Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML17207A69530 September 1979Technical Evaluation Opposing Proposed Tech Spec Changes That Remove Requirement for 8-h Ac Power Source Surveillance When Limiting Conditions for Operation Are Not Met.Changes Do Not Conform to Reg Guide 1.93 or Tech Specs
ML17212B4171 February 1982Equipment Environ Qualification,Review of Licensees' Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info
ML17212B78331 May 1982Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant Unit 2,FL Power & Light Co, Draft Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML17213A4985 October 1981Technical Evaluation of Adequacy of Station Electric Distribution Sys Voltages for St Lucie Nuclear Power Plant, Unit 1.Offsite Circuit
ML17213A73217 September 1982Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation ReptEarthquake
Backfit
ML17214A15526 April 1983Radiological Effluent Tech Specs (RETS) Implementation - St Lucie Unit 1 Nuclear Generating Plant.Boric Acid
Grab sample
Offsite Dose Calculation Manual
Process Control Program
Power change
ML17214A15829 April 1983Control of Heavy Loads (C-10) St Lucie Unit 1, Draft Technical Evaluation ReptSafe Shutdown
Coatings
Control of Heavy Loads
ML17214A20430 April 1983Draft Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase I), Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML17214A4542 March 1983Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept
ML17214A69331 October 1983Conformance to NRR Generic Ltr 82-16,St Lucie Plant,Units 1 & 2, Preliminary Rept
ML17216A43313 January 1986SPDS Progress Review,St Lucie 1 & 2.Backfit
ML17219A68730 June 1987Conformance to Generic Ltr 83-28,Item 2.2.2, 'Vendor Interface Program for All Other Safety-Related Components:St Lucie 1 & 2,' Final Rept
ML17222A74131 January 1989Technical Evaluation Rept on Second Ten-Year Interval Inservice Insp Program Plan:Florida Power & Light Co,St Lucie Plant,Unit 1.Hydrostatic
Incorporated by reference
Liquid penetrant
ML17223A12931 December 1988Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1.Loop seal
Anticipated operational occurrence
Operating Basis Earthquake
Design basis earthquake
ML17223A13231 December 1988Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2.Loop seal
Anticipated operational occurrence
Operating Basis Earthquake
Design basis earthquake
ML17223B32331 August 1991TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2).Anticipated operational occurrence
Safe Shutdown Earthquake
Earthquake
Fuel cladding
ML17228A88530 September 1994Errata to TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,St Lucie 1 & 2, Replacing Every Other Missing Page in Original Rept
ML17228B12631 March 1995Technical Evaluation Rept on Second 10-Year Interval Insp Program Plan.Hydrostatic
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
Scaffolding
ML17229A41527 May 1997Technical Evaluation Rept of IPE Submittal & RAI Responses for St Lucie Nuclear Plant.Boric Acid
Ultimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
ML17229B00131 January 1998Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2.Hot Short
Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Coatings
Tornado Generated Missile
Design basis earthquake
Earthquake
Fire Protection Program
Fire Watch
ML17229B06716 March 1999Technical Evaluation Rept, Florida Power & Light Co, Unit 1 Third Ten-Year Interval Pump & Valve Inservice Testing Program,Unit 2 Second Ten-Year Interval Pump & Valve Inservice Testing Program.Boric Acid
Shutdown Margin
Stroke time
Incorporated by reference
Cold shutdown justification
ML17301A00128 September 1982ECCS Repts (F-47),TMI Action Plan Requirements,St Lucie Unit 1, Technical Evaluation Rept
ML17301A01324 November 1982PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),St Lucie Unit 1, Technical Evaluation ReptBoric Acid
Shutdown Margin
ML17301A06231 October 1983Control of Heavy Loads at Nuclear Power Plants,St Lucie Plant,Unit 2 (Phase Ii).Safe Shutdown
Control of Heavy Loads
ML17301A16728 February 1985Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2.Grab sample
ML17301A18417 June 1985Masonry Wall Design (B-59),Florida Power & Light Co,St Lucie Unit 1, Technical Evaluation ReptOperating Basis Earthquake
Finite Element Analysis
Tornado Generated Missile
ML17308A21530 April 1986First Interval Inservice Insp Program,St Lucie Unit 2, Technical Evaluation ReptHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML17308A23930 June 1987Integrated Leak Rate Test for St Lucie Nuclear Power Plant (Unit 2) Apr 1987-June 1987, Technical Evaluation Rept
ML17308A24231 May 1986Rev 1 to Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2.Grab sample
ML17308A28931 January 1987Review of Tech Spec Changes Supporting NUREG-0737 Accident Instrumentation,St Lucie Units 1 & 2, Technical Evaluation Rept
ML17308A44631 March 1988Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at St Lucie Unit 2.Tornado Missile
ML17308A48231 May 1989Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components,St Lucie 1/2, Technical Evaluation Rept
ML17308A50417 August 1990Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation.Safe Shutdown
Boric Acid
ML17309A66530 November 1991Technical Evaluation Rept Pump & Valve Inservice Testing Program,St Lucie-Unit 1.Boric Acid
Shutdown Margin
Stroke time
Power-Operated Valves
Power Operated Valves
ML17309A74730 September 1994Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:St.Lucie-1/-2.
ML17334B03330 November 1986Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28.
ML17334B07231 March 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck.
ML17347A59331 July 1987Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept
ML17355A28030 September 1998Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point.Fire Barrier
Coatings
ML18040B18931 August 1987Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs.
ML18052B19330 June 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept
ML18141A30531 December 1983Definition of Operable,Kewaunee Nuclear Power Plant.
ML18150A11930 April 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept
ML18150A18830 April 1987Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept
ML18152A58330 April 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2.
ML19332B61431 October 1989Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components:Quad Cities 1 & 2, Final Technical Evaluation ReptSafe Shutdown
ML20023A4862 September 1982Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation ReptHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
ML20023A48910 September 1982Inservice Insp Program, Technical Evaluation Rept
ML20023E17831 May 1983Copper in the Intake and Discharge Zones of the Surry and Salem Nuclear Power Stations
ML20024B95731 July 1983Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant.