ltr of Appointment Encl
ML20091R6502 December 1983Advises That RA Karam Will Replace Jl Russell as Director of Georgia Inst of Technology Nuclear Research Ctr Effective 831203
ML20092P15325 May 1984Responds to NRC Re Violations Noted in IE Insp Rept 50-276/84-02.Corrective Actions:Dismantling & Disposal Plan Encl,Emergency Procedures Appended & Emergency Drill Planned for Summer 1984
ML20098F15826 September 1984Requests Authorization to Dismantle Agn 201 Reactor for Eventual Termination of License R-111.Reactor Has Not Been Operated Since 1979.Dismantling Plan Submitted on 840525
ML20100M21011 April 1985Responds to Re Carter Request for Smearable Surface Contamination in Disintegrations Per Minute Per 100 CM2 & Imbedded Contamination in Components of Agn 201 Measured in Ur/H at 1 Meter.Smearable Contamination Measurements Encl
ML20106J3324 February 1985Submits Addl Info Re Decommissioning of Facility,Per .Radiation Safety Officer,Deputy & Health Physicist Present During Defueling Process.Integral Neutron Exposures Obtained from Film Badges
ML20117J3737 May 1985Requests Deadline for Full Implementation of Approved Emergency Plan Be Extended from 850614 to 851014.Extension Required Due to Possible Physical Mod of Facility
ML20117J4817 May 1985Requests to Move Defueled Agn 201 to Fenced Area of Research Ctr Due to Room Being Wired for New Spectrometer Scheduled for Delivery in Jul 1985.Decommissioning Application Being Reviewed by NRC
ML20136J18720 November 1985Advises That Emergency Preparedness Plan Implemented on 851014.Emergency Procedures Encl
ML20137E24915 August 1985Informs That Defueled Components of AGN-201 Training Reactor Moved from Emerson Bldg to Neely Nuclear Research Ctr,Per .Listed Radiological Surveys Conducted.Survey Results Encl
ML20137P59028 January 1986Forwards Amend 14 to Indemnity Agreement E-30.Item 2 of Attachment to Agreement Deleted in Entirety & Substituted
ML20137P61520 November 1985Requests 60-day Extension to Remove Unirradiated High Enriched U Fuel from Facility,Exemption from Developing QA Program for Shipping Fuel & Approval to Retain Three Elements of U-235,in Response to Show Cause Order
ML20137P63315 November 1985Requests Registration as User of Model ETR
ML20138N7939 December 1985Responds to Violations Noted in Insp Repts 50-276/85-02 & 50-160/85-03 on 850826-29.Corrective Actions:New Procedure for Analyzing Liquid Waste Appended.W/Two Oversize Encls
ML20138R8968 November 1985Confirms Recent Telcon Granting Extension of Time Until 851218 to Respond to Insp Rept 50-160/85-03.Extension Necessary Due to Experimentation & Data Gathering to Verify Quantity of Ar-41 Escaping from Containment Bldg
ML20148C06315 March 1988Advises That Federal Funding Unavaliable for Conversion of Reactor Fuel from High to Low Enrichment.Doe Has Withdrawn Offer to Initiate Conversion Because Reactor Operations May Not Be Continued.Doe Encl