ML20091R622

From kanterella
Jump to navigation Jump to search
Forwards Organization Chart Effective on 840701 & Advises of Appointment of RA Karam as Director of Nuclear Research Ctr. Ltr of Appointment Encl
ML20091R622
Person / Time
Site: Neely Research Reactor
Issue date: 06/11/1984
From: Karam R
Neely Research Reactor, ATLANTA, GA
To: Thomas C
Office of Nuclear Reactor Regulation
Shared Package
ML20091R623 List:
References
NUDOCS 8406150185
Download: ML20091R622 (3)


Text

C ,

t Georgia Institute of Technology R

NEELY NUCLEAR AESEAACH SCHOOL ]F NUCLEAR ENGINEERING AND HEALTH PHYSICS ATLANTA, GECAGIA 30332 (4043894 3600 CENTER June 11, 1984 Mr. Cecil 0. Thomas, Chief Standardization Special Project Branch Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Thomas:

Re: Docket No. 50-160 During a telephone conversation with Mr. Robert E. Carter of your staff, it was apparent that your office was not aware of the personnel changes that have taken place at the Georgia Institute of Technology reactors GTRR and AGN-201. A copy of a letter dated December 2, 1983, from Dr. Walter O. Carlson to Dr. David M. Verrelli of NRC, Region II, informing him of my appointment as Director of the Nuclear Research Center, is enclosed. A copy of a second letter from John Brighton to me appointing me to be in charge of the AGN-201 is also enclosed.

In addition to personnel changes, the organization for the management of the GTRR will change, effective July 1, 1984 from what appears on page 39 of the Technical Specifications of the GTRR (enclosed as old organization chart) to what appears in the enclosed "new" organization chart. The management of Georgia Tech prefers that the Director of the Nuclear Research Center reports to the President of Georgia Tech through the Vice President for Research instead of through the Dean of Engineering. Should this change require an amendment to our Technical Specifications then please consider this letter as a request to amend our Technical Specifications. Thank you.

Sincerely, kN0 Ratib A. Karam

  1. W Interim Director RAK/jlr I

Enclosures:

As stated I \

0406150185 840611 ,

PDR ADOCK 05000160 m.-

A PDR A Umt d the Universdy System W Georgia An Equal Educanon and Ernployment opportundy Institution ,

1

1 .

M-4 .z X e_,

PRESIDENT 4Q A%are OF -

GEORGIA TECll u

VICE PRESIDENT ,

FOR R ESEAllC11 1

u ItADIATION NUCLEAR

! PROTECTION ? DIRECTOR H*

SAFEGUARD COMMITTEE NUCLEAR RESEARCil CENTER COMMITTEE s

%f REACTOR

  • SUPEllVISOR i

%/

REACTOlt

{ ENGINEElt 9/

REACTOR l OPERATING ,

1 STAFF t'

l

v _

, , , . ~ .. .. i f

r%

l s

OLD ORGANIZATION CHART

~~-----

~

PRESIDENT I

Georrfa Tech I e

Vice President for Radiological Nuclear esearch

, Safety Officer Safeguards Com::tittee .  !

Dean Engineering g 1- i

- I Director-Nuclear Eneineerine I

I t

O'. Director -. . .

Nuclear Research Center Reactor Supervisor

1 Reactor Engineer Reactor Operating .

Staff e

e e

.t l . .

c

,