05000424/LER-1990-006, Responds to NRC 940509 Demand for Info Re Actions of Four Individuals Associate W/Plant in Finalizing 900629 Cover Ltr for Rev to LER 90-006 | 31 July 1994 | Responds to NRC 940509 Demand for Info Re Actions of Four Individuals Associate W/Plant in Finalizing 900629 Cover Ltr for Rev to LER 90-006 | |
05000424/LER-1991-004, Submits Addl Info Re Amended 2.206 Petition Filed by M Hobby & a Mosbaugh Re Failure to Comply W/Tech Spec 3.0.4 on Entry Into Mode 6 on 900301,described in LER 91-004-00 | 10 December 1991 | Submits Addl Info Re Amended 2.206 Petition Filed by M Hobby & a Mosbaugh Re Failure to Comply W/Tech Spec 3.0.4 on Entry Into Mode 6 on 900301,described in LER 91-004-00 | |
05000424/LER-1997-002, Forwards LER 97-002-02,per 10CFR50.73.Encl Is Second Rev to LER Originally Submitted on 970220 & First Revised on 970730.Revs Are Marked W/Rev Bars in Left Hand Border | 3 March 1998 | Forwards LER 97-002-02,per 10CFR50.73.Encl Is Second Rev to LER Originally Submitted on 970220 & First Revised on 970730.Revs Are Marked W/Rev Bars in Left Hand Border | |
05000424/LER-1997-004, Corrected Copy of Forwarding LER 97-004-00,re Condition Discovered to Exist on 970322 | 16 April 1997 | Corrected Copy of Forwarding LER 97-004-00,re Condition Discovered to Exist on 970322 | |
05000424/LER-1998-001, Forwards LER 98-001-01 Re Concrete Degradation Found in DG Exhaust Barriers.Changes Made Under Rev Marked W/Rev Bars on Left,Outside of LER Border | 25 March 1998 | Forwards LER 98-001-01 Re Concrete Degradation Found in DG Exhaust Barriers.Changes Made Under Rev Marked W/Rev Bars on Left,Outside of LER Border | |
05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi | 10 May 1999 | Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed | |
05000424/LER-1998-007, Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.73 | 13 January 1999 | Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.73 | |
05000424/LER-1998-009, Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 981229 | 27 January 1999 | Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 981229 | |
05000425/LER-1998-004, Forwards LER 98-004-01 Re Defeat of Turbine Trip Function That Lead to Improper Mode Entry.Revised LER Corrects Statement Re Generation of Turbine Trip Signal Upon Operating Reactor Trip Breakers | 10 September 1998 | Forwards LER 98-004-01 Re Defeat of Turbine Trip Function That Lead to Improper Mode Entry.Revised LER Corrects Statement Re Generation of Turbine Trip Signal Upon Operating Reactor Trip Breakers | |
05000425/LER-1998-005, Forwards LER 98-005-01,extending Completion Date for Corrective Action 6 Which Is Necessary to Involve Offsite Engineering Organizations in Performance of Broadness Review.Corrective Actions 2 & 5 Have Been Updated | 24 August 1998 | Forwards LER 98-005-01,extending Completion Date for Corrective Action 6 Which Is Necessary to Involve Offsite Engineering Organizations in Performance of Broadness Review.Corrective Actions 2 & 5 Have Been Updated | |
A850208, Submits Results of Review of Des (NUREG-1087).DES Consistent W/State,Social,Economic,Physical Goals,Policies,Plans & Programs.Dept of Natural Resources Comments Encl | 20 February 1985 | Submits Results of Review of Des (NUREG-1087).DES Consistent W/State,Social,Economic,Physical Goals,Policies,Plans & Programs.Dept of Natural Resources Comments Encl | |
B10630, Forwards Revision to Physical Security Plan.Revision Withheld (Ref 10CFR2.790) | 9 December 1982 | Forwards Revision to Physical Security Plan.Revision Withheld (Ref 10CFR2.790) | |
B12287, Remits Insp Fees for Facilities & Matls Licenses for First Quarter 1986.Invoices Encl | 17 October 1986 | Remits Insp Fees for Facilities & Matls Licenses for First Quarter 1986.Invoices Encl | |
DD-97-06, Provides NRC Staff W/Reply to Issues Raised in Re Director Decision DD-97-06 Issued on 970318,in Response to Petition Filed,Per 10CFR2.206 | 29 July 1997 | Provides NRC Staff W/Reply to Issues Raised in Re Director Decision DD-97-06 Issued on 970318,in Response to Petition Filed,Per 10CFR2.206 | |
ELV-00013, Forwards Revs to Physical Security & Contingency Plan,Per NRC .Revs Withheld (Ref 10CFR73.21 & 2.790) | 21 November 1988 | Forwards Revs to Physical Security & Contingency Plan,Per NRC .Revs Withheld (Ref 10CFR73.21 & 2.790) | |
ELV-00015, Forwards Revised Response to Violations Noted in Insp Rept 50-424/88-29.Encl Withheld (Ref 10CFR73.21 & 2.790) | 23 November 1988 | Forwards Revised Response to Violations Noted in Insp Rept 50-424/88-29.Encl Withheld (Ref 10CFR73.21 & 2.790) | |
ELV-00036, Forwards Fifth Suppl to Summary Rept of Plant Startup Test Program.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal | 30 November 1988 | Forwards Fifth Suppl to Summary Rept of Plant Startup Test Program.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal | |
ELV-00062, Responds to NRC Bulletin 88-003 Requesting That Insps Be Performed for All GE latching-type Hfa Relays in Class 1E Applications.Fourteen GE 12HFA54E187H Relays Inspected on 881108 for Unit 1 & on 880606 for Unit 2 | 7 December 1988 | Responds to NRC Bulletin 88-003 Requesting That Insps Be Performed for All GE latching-type Hfa Relays in Class 1E Applications.Fourteen GE 12HFA54E187H Relays Inspected on 881108 for Unit 1 & on 880606 for Unit 2 | |
ELV-00254, Forwards Personnel Resumes for Review by Commissioner Rogers.W/O Encls | 9 February 1989 | Forwards Personnel Resumes for Review by Commissioner Rogers.W/O Encls | |
ELV-00272, Forwards Cycle 1 Radial Peaking Factor Limit Rept,Per Tech Spec 6.8.1.6 & Elevation Dependent Peaking Factor Versus Core Height Graph | 3 April 1989 | Forwards Cycle 1 Radial Peaking Factor Limit Rept,Per Tech Spec 6.8.1.6 & Elevation Dependent Peaking Factor Versus Core Height Graph | |
ELV-00273, Forwards Sixth Suppl to Summary Rept of Startup Test Program.Initial Summary Rept Submitted on 870831.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal | 28 February 1989 | Forwards Sixth Suppl to Summary Rept of Startup Test Program.Initial Summary Rept Submitted on 870831.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal | |
ELV-00275, Forwards Response to Violations Noted in Insp Rept 50-424/89-06.Response Withheld | 28 February 1989 | Forwards Response to Violations Noted in Insp Rept 50-424/89-06.Response Withheld | |
ELV-00294, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Per 10CFR50,App J | 28 February 1989 | Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Per 10CFR50,App J | |
ELV-00304, Forwards Revised Response to Violation Noted in Insp Rept 50-424/88-56 on 881029-1216.Corrective Actions:Performance of post-refueling Outage Containment Insp & Evaluation Upgraded & Operations Personnel Briefed on Subj Notice | 7 March 1989 | Forwards Revised Response to Violation Noted in Insp Rept 50-424/88-56 on 881029-1216.Corrective Actions:Performance of post-refueling Outage Containment Insp & Evaluation Upgraded & Operations Personnel Briefed on Subj Notice | |
ELV-00310, Responds to Violations Noted in Insp Rept 50-424/88-61. Corrective Actions:Shift Operators Counseled on Failure to Follow Procedural Requirements of Procedure 10001-C | 7 March 1989 | Responds to Violations Noted in Insp Rept 50-424/88-61. Corrective Actions:Shift Operators Counseled on Failure to Follow Procedural Requirements of Procedure 10001-C | |
ELV-00311, Informs of Completion of 1,000 H Availability Test of Spds. Several Radiation Monitors out-of-svc During Part of Test Period or for Entire Test Period.W/Monitors Excluded from Test Criteria,Availability of 99.936% Achieved | 10 March 1989 | Informs of Completion of 1,000 H Availability Test of Spds. Several Radiation Monitors out-of-svc During Part of Test Period or for Entire Test Period.W/Monitors Excluded from Test Criteria,Availability of 99.936% Achieved | |
ELV-00330, Forwards Suppl to Rev 11 to Emergency Plan.Suppl Corrects Administrative Errors | 14 March 1989 | Forwards Suppl to Rev 11 to Emergency Plan.Suppl Corrects Administrative Errors | |
ELV-00332, Forwards Response to Re Request for Certain Existing Plant Documents to Be Utilized in Development of risk-based Insp Guide.W/O Attachments | 14 March 1989 | Forwards Response to Re Request for Certain Existing Plant Documents to Be Utilized in Development of risk-based Insp Guide.W/O Attachments | |
ELV-00336, Requests NRC Comments Re Reactor Trip Breaker Maint Frequency by 890421.Based on Westinghouse Recommendations, Maint Interval of 500 Operations,Or 18 Months,Whichever Comes First,More Appropriate for Group a Maint | 28 March 1989 | Requests NRC Comments Re Reactor Trip Breaker Maint Frequency by 890421.Based on Westinghouse Recommendations, Maint Interval of 500 Operations,Or 18 Months,Whichever Comes First,More Appropriate for Group a Maint | |
ELV-00340, Forwards Revised Monthly Operating Rept for Jan 1989 & Monthly Operating Rept for Feb 1989 for Vogtle,Units 1 & 2 | 15 March 1989 | Forwards Revised Monthly Operating Rept for Jan 1989 & Monthly Operating Rept for Feb 1989 for Vogtle,Units 1 & 2 | |
ELV-00342, Forwards Executed Amend 4 to Indemnity Agreement B-107 | 16 March 1989 | Forwards Executed Amend 4 to Indemnity Agreement B-107 | |
ELV-00358, Completes Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Instrumentation for Unisolable Sections of Piping to Detect Adverse Temp Distributions Installed & Data Collection Initiated | 27 March 1989 | Completes Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Instrumentation for Unisolable Sections of Piping to Detect Adverse Temp Distributions Installed & Data Collection Initiated | |
ELV-00365, Forwards Comments on Sser 8.Spent Fuel Storage Racks Will Have Boraflex on All Sides,Including Sides Adjacent to Fuel Pool Walls | 16 March 1989 | Forwards Comments on Sser 8.Spent Fuel Storage Racks Will Have Boraflex on All Sides,Including Sides Adjacent to Fuel Pool Walls | |
ELV-00373, Provides Rept of Present Level of Insurance & Sources of Insurance for Plant,Per 10CFR50.54(W)(2) | 23 March 1989 | Provides Rept of Present Level of Insurance & Sources of Insurance for Plant,Per 10CFR50.54(W)(2) | |
ELV-00376, Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Util Identified 759 Molded Case Circuit Breakers Being Maintained as safety-related Spares in Unit 1 Warehouse as of 881205 | 31 March 1989 | Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Util Identified 759 Molded Case Circuit Breakers Being Maintained as safety-related Spares in Unit 1 Warehouse as of 881205 | |
ELV-00378, Responds to Violations Noted in Insp Rept 50-425/89-03. Corrective Actions:Controls in Place & Implemented to Identify,Track & Review Deficiencies for Reportability | 28 March 1989 | Responds to Violations Noted in Insp Rept 50-425/89-03. Corrective Actions:Controls in Place & Implemented to Identify,Track & Review Deficiencies for Reportability | |
ELV-00432, Responds to Station Blackout Rule.Blackout Start Procedure & Restoration of Offsite Ac Power for Shutdown Added to Existing Procedures for Coping W/Station Blackout.Mods Required to Obtain 4 H Coping Duration Listed | 12 April 1989 | Responds to Station Blackout Rule.Blackout Start Procedure & Restoration of Offsite Ac Power for Shutdown Added to Existing Procedures for Coping W/Station Blackout.Mods Required to Obtain 4 H Coping Duration Listed | Safe Shutdown |
ELV-00436, Forwards Response to Violations Noted in Insp Rept 50-424/89-09 on 890202-03.Response Withheld | 7 April 1989 | Forwards Response to Violations Noted in Insp Rept 50-424/89-09 on 890202-03.Response Withheld | |
ELV-00449, Forwards Amend 12 to Physical Security Plan.Amend Withheld (Ref 10CFR73.21) | 28 April 1989 | Forwards Amend 12 to Physical Security Plan.Amend Withheld (Ref 10CFR73.21) | |
ELV-00458, Forwards Amend 5 to Indemnity Agreement B-107 | 21 April 1989 | Forwards Amend 5 to Indemnity Agreement B-107 | |
ELV-00473, Submits Change to Initial Startup Test Program Described in Chapter 14 of Fsar.Change Adds Footnote to Test Abstract for Containment,Auxiliary,Control & Fuel Handling Bldgs Drain Sys | 1 May 1989 | Submits Change to Initial Startup Test Program Described in Chapter 14 of Fsar.Change Adds Footnote to Test Abstract for Containment,Auxiliary,Control & Fuel Handling Bldgs Drain Sys | Boric Acid |
ELV-00475, Forwards Vogtle Unit 1 Annual Rept,Part 2 | 1 May 1989 | Forwards Vogtle Unit 1 Annual Rept,Part 2 | |
ELV-00476, Requests Extension for Annual Simulator Test Until mid-Jul 1989.Proposes Extension of Deadline for First Annual Operability Test to 900228,to Allow Testing to Be Performed After New Models Are Operational & Allow Acceptance Test | 28 April 1989 | Requests Extension for Annual Simulator Test Until mid-Jul 1989.Proposes Extension of Deadline for First Annual Operability Test to 900228,to Allow Testing to Be Performed After New Models Are Operational & Allow Acceptance Test | |
ELV-00478, Forwards Objectives & Scope of Annual Emergency Preparedness Exercise Scheduled for 890726.Exercise Will Not Involve Evaluated Participation by State or County Agencies | 8 May 1989 | Forwards Objectives & Scope of Annual Emergency Preparedness Exercise Scheduled for 890726.Exercise Will Not Involve Evaluated Participation by State or County Agencies | |
ELV-00484, Informs of Change in Distribution for NRC Correspondence Due to Recent Completion of Const of Unit 2 & Relocation of Nuclear Operations Corporate Ofc to Birmingham,Al.Revised List Encl | 1 May 1989 | Informs of Change in Distribution for NRC Correspondence Due to Recent Completion of Const of Unit 2 & Relocation of Nuclear Operations Corporate Ofc to Birmingham,Al.Revised List Encl | |
ELV-00488, Informs of Two Minor Errors to Be Corrected in NRC Hearing for Plant Full Power License.Organization Described on Figures 13.1.1-1 & 13.1.1-2 of Plant FSAR | 1 May 1989 | Informs of Two Minor Errors to Be Corrected in NRC Hearing for Plant Full Power License.Organization Described on Figures 13.1.1-1 & 13.1.1-2 of Plant FSAR | |
ELV-00499, Submits Three Changes to Description of Initial Startup Test Program in Chapter 14 of Fsar.Changes Add Footnote to Test Abstract for Boron Thermal Regeneration Sys & Liquid Waste Processing Sys | 11 May 1989 | Submits Three Changes to Description of Initial Startup Test Program in Chapter 14 of Fsar.Changes Add Footnote to Test Abstract for Boron Thermal Regeneration Sys & Liquid Waste Processing Sys | Hydrostatic |
ELV-00503, Forwards Status of Control Room Design Review,Human Engineering Discrepancies & Similarity Review Remaining Issues. All Confirmatory Items Addressed Except Annunicator Nuisance Alarms | 9 May 1989 | Forwards Status of Control Room Design Review,Human Engineering Discrepancies & Similarity Review Remaining Issues. All Confirmatory Items Addressed Except Annunicator Nuisance Alarms | |
ELV-00512, Forwards Proprietary Rev 1 to WCAP-11312 & Nonproprietary Rev 1 to WCAP-11966, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/Surveillance.... Proprietary Rept Withheld (Ref 10CFR2.790) | 25 July 1989 | Forwards Proprietary Rev 1 to WCAP-11312 & Nonproprietary Rev 1 to WCAP-11966, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/Surveillance.... Proprietary Rept Withheld (Ref 10CFR2.790) | |
ELV-00515, Responds to Violations Noted in Insp Repts 50-424/89-10 & 50-425/89-12 on 890208-0317.Corrective Actions:Qc Inspector Counseled Re Failure to Comply W/Procedure 85301-C Requirements & Personnel Appraised of Problem | 18 May 1989 | Responds to Violations Noted in Insp Repts 50-424/89-10 & 50-425/89-12 on 890208-0317.Corrective Actions:Qc Inspector Counseled Re Failure to Comply W/Procedure 85301-C Requirements & Personnel Appraised of Problem | |